1 Evaluating the Estimate at Completion (EAC) August 2013 NAVY CEVM.

Slides:



Advertisements
Similar presentations
COST CONTROL - EARNED VALUE 1.0. EARNED VALUE - INTRODUCTION
Advertisements

Connoizor Enabling Performance for Businesses through Software Website: Contact:
Connoizor Enabling Performance for Businesses through Software Website: Contact:
1 Price vs. Usage Variance Analysis August 2013 NAVY CEVM.
Presenter: Sohel Akhter, PMP, CCNA,ISMS
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
1 Earned Value Management a tool for project Portfolio management Jim Strong DLMP PMO Director.
Replanning, Reprogramming, and Single Point Adjustments July NAVY CEVM
N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M30 - Version 9.01 SMU CSE 7315 Planning and Managing a Software Project.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
1 Estimating Costs At Completion Review this tutorial and the Project Pyramid Exercise until you are fully comfortable with how to calculate an estimate.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Chapter 10: Monitoring and Controlling Change
Degree and Graduation Seminar Cost Management
Monitoring and Controlling
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Chapter 10 Project Monitoring and Control
Project Management 6e..
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Chapter 13: Progress and Performance Measurement and Evaluation
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Project Cost Management
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
Mohawk Vehicle - MOH-2 - F C EVM Quick-Look Report.
1 Cost Health Checks Aug 2013 NAVY CEVM 2 Outline BCWP with no ACWP ACWP with no BAC Credibility of the Most Likely EAC Timely detail planning MR health.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Learning PMP Formulas the Easy Way
CSE SW Project Management / Module 30 - Managing with Earned Value / Measurement Issues Copyright © , Dennis J. Frailey, All Rights Reserved.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Schedule Control (Earned Value)
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Earned Value Management EVM. 03/06/2013 Earned Value Management Planned Value (PV): –Budget of the planned work.
EAC Evaluation Methods: Do They Work On Post-A12 Contracts?
Performance Measurement Baseline Contract Price (Project Price)
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
Project Monitoring
“PMP® Exam Prep” Earned Value Management
TOPIC-8B- PROJECT COST CONTROL
CHAPTER:7 Project Cost Management
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
Project Communication, Tracking, and Reporting
Performance Measurement Baseline Contract Price (Project Price)
5. Cost resources & PLAN DURATION
EVM 202—Lesson 7 Tools Analysis Case Study
Contract Performance Charts
EVM 202—Lesson 7 Tools Analysis Case Study
An Introduction to Earned Value Performance Measurement
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
5. Cost resources & PLAN DURATION
Cost Health Checks NAVY CEVM
Schedule and Cost Variance Problem
Replanning, Reprogramming, and Single Point Adjustments July NAVY CEVM
Cost Health Checks NAVY CEVM
Monitoring and Controlling
Evaluating the Estimate at Completion (EAC)
Presentation transcript:

1 Evaluating the Estimate at Completion (EAC) August 2013 NAVY CEVM

2 Outline IEAC Formula IEAC Performance Index selection IEAC Comparison to EAC TCPI Formula Evaluating the TCPI against CPI

3 Can you trust the contractor EAC? The contractor has just reported a new EAC, but how do you know if the estimate is any good? Requires objective, formulaic approaches Two standard ways of evaluating EAC reasonableness –Independent Estimate at Completion (IEAC) comparison –TCPI to CPI comparison These methods tend to be most reliable when the contract is between 15% and 85% complete.

4 Independent Estimate at Completion This is the likely final cost of the contract… …given this is the incurred cost to date… …given this is the budgeted effort that remains to be completed… …if this is the index chosen to represent average cost efficiency for future effort

5 What Performance Index Makes Sense? What incurred cost performance data is the most relevant for projecting future cost? Performance Index Consider it when… CPI cum Cumulative cost performance has been relatively stable ITD without significant schedule delays or advancement, so it reasonably represents future cost performance CPI cum *SPI cum Cost performance has been stable ITD, but past schedule performance may have bearing on the degradation or improvement of future cost efficiency CPI 3month Performance incurred over the past three months is likely to continue CPI 6month Performance incurred over the past six months is likely to continue CPI current Current month cost performance is expected to continue for the remainder of the contract Other *You have a strong reason and/or evidence to support an alternate anticipated future cost efficiency of your choosing * the more objective the index, the more credibility the EAC will have Decide which is most pertinent, but evaluate all of them!

6 IEAC Results Determine if the contractor EAC falls within the range of predicted IEAC results and its relationship to what you believe is the most pertinent IEAC A Chart plotting EAC/IEAC trends may provide additional insight IEACs are not to be used as formal EAC estimates!

7 To Complete Performance Index This is the level of cost efficiency required in the future… …given this is the cost incurred to date… …given this is the budgeted effort that remains to be completed… …if this is final target cost TCPI BAC → the cost target is the BAC, so it calculates the cost efficiency necessary to complete on budget TCPI EAC → the cost target is the EAC, so it calculates the cost efficiency necessary to achieve the current estimate TCPI BAC → the cost target is the BAC, so it calculates the cost efficiency necessary to complete on budget TCPI EAC → the cost target is the EAC, so it calculates the cost efficiency necessary to achieve the current estimate

8 What is a good TCPI? A good TCPI is one that’s achievable –Predicts a level of future cost efficiency which seems reasonable based upon incurred cost efficiency to date TCPI is evaluated by how much it differs from CPI –Generally speaking, the higher CPI the better. By contrast, the lower the TCPI, the more likely it is that the EAC can be achieved –Some amount of variation is expected based upon performance challenges or conservatism, but TCPI should neither be too far above nor too far below performance incurred to date An EAC is considered unlikely if TCPI and CPI that differ by 0.10 or more –Lends credibility to the overall EAC position. CPI CUM TCPI EAC DeltaProspect Unlikely (optimistic) Unlikely (pessimistic) Likely Likely

9 Point of Contact Navy Center for Earned Value Management (703)