A. Vascotto - 15 December 2003ALICE Technical Board1 ECS TDR highlights Activities Milestones Core team: Franco Carena Jean-Claude Marin Sandro Vascotto.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
1P. Vande Vyvre - CERN/PH ALICE DAQ Technical Design Report DAQ TDR Task Force Tome ANTICICFranco CARENA Wisla CARENA Ozgur COBANOGLU Ervin DENESRoberto.
Test Systems Software / FEE Controls Peter Chochula.
Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Naming and Code Conventions for ALICE DCS (1st thoughts)
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
F.Carena, CERN/ALICE The ALICE Experiment Control System F. Carena / CERN-PH.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
The Control and Hardware Monitoring System of the CMS Level-1 Trigger Ildefons Magrans, Computing and Software for Experiments I IEEE Nuclear Science Symposium,
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
(Alice COsmic Ray Detector) Status Report
Online clock software status
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
SPD DCS Overview & FED Server
Peter Chochula Calibration Workshop, February 23, 2005
TPC Commissioning: DAQ, ECS aspects
Controlling a large CPU farm using industrial tools
IEEE NPSS Real Time Conference 2009
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
The LHCb Run Control System
Offline framework for conditions data
Presentation transcript:

A. Vascotto - 15 December 2003ALICE Technical Board1 ECS TDR highlights Activities Milestones Core team: Franco Carena Jean-Claude Marin Sandro Vascotto

A. Vascotto - 15 December 2003ALICE Technical Board2 Field of application of the ECS is the two-dimensional control space of the experiment. Activity domains: fields of activity requiring an automatic control. Examples: trigger, DAQ, HLT and detector infrastructure (power supplies, fluids, cooling). Each controlled by an online system. View of the system designer. Detectors: operational units, either isolated or joint in partitions. View of the detector designer and the operator TDR highlights

A. Vascotto - 15 December 2003ALICE Technical Board3 TDR highlights (2) ECS scope: –Creation of the partition environment, where online systems run independently. –Coordination of the online systems within a partition. ECS policy: Minimal impact on the online systems. Independent development, independent operation. Conventional object-oriented interface/communication, based on SMI++.

A. Vascotto - 15 December 2003ALICE Technical Board4 ECS Architecture ECA Database Partition 1 Trigger DAQ PCA DCS Partition 2 PCA Detector ADetector B Trigger DAQ DCS Detector CDetector D HLT

A. Vascotto - 15 December 2003ALICE Technical Board5 Activities in 2003 TPC – Discussion on requirements on operating modes. DCS –Discussion on architecture of FERO calibration systems. Trigger HMPID

A. Vascotto - 15 December 2003ALICE Technical Board6 Trigger Frequent meetings and discussions. Agreement on control interface. Collaboration on control-architecture definition. Work progressing well. People involved: Anton Jusko Roman Lietava Orlando Villalobos Baillie

A. Vascotto - 15 December 2003ALICE Technical Board7 HMPID ECS prototype driving DCS, DAQ and Trigger, used at the test beam. DCS: control of HV and LV, implemented on Windows. The ECS uses the native access control of the DCS. Trigger implemented on VME, controlled by the ECS. DAQ: DATE upgraded to fulfil the ECS interface. –Implementation of compatible access control. –Decoupling the HI from run control. –Implementation of SMI objects representing the run control. FERO calibration performed by the ECS through the DDL, as a sequence of commands to trigger and DAQ, depending on the state of trigger, DAQ and DCS. People involved: Giacinto de CataldoPaolo Martinengo Ervin DénesCsaba Soos Antonio Franco

A. Vascotto - 15 December 2003ALICE Technical Board8 PCA HMPID Used during the October-November 2003 beam tests.

A. Vascotto - 15 December 2003ALICE Technical Board9 Next steps Continue development. –Trigger –Partitions –Database Test in the lab a prototype for the TPC, in collaboration with the DCS and TPC groups. Prototype ready for the test & commissioning of the TPC at Point 2 (end 2004). Development of the prototype for the ITS, joint tests in the lab of SPD, SDD and SSD.