Risk Management an Element of Loss Control

Slides:



Advertisements
Similar presentations
1 OBJECTIVES: TO HAVE A CLEAR IDEA ON HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL * TO UNDERSTAND THE METHODOLOGY TO PERFORM GROUP RISK ASSESSMENT.
Advertisements

Job Hazard Analysis I. Speaker’s Notes:
Museum Presentation Intermuseum Conservation Association.
Risk Management Introduction Risk Management Fundamentals
Operational Risk Management (ORM)
Occupational Health and Safety Workplace Inspection Training HS7_
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
TMS-RA04-A-01-02Page 1 of 20 The Risk Assessment Process.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Accident Prevention Programs What Will We Talk About? What is an accident? What is an accident prevention program? Basic elements of a program Where.
Accident Causes, Prevention and Control
© 2000 International Risk Control America, Inc. Risk Management Presentation — 1 International Risk Control America IRCA
Safety and Health Programs
Operational Risk Management for Airport Emergency Planning
Risk Management. RISK RISK = the probability and severity of loss linked to hazards. RISK = the probability and severity of loss linked to hazards. The.
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
Safety and Health Programs
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
PHILOSOPHY OF ACCIDENT PREVENTION
JOB HAZARD ANALYSIS Example Guide.
Worksite Hazard Analysis
SAFETY AND HEALTH PROGRAMS 1. This presentation is adapted from the OSHA Safety and Health Programs presentation available on the OSHA website. CREDITS.
Incident Reporting Procedure
/0203 Copyright ©2002 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Safety and Health Program.
Hazard Identification
The Importance of Risk Assessment Simon Rice Senior Safety Coordinator MRC Laboratory of Molecular Biology.
Risk Analysis for Engineering Design J. M. McCarthy Fall 2003 Definitions Hazard Analysis Hazard Analysis Report Example for Mini Baja Nationally Recognized.
Unit #4 Establishing Committee Expectations – Safety & Health Programs 1.
ELEMENTS OF EFFECTIVE SAFETY AND HEALTH PROGRAMS IN ACADEMIC AND REGIONAL THEATERS Health & Safety 260 Bill Reynolds Scott Hansen Greg Petruska.
Noise and Hearing Conservation
Safety and Health Programs 1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale and productivity.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
TOOL BOX TALKS OHS Risk Management. Definitions Hazard – anything with the potential to cause harm to a person or damage to property Risk – the actual.
Worker Focused Safety Program Violence in the Workplace Worker Training Module 5.
OSHA Office of Training and Education1 Safety and Health Programs.
Chapter 20 A Safe and Healthy Environment. Lecture Overview Employee Safety Principles of Safety Program Implementation of Safety Program Health Work.
Periodic Review of JHA Reviewing job hazard analysis ensures that it remains current and continues to prevent accidents and injuries. It is possible that.
Division of Risk Management State of Florida Loss Prevention Program.
Division of Risk Management State of Florida Loss Prevention Program.
Occurrence Reports. An occurrence report is a document used to record an event when it occurs Occurrences are reported each time an occurrence occurs.
Health Emergency Risk Management Pir Mohammad Paya MD, MPH,DCBHD Senior Technical Specialist Public Health in Emergencies Asian Disaster Preparedness Center.
Job Safety Analysis.
National Corporate Training Pty Ltd0. Topics Follow safe work practices Maintain personal safety standards Assess risks Follow emergency procedures National.
Incident Investigation New Mexico State Risk Management Loss Control Bureau and Law Offices of the Public Defender Loss Control Committee.
Safety and Health Program Don Ebert- Risk Manager (509)
A Health and safety law training programme for employers This programme has been set up to guide employers on some of the basic H&S legislation in the.
OHS RISK ASSESSMENT PROCEDURE Title: OHS Risk Assessment Procedure Document Unique Identifier: (Revision 2) Effective date: July 2014.
Work Place Committees and Health and Safety Representatives Training Module 5 – INPECTIONS, WORK PLACE HAZARDS, TASK HAZARD ANALYSIS.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
TOOL BOX TALKS WHS Risk Management. Definitions Hazard – anything with the potential to cause harm to a person or damage to property Risk – the actual.
Train When it Rains: Risk Assessment. What is Risk Assessment? Risk assessment is the process of recognizing possible harm from exposures which could.
Campus Wide Safety Committee Initial Meeting 11/9/16
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
Ranjan kumar Assistant Manager CCL,Ranchi
Risk Assessment.
Ensuring a safe workplace
Hazard Identification and Control
Hazard Identification and Control
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
Risk management - HIRAC awareness presentation
Air Carrier Continuing Analysis and Surveillance System (CASS)
Incident Investigations
Reporting Incidents and Hazards Accident Prevention
Unit I Module 3 - RCM Terminology and Concepts
RISK ASSESSMENT.
Presentation transcript:

Risk Management an Element of Loss Control A Review of Risk Management Fundamentals Contributed by: Ben Sheppard, CMSP BWS&A – Building Stones, Inc. P.O. Box 90 Cataldo, ID 83810 Phone: 208-682-4774 www.bwsassociates.com A.4

The Fundamentals of Risk Management Recognize that loss potential exists Identify all loss potentials Eliminate or control all potentials to an acceptable level

Assessment and Management of Hazards Hazard Identification Risk Assessment Risk Control Measurement and Record Keeping

Hazard Identification – consists of identifying any condition that has potential to cause a loss to persons, property, production or planet.

Risk Assessment – consists of determining what the actual loss potential may be.

Risk Control – consists of eliminating and/or reducing the risk to an acceptable level

Measurement and Record Keeping – consists of measuring the control and documenting the results.

Hazard/Nonconformance Inspections Record each nonconformance/substandard act and/or practice Categorize each nonconformance * Establish a numerical system for prioritizing each nonconformance

Developing Categories for Establishing Priorities Establish a system of classification that will set a priority for fixing or correcting each nonconformance found during an inspection. * I.E., class 1-2-3-4-etc. or class A-B-C-D-etc. Give each item on the nonconformance list a number or letter that sets a firm action priority.

Priority Actions - Examples Class 1 or A = Emergency – Correct Immediately Class 2 or B = Urgent – Correct within 24 hours Class 3 or C = Correct within one week Class 4 or D = Correct within one Month Etc.

Priority Actions Priorities are based on event consequences and/or probability of occurrence Or another way of saying the same thing Frequency of exposure and severity potential

Priority Actions – Hazard Classifications Class “A” Hazard A condition or practice likely to cause permanent disability, loss of life or body part, and/or extensive loss of structure equipment or material. Example 1 - a large slab of loose hanging wall at a haulage cross cut. Example 2 - unmarked and unplugged misfire in a face being drilled.

Priority Actions – Hazard Classifications Class “B” Hazard A condition or practice likely to cause serious injury of illness (resulting in temporary disability) or property damage that is disruptive, but less severe than Class “A.” Example 1 - Loading operations in a blasted end commencing before watering down. Example 2 - Missing step in the middle of a stepladder.

Priority Actions – Hazard Classifications Class “C” Hazard A condition or practice likely to cause minor (non-disabling) injury or illness or non-disruptive property damage. Example 1 - Worker handling timber without using gloves. Example 2 - Slippery footwall in travel way.

6 Key Subjects for Risk Decisions CLASSIFICATION OF EXPOSURE PROBABILITY OF OCCURRENCE COST OF CONTROL DEGREE OF CONTROL ALTERNATIVES JUSTIFICATION

6 Key Questions of Risk Decisions 1. CLASSIFICATION OF EXPOSURE What is the potential severity of loss if an incident occurs? A - Major B - Serious C - Minor

6 Key Questions of Risk Decisions 2. PROBABILITY OF OCCURRENCE What is the probability that a loss will occur from this exposure of hazard? A - High B - Moderate C - Low

6 Key Questions of Risk Decisions 3. COST OF CONTROL What is the cost of the recommended control? A - High (establish meaningful cost ranges for your own organization) B - Medium C - Low

6 Key Questions of Risk Decisions 4. DEGREE OF CONTROL What degree of control will be achieved by this expenditure? A - Substantial or Complete (67 - 100%) B - Moderate (34 - 66%) C - Low (1 - 33%)

6 Key Questions of Risk Decisions 5. ALTERNATIVES What are the alternative controls? 6. JUSTIFICATION Why is this one suggested?

Identifying Hazards Hazard identification is the most important and critical component of risk assessment. And Hazard analysis is the most important safety process. If these fail – all other processes will most likely be defective.

Identifying Hazards ASK THE QUESTION(S) HOW COULD PERSONS BE INJURED? HOW COULD PROPERTY BE DAMAGED? HOW COULD PRODUCTION BE DELAYED? HOW COULD THE ENVIRONMENT BE HARMED?

A few examples of methods used to identify hazards Identifying Hazards A few examples of methods used to identify hazards Common sense & experience Potential contacts with energy and/or substance Standard reviews Utilize the manufactures recommendations Utilize the operator or process user Utilize similar processes Utilize checklists Analyze incident reports Analyze industry historical information Etc.

Reduce or Eliminate Risk Beginning with the Most Effective Control Measures and Ranking to the Least Effective Control Eliminate or control hazards and risks through System design and redesign. Reduce risk by utilizing materials and methods that reduce the hazard and risk. Utilize barriers (I.e., guards, fences, that prevent contact) Utilize warning systems (I.e., alarms, lights and etc.) Utilize administrative controls (I.e., training, exposure frequency, etc.) Utilize Personal Protective Equipment (PPE)

Risk Assessment Updating Risk assessments should be updated when: A design is changed The process is changed in any way Controls are changed or modified Contiguous processes with potential to affect are modified

Review Questions (Answers on the next slide) In order to eliminate or reduce risk, the use of PPE should be the ______ choice utilized: First Last What is the first step in the assessment and management of risk?. Hazard identification Risk assessment Risk control Cost analysis Which of the following should not be a factor in risk management decisions? Severity Probability Cost of control Degree of control Legal cost of no action

Answers to the Review Questions In order to eliminate or reduce risk, the use of PPE should be the ______ choice utilized: b. Last What is the first step in the assessment and management of risk?. Hazard identification Which of the following should not be a factor in risk management decisions? e. Legal cost of no action

Answers to the Review Questions A Hearing Conservation Program includes all of the following, except: b. Predictive Equipment Maintenance ___ dBA, called the Action Level, are required to be enrolled in a Hearing Conservation Program. a. 85 A Standard Threshold Shift (STS) is a decrease in a miner’s hearing by an average of ___ dB compared to his baseline audiogram. b. 10