II.2 Further harmonisation needed: gas day, nominations… September 23, 2013.

Slides:



Advertisements
Similar presentations
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Advertisements

E-Nomination – Electronic procedure for the nomination of exchange students.
Enagás IT roadmap CAM & CMP 19 July Index CAM IT roadmap CMP IT roadmap.
15 th September 2013 Enagás and TIGF Information to NRAs.
2013 Auction between Spain and Portugal 23 rd IG meeting 19 th June 2013.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1 12 th Implementation Group Meeting 26 th March 2009 Establishing a SAO in the CS Region.
1 Cross-border Investment TRIGGERS GRI NW Investment I1- Virtual Test – Stockholm September 24, 2009 By : Johan Allonsius.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
2nd GTE Conference Copenhagen, September 2004 Author:Milan Sedlacek SPP (Slovak Gas Industry) Slovak Republic GAS TRANSIT THROUGH A NEW EU MEMBER STATE.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
SEAN-CC Regional Training Workshop: Building Capacity on Access to Funds for Climate Change Adaptation Initiatives NIE accreditation process Mozaharul.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
Reduced Cost for Using The most important justification for the companies who resorts to outsourcing is petty expenses for searching. More of that companies.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012.
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
COMMENTS TO THE SOUTH-WEST EUROPE ELECTRICITY REGIONAL ENERGY MARKET Draft detailed action plan version 1, 22 June 2007.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
Gas Transit Workshop Brussels, 24th January 2007 Milan Sedlacek, SPP - preprava, Slovak Republic Gas transit regulation ( Slovakia as a country with standard.
Doug Wood GTE-CEER transit workshop Brussels, 24 January 2007 Doug Wood GTE-CEER transit workshop, 24 Jan 2007 European Federation of.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
20th April 2016 Teleconference
NWE Cross Border Intraday
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
20th April 2016 Teleconference
Transparency from a practical point of view ENTSOG Transparency Workshop Brussels, September 11, 2012.
37th IG Meeting South Gas Regional Initiative
20th April 2016 Teleconference
29th April 2014 Teleconference
Andrej Valjavec, dipl. org. Ljubljanske mlekarne d.d.
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Enagás, GRTgaz, REN and TIGF
Presentation transcript:

II.2 Further harmonisation needed: gas day, nominations… September 23, 2013

The final purpose of the capacity bought by Network Users is to be used (nominated) by them. Therefore, when daily and with-day auctions will be implemented, nomination and renomination processes have to be accordingly adapted. Nevertheless, this adaptation not only means to introduce additional renomination cycles but also harmonisation of gas day period, combustion reference temperature and automatic data exchange. 1. Background To buy capacity To use capacity Renomination cycles Gas day period Combustion reference temperature Automatic data exchange September 23, 2013

2. Gas Day Period September 23, 2013 Historically adjacent countries have established different gas day periods. Therefore, TSOs and Network Users have dealed with this situation during the nomination/renomination and matching process. If additional renomination cycles are implemented, the renomination deadlines are frequently established with reference to the gas day period. Consequently, if the gas day period is different in each border of the IP, then renomination deadlines will be different as well. Gas day period from 5 to 5 UTC First renomination cycle starts with the starting of the gas day First renomination cycle=5 UTC Gas day period from 23 to 23 UTC First renomination cycle starts with the starting of the gas day First renomination cycle=23 UTC According to this example, no matching process can be performed until the first common renomination deadline. Therefore, until 5 UTC, renomination cycles of country B are useless because no nomination in country A has been sent yet. Gas day period harmonisation is neccesary in order to get a successful additional renomination cycles implementation. COUNTRY A COUNTRY B

3. Combustion Reference Temperature Traditionally adjacent countries have established different combustion reference temperatures. Consequently, TSOs and Network Users have dealed with different problems during the nomination and matching process. At each side of the IP, nominations and are sending by network users according to the combustion reference temperature in place. Nevertheless, for matching purposes, TSOs have to agree on one common combustion reference temperature and for this reason conversions factors have to be applied. If additional renomination cycles are implemented the use of conversion factor will be strongly increased. Network User X Nomination=5 (Tref=25ºC) Nomination=5,013 (Tref=0ºC) TSO A TSO B Nomination = 5 (Tref=25ºC) Results of matching = 5 (Tref=25ºC) Network User X Nomination Confirmed=5 (Tref=25ºC) Nomination Confirmed=5,013 (Tref=0ºC) Because both TSOs and Network Users have to manage conversion factors the risk of mismathing is currently high. On the other hand, the use of conversion factors involves rounded processes that cause some errors and claims. It is seemed to be clear that if additional renomination cycles are implemented these kind of problems are going to be increased. Combustion reference temperature harmonisation is neccesary in order to get a successful additional renomination cycles implementation. COUNTRY A COUNTRY B September 23, 2013

4. Automatic Data Exchange Initially nomination and matching information was exchanged between TSOs by . Although this kind of solution was suitable in the past, if additional renomination cycles are implemented it is a must to exchange this information automatically in order to: Avoid mistakes: Excel files could contain transcription mistakes. Comply with deadlines: The data volume to be exchanged each renomination cycle require automatic data exchange solutions Guarantee information security: Whereas s could contain mistakes in senders and recipients, automatic data exchange solution might include security measures to prevent unauthorised information access. September 23, 2013

4. Current Harmonisation Status September 23, 2013

Thank you for your attention!!!