Presentation is loading. Please wait.

Presentation is loading. Please wait.

WLPT Phase 2 items. COP and ISC.

Similar presentations


Presentation on theme: "WLPT Phase 2 items. COP and ISC."— Presentation transcript:

1 WLPT Phase 2 items. COP and ISC.
WLTP-10-39e WLPT Phase 2 items. COP and ISC. JAPAN 16/4/2015

2 Japan feedback on WLTP Phase2 questioner
COP/ISC Proposed discussion point at WLTP Phase2 Develop or clarify the test procedure when production / in-use vehicles are tested, not framework itself. For example; Clarification on which maintenance or adjustment are allowed before testing.(e.g. replacing tires, adjust alignment, etc) Which test method should be taken. RoadLoad determination Type approval ISC COP CO2 value Emissions R/L value

3 END


Download ppt "WLPT Phase 2 items. COP and ISC."

Similar presentations


Ads by Google