“ If Logisticians Can Cook” Logistics Assist Visit Concepts

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

The Fall Messier Marathon Guide
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Job Order Costing Chapter 4.
Addition and Subtraction Equations
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
Solving the Faculty Shortage in Allied Health 9 th Congress of Health Professions Educators 4 June 2002 Ronald H. Winters, Ph.D. Dean College of Health.
1 When you see… Find the zeros You think…. 2 To find the zeros...
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Behavioral Health DATA BOOK A quarterly reference to community mental health and substance abuse services Fiscal Year 2011 Quarter 4 October 10, 2011.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
Auto-Moto Financial Services- The Old Process
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
Factoring Quadratics — ax² + bx + c Topic
Board Self-Assessment: May 2013 Benchmark Report NCMA Governance Committee Penny White, Chair.
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
© 2010 Concept Systems, Inc.1 Concept Mapping Methodology: An Example.
MM4A6c: Apply the law of sines and the law of cosines.
MCQ Chapter 07.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
7/16/08 1 New Mexico’s Indicator-based Information System for Public Health Data (NM-IBIS) Community Health Assessment Training July 16, 2008.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Biostatistics course Part 14 Analysis of binary paired data
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
School Health Profiles (Profiles) 2010 State Results National Center for Chronic Disease Prevention and Health Promotion Division of Adolescent and School.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
LAV Process Explained: Equipment Maintenance Medical Equipment and Logistics Solutions Directorate Naval Medical Logistics Command.
LAV Process Explained: Equipment Management Elizabeth Erdman Medical Equipment and Logistics Solutions Directorate Naval Medical Logistics Command.
Presentation transcript:

“ If Logisticians Can Cook” Logistics Assist Visit Concepts Edlouie S. Ortega, MSM, CDFM, CPFM Equipment and Technology Management Medical Equipment and Logistics Solutions Naval Medical Logistics Command

How do you measure success? Do you believe in key performance indicators (KPI)? How do you know which KPI to track? Should all KPI measureable?

Who do you agree with? “Tell me how you measure me, and I'll tell you how I will behave.” - Eli Goldratt " Tell me how you’ll measure me, and I’ll tell what damn fool things I’ll do to make the measurement look good." - Tony Rizzo

Restaurant Industry…What we measure Cash flow. Restaurants are very cash-intensive, forking over money for fresh inventory and tipping out servers and other staff on a daily basis. Percentage of repeat customers. The National Restaurant Association estimates that three-quarters of most restaurants' sales come from repeat customers. Staff turnover. On average, management turnover rates run around 20% annually for table-service restaurants, while hourly workers turn over at roughly a 150% clip Forbes.com

Other KPIs we measure Table-turn over rate. How many times table is filled with customer. How fast tables empty and fill during a shift. Order-throughput time. How long before a meal goes out to the customer. Drinks – appetizer – main course – dessert. Table-turn time. How long did the table remain empty and how long did it stayed filled.

Restaurants Does Logistics Too and More… Contracts Outlays Budget Regulations Overall Strategy Competition Staff Development Procure materials Move materials Produce materials Monitor Assess Control

What we can learn from a Cook It’s all about the… food presentation timing customer service dish washer work flow And sometimes it’s not all about measurable KPI…

What we can learn from a Cook Front of the House – Back of the House - Expedite!!! Assurance: The act of giving confidence, the state of being certain or the act of making certain. Control: An evaluation to indicate needed corrective responses; the act of guiding a process in which variability is attributable to a constant system of chance causes.

What we can learn from a Cook Quality Assurance: The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled. Quality Control: The observation techniques and activities used to fulfill requirements for quality. Standard processes/quality products… not to make measurements look good.

What we can learn from a Cook Outputs Defined as the goods or services produced (e.g., patient admissions, bed days, work orders, receipts). Outcomes Defined as the impacts on indicators arising from the delivery of outputs (e.g., fill rate, turn-over ratio, SOS Due-in rate, maintenance completions rate, unable to locate). “More focused on Effectiveness than Efficiency”

Define Logistics Logistics Medical Logistics The planning, implementation, and coordination of the details of a business or other material operations. Medical Logistics Is the logistic of pharmaceuticals, medical and surgical supplies, medical devices and equipment, and other products needed to support doctors, nurses, and other health and dental care providers. Because its final customers are responsible for the lives and health of their patients, medical logistics is unique in that it seeks to optimize effectiveness rather than efficiency.

Logistics Assist Visit Purpose: Assist Logisticians to achieve Total Asset Management (TAM) and improve internal management control of accountable equipment. Evaluate the effectiveness of the Equipment, Technology Material Management (ETM) processes from materiel procurement planning to eventual property disposal Evaluate the effectiveness of the Purchasing Management, Acquisition Planning and Requirements Development, and Contracting Officer’s Representative (COR) Programs The Logistics Assist Visit is NOT an inspection, this is strictly an assist visit to help your staff identify strengths and weaknesses and to provide them with the tools that they need to successfully carry out their mission.

Logistics Assist Visit Focus: Assessment of continued suitability as it applies to aging technology. Assessment of effective use of the logistics information system as a tool for improving materials management operations. Collect information to develop technical criteria for use as basis for acquisition actions across BSO-18. Assessment of accountable equipment records with an acquisition cost of $25,000 and greater. Assessment of Material Management Assessment of Acquisition Management

Logistics Assist Visit Assessment Methodology Use of existing data and focus on establishing the baseline between the site and the "Best Practices" in BSO-18 claimancy and in the industry. Incorporate training, database management, material management, technology management and acquisition management site visits. Provide feedback to the site regarding LAV findings and recommendations that will help the site focus on its strengths and immediate improvement.

Logistics Assist Visit Assessment Elements 1. Evaluate synchronization of the Navy business practices, policies, and logistics and acquisition information systems. 2. Validation Processes (Management Assertion) 3. Evaluate training requirements and provide just-in-time training as needed.

Logistics Assist Visit Assessment Elements Evaluate synchronization of business practices, policies and systems. Review current policies. Analyze data; focus on trends. Evaluate site’s business practice. Evaluate site’s appropriate use of business systems. Identify processes requiring BUMED-wide standardization. Identify change requirements to the logistics information systems. Identify change requirements to the policies.

Logistics Assist Visit Assessment Elements 2. Validation Process (Management Assertion): Valuation. Test all contributing factors (device code, life expectancy, useful life, acceptance date, acquisition cost, etc). Completeness. Test to ensure that maintenance significant equipment and personal properties are entered in DMLSS. Accountability. Test if the equipment found on site belongs to the entity. Replacement Plan. Test for proper equipment selection and requisition process. Due-in Receipt. Test to ensure that due-in materials are properly receipted and properly recorded.

Logistics Assist Visit Assessment Elements 3. Evaluate training requirements and provide just-in-time training as needed. Identify functionality gaps. Identify execution gaps. Identify process gaps. Identify current workload and productivity. Identify additional training requirements.

Assessment Candidates Equipment Receipt Inventory Management/UID Five Year Equipment Replacement Plan Device Code Assignment Property/Item Decrease/Loss Document Control Maintenance Plan and Procedures Repair Parts Request and Issue Service Contracts Material Due-ins Emergency Management Plan/CBRNE/IPP COR Appointment, Training and Management ECAT Orders

Performance Metrics Analysis SWO Workload/Metrics June 2010 (Before LAV) July 2010 August 2010 YTD as of JUNE 2010 Mean Beginning Work Order Balance Qty 34 90 29 1477 123 New Work Order Qty 403 372 522 4974 414 Reopened WO Qty 12 25 2 Completed Work Order Qty 321 363 405 4317 360 Cancelled Work Order Qty 38 70 122 812 68 Ending Work Order Balance Qty 24 1347 112 Carryover 56 -61 5 -130 -11 Completion Rate 79.96% 93.72% 95.6% 79.20% Relative Inventory Accuracy 90.57% 81.18% 70% 83.68%

Imaging Equipment Portfolio Total Items: 729 Total Acq Cost: $114M Total Items: 550 Total Acq Cost: $96M Total Items: 181 Total Acq Cost: $42M Total Items: 124 Total Acq Cost: $15M

Potential Throughput₄ Capacity Utility Rate Modality Qty₁ Total Procedures₂ Actual Throughput₃ Potential Throughput₄ Procedures /Day₅ CUR₆ Bone Densitometer 1 3  - - Radiographic System, Mammography 2 4,916 2,458 4,000 20 61.4% Radiographic System, Mobile 2,376 792 -  9 Radiographic System, Urologic 236 79 2,000 3.9% Radiographic Unit 26,154 8,718 15,000 104 58.1% Radiographic/Fluoroscopic 1,357 452 1,200 5 37.7% Radiographic/Fluoroscopic, Mobile, C-Arm 115 58 Scanning System, Computed Tomography 7,330 8,000 29 91.6% Scanning System, Gamma Camera, (SPECT) 730 365 18.2% Scanning System, Magnetic Resonance Imaging 3,341 13 83.5% Scanning System, Ultrasound 4 9,577 2,394 38

Projected Cost Avoidance Modality Section FY 11 FY 12 FY 13 3YR Total Radiographic/Fluoroscopic System 4.2.3. $700 $0 RF Service Contract Cost $42 $126 Radiographic Unit 4.2.4. $240 RU Service Contract Cost $6 $14 $34 Radiographic/Fluoroscopic System, Urologic 4.3.5. $210 RFU Service Contract Cost $13 $38 Imaging System, Computed Radiography 4.3.7. $160 $80 Total PCA   $1,371 $149 $69 $1,508 In Thousands

Region UIC Unit Name BWO NWO RWO CWO XWO EWO Risk 1 UTL Risk 2-4 UTL UTL % PMCR NME N32185 NHC New England 196 191 5 2.55% 100.00% N39163 USNH Sigonella 1 127 3 4 3.15% NMW N68095 NH Bremerton 2 240 234 9 3.75% N66094 NHC Cherry Point 26 20 6 23.08% N00232 NH Jacksonville 109 731 847 0.14% 99.88% N68084 NHC Charleston 35 114 143 3.51% 98.66% N66097 NH Oak Harbor 95 88 8 8.42% 97.96% N00211 NHC Great Lakes 153 145 7 4.58% 97.44% N68292 USNH Yokosuka 16 304 294 21 6.91% 97.22% N66095 NH Lemoore 128 11 8.59% 96.90% N66096 USNH Naples 110 0.00% 96.49% N00183 NMC Portsmouth 63 1064 995 87 47 8.27% 95.84% N68093 NH Camp Lejeune 18 341 321 24 15 7.04% 95.83% NCA N00168 Walter Reed NMMC 188 1542 45 951 685 139 44 47.28% 92.17% N68096 USNH Guam 33 152 169 0.66% 91.40% N00285 NHC Corpus Christi 90.91% N00259 NMC San Diego 85 1109 49 1001 103 9.56% 88.82% N66101 USNH Rota 22 55 62 10.91% 88.31% N68470 USNH Okinawa 65 355 315 13.24% 85.27% N00203 NH Pensacola 48 300 245 50 16.67% 84.29% N61337 NH Beaufort 317 257 14 51 4.42% 84.16% N68098 NHC Hawaii 70 100 39 31 39.00% 81.76% N68094 NH Camp Pendleton 278 362 504 123 12 7.18% 80.81% N35949 NH Twentynine Palms 172 27 15.70% 70.52% N00162 NHC Annapolis 198 VALIDATE N00231 NHC Quantico 38 N66098 NHC PAX River   TOTAL BUMED-WIDE 1278 8118 7349 1408 766 18.12% 91.96%

Navy Medicine Support Command M42 Logistics Policy Chief, MedLog M46 Logistics Execution -Lead Contracting Executive -Fleet Hospital Program Office (PML-500) -Property Management Office -Medical Logistics Business Systems/Metrics -FOA Vaccine Management CO, NAVMEDLOGCOM Execute Current Mission NEMSCOM NOSTRA Echelon 2 Dual Hatted Position Echelon 3 Navy Medicine Support Command Support Functions MOU Echelon 4

Related Sessions LO-T-3-B Equipment Management Self Assessment - Conduct Your Own LAV LO-T-3-C Material Management Self Assessment - Conduct Your Own LAV LO-T-3-D Maintenance Management Self Assessment - Conduct Your Own LAV LO-W-3-C Automatic Identification Technologies (AIT) /IUID and RTLS LO-W-3-D Equipment Management Process LO-W-3-E Annual Inventory Process and Requirements