Gene Allen, Proj. Mgr. Bee Ridge WRF Septage Replacement, Carlton WTP-FPL Parallel Agreement, Fruitville Wrf Master P.S. Bypass, McIntosh WM & FM Loop Replacement, Santo Lift Station Decommissioning, Taylor Ranch School WM Looping, Utility Repair/Rehab, Vacuum P.S. Vibration Analysis, Warm Mineral Springs Sewer Imp, CIP TBD Jaimol Charles, PE, Proj. Mgr. Bee Ridge Sewer, Bee Ridge Water, Potable Water Looping, Septic System Replace. Prog., Area ‘D’, Ph 3,4, Snook Haven Park Utility Imp, CIP TBD Unit Price Spec Development, Seton Katz, PE, Proj. Mgr. Cattlemen Road WM Interconnect, Dona Bay Water Treatability Study, Fiber Connection to Carlton Water Plant, Mission Control Upgrades Phases 1 & 2, SCADA System Master Plan, Glenn Richter, PE, Proj. Mgr. Bee Ridge WRF Expansion to 12 mgd, Carlton WTF Capacity Upgrade, CCWRF Phase 3 Expansion to 6 mgd, Fruitville WRF Improvements, North County ASR, Reuse, North County Deep Inject Well, Siesta Key Master PS+FM, Venice Gardens WRF Expansion to 3 mgd, Jan 2014 revision Adnan Javed, PE, Proj. Mgr. 10 th St Boat Basin STW Assessment, Alfred Park Rehab, Bliss Road Rehab, Gottfried Crk STW Assessment, Gulf Gate Area 1 Rehab, 75863A1 Gulf Gate Area 2 Rehab, 75863A2 Honore Ave Pipe Rehab, US41 Canal, Peter Peduzzi, PE, Proj. Mgr. Bermuda Brook Weir Rehab, Briarwood Pond Diffusers/Electrical D/C, 75502BPD Briarwood Irrigation Well D/C, 75502BIW Briarwood Pond Plantings D/C, 75502BPP Celery Fields WQ Monitoring, Downtown COS STW Assessment, Kensington Park STW Assessment, N of Whitaker Bayou STW Assessment, Paver Park Est STW Assessment, Ziegler & Walker Site FDEP Monitoring, 75829, D/C Curtis Smith, PG, Proj. Mgr. Greenwich STW Assessment, Pinecraft Area Rehab, Saralake Est STW Assessment, South Gate East STW Assessment, South Siesta Key Beach Restoration Ph 2, Spoil Island Restoration Rebid, Scott Lyday, PE, Proj. Mgr. North County ASR Reuse, PCSSRP Area I, PCSSRP Area M, PCSSRP Area O, PCSSRP Area P, Siesta Key Large Meter Replacement, Waterline Extension Area ‘I’, Waterline Extension Area O, Waterline Extension Area M, Legend: indicates changes to this report indicates project on hold Jack Gibson, Proj. Mgr. Bee Ridge Landfill Gradient Control System & Pump Station Reconditioning, Bee Ridge Road Extension Utilities, CCWRF DIW, Lift Station Rehabilitation 2012, Lockwood Ridge FM, Oak Ford Pump Station & Force Main, Venice Gardens WRF Expansion, John Saputo, Proj. Mgr. Bee Ridge Forcemain Replacement, Meadowood, Atlantic, Plantation WRF & Plantation WTP Demo, North Jetty Beach Park Restrooms, Septic System Replace Program Area N2, Siesta Key Large Water Meter Replacement, Snook Haven Park Utility Imp, Brenda Bair, PE Environmental Design Gregory Rouse, PE Utilities Design Carlyn O’Reilly, PE, Proj. Mgr. John Chapman, Utilities/Environmental Construction Inspections Helen Bristol, Inspector Betty Thomas, Team Lead Inspection Jeff Luetjen, Inspector Bee Ridge FM Replacement, Lockwood Ridge FM Interconnect, Oak Ford Pump Station & Force Main, Darren Stubbs, Inspector Vacant FTE Venice Gardens TWP Water Sys Imp, Chad Hinkley, Survey Party Chief Fred Moser, Survey Assistant Field Support Butch Lanaville, Proj. Mgr. Central County Basin SS Rehab, Colonial Gables Improvements, Gulf Gate Basin SS Rehab, Infiltration Inflow Reduction Phase 2, Manhole & Stwtr Structure Rehab UPC, 75832, San Pipeline Infrastructure Rehab UPC, Stwtr Pipeline Infrastructure Rehab UPC, Paul Semenec, Proj. Mgr. Bay Island Park Seawall, Celery Mound Phase 3, & Palmer Blvd Street Tree Project, Hudson Bayou WQI, Lyons Bay Sunaire ESTIL, Red Bug Slough Restoration, South Creek Bayou #1, 75307