Gene Allen, Proj. Mgr. Bee Ridge WRF Septage Replacement, 88006 Carlton WTP-FPL Parallel Agreement, 55983 Fruitville Wrf Master P.S. Bypass, 88010 McIntosh.

Slides:



Advertisements
Similar presentations
Portland Water Bureau Upcoming CIP Projects
Advertisements

PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Capital Improvement Program City of Snoqualmie Public Works Department.
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Presented by: Ronald O. Nichols LADWP General Manager
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
1 Collection System And Wastewater Treatment Plant Sewer Update
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Utilities Planning Group UPCOMING REQUESTS FOR PROPOSALS Larry Tunnell, PE, PG Chief Engineer.
Florida Engineering Society 1. 2 Penny Projects Now working - Transportation Improvements –Bayside Bridge –Bryan Dairy Road –McMullen Booth Road –East.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
1. DRAFT 2 Encourage Economic Growth Establish Regional Branding Committee Identify two Businesses to Receive SEED Incentive Grants Complete Construction.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
The Corporation of the Town of Amherstburg Public Works Department March 21, CAPITAL BUDGET.
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
WaterFirst Workshop September 9, Wastewater Treatment and Management.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
DISTRICT D and E PRESENTATION Wednesday, April 13, 2011 Hollenback Fire Station.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
WRAC Acme Basin B Discharge Project February 2, 2006.
Metropolitan Council Environmental Services Proposed Capital Program and the 2010 Capital Budget Presented to The Environment Committee August.
Wisler Pierre-Louis, P.E., LEED AP BD+C, CFM, PMP Public Works Director Public Works Department.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Hernando County’s Utilities Infrastructure Opportunity through the American Recovery and Reinvestment Act of 2009 (the Federal Stimulus Package)
Broomfield Comprehensive Plan 2016 Update Utility Work Group Report Utility Work Group: − Bob Pearson, Coordinator − Beth Willman, Recorder − Hal Lunka.
Strategic Plan for Public Works Services and Operations.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
Public Works Capital Projects FY Projects Completed FY 2014.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
EASTERN MUNICIPAL WATER DISTRICT Two-Year Agreements for As-Needed Environmental Services 1 Jayne Joy, P.E. Director of Environmental and.
Highest Priority Projects from “Immediate Action” Category Immediate Action All Others.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
ACEC Presentation September 22, 2016
JEA’s Initiatives and Capital Improvements Program
Public Works/Municipal Utilities Department
Environmental Services
RURAL POTABLE WATER INFRASTRUCTURE WATERLINE AND TRUCKFILLS
City of Johnston East of Merle Hay Road Infrastructure Improvements
Manchester’s CSO Program: A Look Behind and a Look Ahead
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
2015 Project Preview NUCA of Colorado
ACEC Presentation September 22, 2016
Elizabeth City Council
Capital Improvement Program (CIP) Overview
Parkland/Brookdale Interceptor Replacement
2018 Construction Projects $98 M
Revision to Capital Improvement Project “Implement Master Plan – Hahamongna Watershed Park – Habitat Restoration” Project Description September 24, 2018.
Facilities Plan Update
City of Sunrise Wastewater Reuse Program
Presentation transcript:

Gene Allen, Proj. Mgr. Bee Ridge WRF Septage Replacement, Carlton WTP-FPL Parallel Agreement, Fruitville Wrf Master P.S. Bypass, McIntosh WM & FM Loop Replacement, Santo Lift Station Decommissioning, Taylor Ranch School WM Looping, Utility Repair/Rehab, Vacuum P.S. Vibration Analysis, Warm Mineral Springs Sewer Imp, CIP TBD Jaimol Charles, PE, Proj. Mgr. Bee Ridge Sewer, Bee Ridge Water, Potable Water Looping, Septic System Replace. Prog., Area ‘D’, Ph 3,4, Snook Haven Park Utility Imp, CIP TBD Unit Price Spec Development, Seton Katz, PE, Proj. Mgr. Cattlemen Road WM Interconnect, Dona Bay Water Treatability Study, Fiber Connection to Carlton Water Plant, Mission Control Upgrades Phases 1 & 2, SCADA System Master Plan, Glenn Richter, PE, Proj. Mgr. Bee Ridge WRF Expansion to 12 mgd, Carlton WTF Capacity Upgrade, CCWRF Phase 3 Expansion to 6 mgd, Fruitville WRF Improvements, North County ASR, Reuse, North County Deep Inject Well, Siesta Key Master PS+FM, Venice Gardens WRF Expansion to 3 mgd, Jan 2014 revision Adnan Javed, PE, Proj. Mgr. 10 th St Boat Basin STW Assessment, Alfred Park Rehab, Bliss Road Rehab, Gottfried Crk STW Assessment, Gulf Gate Area 1 Rehab, 75863A1 Gulf Gate Area 2 Rehab, 75863A2 Honore Ave Pipe Rehab, US41 Canal, Peter Peduzzi, PE, Proj. Mgr. Bermuda Brook Weir Rehab, Briarwood Pond Diffusers/Electrical D/C, 75502BPD Briarwood Irrigation Well D/C, 75502BIW Briarwood Pond Plantings D/C, 75502BPP Celery Fields WQ Monitoring, Downtown COS STW Assessment, Kensington Park STW Assessment, N of Whitaker Bayou STW Assessment, Paver Park Est STW Assessment, Ziegler & Walker Site FDEP Monitoring, 75829, D/C Curtis Smith, PG, Proj. Mgr. Greenwich STW Assessment, Pinecraft Area Rehab, Saralake Est STW Assessment, South Gate East STW Assessment, South Siesta Key Beach Restoration Ph 2, Spoil Island Restoration Rebid, Scott Lyday, PE, Proj. Mgr. North County ASR Reuse, PCSSRP Area I, PCSSRP Area M, PCSSRP Area O, PCSSRP Area P, Siesta Key Large Meter Replacement, Waterline Extension Area ‘I’, Waterline Extension Area O, Waterline Extension Area M, Legend: indicates changes to this report indicates project on hold Jack Gibson, Proj. Mgr. Bee Ridge Landfill Gradient Control System & Pump Station Reconditioning, Bee Ridge Road Extension Utilities, CCWRF DIW, Lift Station Rehabilitation 2012, Lockwood Ridge FM, Oak Ford Pump Station & Force Main, Venice Gardens WRF Expansion, John Saputo, Proj. Mgr. Bee Ridge Forcemain Replacement, Meadowood, Atlantic, Plantation WRF & Plantation WTP Demo, North Jetty Beach Park Restrooms, Septic System Replace Program Area N2, Siesta Key Large Water Meter Replacement, Snook Haven Park Utility Imp, Brenda Bair, PE Environmental Design Gregory Rouse, PE Utilities Design Carlyn O’Reilly, PE, Proj. Mgr. John Chapman, Utilities/Environmental Construction Inspections Helen Bristol, Inspector Betty Thomas, Team Lead Inspection Jeff Luetjen, Inspector Bee Ridge FM Replacement, Lockwood Ridge FM Interconnect, Oak Ford Pump Station & Force Main, Darren Stubbs, Inspector Vacant FTE Venice Gardens TWP Water Sys Imp, Chad Hinkley, Survey Party Chief Fred Moser, Survey Assistant Field Support Butch Lanaville, Proj. Mgr. Central County Basin SS Rehab, Colonial Gables Improvements, Gulf Gate Basin SS Rehab, Infiltration Inflow Reduction Phase 2, Manhole & Stwtr Structure Rehab UPC, 75832, San Pipeline Infrastructure Rehab UPC, Stwtr Pipeline Infrastructure Rehab UPC, Paul Semenec, Proj. Mgr. Bay Island Park Seawall, Celery Mound Phase 3, & Palmer Blvd Street Tree Project, Hudson Bayou WQI, Lyons Bay Sunaire ESTIL, Red Bug Slough Restoration, South Creek Bayou #1, 75307