McKeown Group OpenFlow v1.0 Weekly Status Report Week4/2011 (01/26 Wed—02/01 Tue) 1.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2003 Chapter 11 Ethernet Evolution: Fast and Gigabit Ethernet.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
McKeown Group OpenFlow v1.0 Weekly Status Report Week5/2011 (02/02 Wed—02/08 Tue) 1.
McKeown Group OpenFlow v1.0 Weekly Status Report Week6/2011 (02/09 Tue—02/15 Tue) 1.
McKeown Group OpenFlow v1.0 Weekly Status Report Week2/2011 (01/12 Wed—01/18 Tue) 1.
McKeown Group OpenFlow v1.0 Weekly Status Report Week1/2011 (01/05 Wed—01/11 Tue) 1.
McKeown Group OpenFlow v1.0 Weekly Status Report Week8/2011 (02/23 Wed —03/01 Tue) 1.
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
McKeown Group OpenFlow v1.0 Weekly Status Report Week9/2011 (03/02 Wed —03/08 Tue) 1.
McKeown Group OpenFlow v1.0 Weekly Status Report Week11/2011 (03/16 Wed —03/22 Tue) 1.
McKeown Group OpenFlow v1.0 Weekly Status Report
Presentation transcript:

McKeown Group OpenFlow v1.0 Weekly Status Report Week4/2011 (01/26 Wed—02/01 Tue) 1

Status Update WIRED NETWORK hpsw3 was removed for preparing to test BigSwitch controller (last Thur) DEMO NETWORK All demos working 2

Status Update WIRELESS Necsw3 was removed for testing NEC controller (Helios) Still spiky flow setup time – Two cases (see slides 5-9) SNAC: Slow down and flow setup time goes up to seconds. Lasts few minutes. Switch: Occur randomly (does not last). Add few 100ms of seconds. – Switching to product firmware doesn’t change the figure. 3

Performance Summary WIRED NETWORK Abnormal flow arrival rate for HPSW3 – Still debugging WIRELESS NETWORK Spiky flow setup time – Still debugging

Flow Setup Time breakdown (Wireless VLAN) 5 Spikes due to Switch Spikes due to SNAC

Flow Setup Time breakdown (Wireless VLAN) (cont’d) 6

Flow Setup Time breakdown (Wireless VLAN) 7 Prolonged slowdown (SNAC)

Flow Setup Time breakdown (Wireless VLAN) 8

9

Performance (WIRED) 10

Network Configuration hpsw3 netfpga1 indigo1 Masa Paul Srini/Tatsuya/Rob Dan Adam Payman Brandon/David E/Glen Lots of power meters We’ll use this color code for the switch 11 Controller (at openflow5.stanford.edu) SNAC (v1.0 wire compat) necsw6 Non-OF uplink Removed ~10am Jan 27 (last Thr)

Measured metrics (no change) Switch Statistics – Active flows – Flow injection rate – CPU usage – Traffic volume Network Performance – Flow setup delay – E2E RTT – E2E packet loss rate – wget delay 12

Flow Statistics per switch SwitchAvg # FlowsAvg Flow Setup Rate [flow/sec] necsw indigo netfpga nonof

Flow statistics (# of active flows) 14

Flow statistics (flow injection rate) 15

CPU usage 16

Total Traffic Volume per switch 17 Not available for indigo1 nor netfpga1

Network Performance Flow setup delay E2E RTT wget delay 18

Flow Setup Delay 19

Flow Setup Delay switch10ms100ms1000ms necsw Indigo netfpga Nonof NA Percentage of time flow setup delay is less than the target value 20

RTT E2E RTT from each switch 21

RTT switch1ms10ms100ms necsw indigo netfpga nonof Percentage of RTT is less than the target value 22

wget delay 23

Performance (WIRELESS) 24

Network Configuration (added necsw3) necsw1 We’ll use this color code for the switch Controller (at openflow1.stanford.edu) SNAC (v1.0 wire compat) FlowVisor (currently removed due to slow flow setup time) necsw4 Non-OF uplink ap17 ap18 ap15 ap16 ap2 24 tunneling APs necsw3 Removed ~10am Jan 31 (last Monday)

Measured metrics (no change) Switch Statistics – Active flows – Flow injection rate – CPU usage – Traffic volume Network Performance – Flow setup delay – E2E RTT – E2E packet loss rate – wget delay 26

Flow Statistics per switch SwitchAvg # FlowsAvg Flow Setup Rate [flow/sec] necsw necsw necsw

Flow statistics (# of active flows) 28 Note: necsw3 was moved to test network on Jan 31

Flow statistics (flow injection rate) 29

Switch CPU usage 30 Note: necsw3 was moved to test network on Jan 31

Total Traffic Volume per switch 31

Network Performance Flow setup delay E2E RTT wget delay 32

Flow Setup Delay 33

Flow Setup Delay switch10ms100ms1000ms necsw necsw necsw Percentage of time flow setup delay is less than the target value 34

RTT E2E RTT from each switch 35

RTT switch1ms10ms100ms necsw necsw necsw Percentage of RTT is less than the target value 36

wget delay 37