Mod 373 “Governance of NTS Connection Processes”

Slides:



Advertisements
Similar presentations
FDA QS reg/CLIA Comparison: Overview
Advertisements

Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
Health and Safety Executive The Importance of Workforce Engagement for the Regulator Steve Walker Head of HSEs Offshore Division.
CORGI GSR 1998 Overview for London Health & Safety Network
for Pipelines & Casings
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Introduction to OH&S (Legislation)
Gas analysis and gas flow measurement in a biogas plant
Jan Buijk Biogas Fuelled Cogeneration Systems.
Mod 0273: 1 st Development Group Workshop 4 th February 2010.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
Public Health Issues Related to Mutually Conforming Labeling: CDRH Perspective Miriam C. Provost, Ph.D. Office of Device Evaluation Center for Devices.
National Smartcard Project Work Package 8 – Card Governance Report.
Gas Transmission Pipelines
UK Gas Statistics Iain MacLeay – Head Energy Balances, Prices and Publications Date 29 September 2011.
SkillsTech Australia Records & Reports Stage 2 Units: UEEPOO1,2,3B
1 CS38010 Professional Issues Health and Safety at Work.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
SHE Code 33: Safety of Pressure and Vacuum Systems Safety, Health and Environment (SHE) Group.
Basic Compressor Safety and Operation. Air and Gas Mixtures Air+Gas+Pressure+Heat=Explosion.
1 Safety Legislation Reform Information Session Presenter:Simon Ridge.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Safe Working Practices - Contents
Development of a Technique for HFCV Safey Assessment
Health and Safety Executive Health and Safety Executive Electrical Engineering HSE Perspective John Madden CEng FIET Principal Electrical Inspector Team.
Domestic Natural Gas Installations Marc Billington.
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Unit 201: Health and safety in building services engineering
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
UK Gas Statistics Iain MacLeay DECC Energy Statistics May 2011.
POSTAL CONFERENCE 25 th – 27 th February 2015 Nairobi, Kenya By Yvonne UMUTONI Chairperson of EACO Working Group 9 (Quality of Service and Consumer Affairs)
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
Health and Safety Executive Over-pressure protection: HSE’s position Stephen Murray HSE inspector, process integrity team, Offshore Division.
Bacton blending feasibility study Gas Quality Workshop 23 April 2007 Dr Nick Bates, National Grid Gas Transmission.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Presented by: Airport Full Service Consultant Services for BIG BEAR AIRPORT Prepared for: Association of California Airports ACA Conference Session 6 INNOVATIVE.
Pipelines study – final report European Commission, DG Environment Industrial Emissions, Air quality & Noise Unit 1.
Electricity at Work Regulations Course Brian McRae June 2006.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
Category Connection criteria Application for a new Minimum NTS Offtake Connection (exit) in a green-field site Application for any other category of new.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
UNC Modification 0050 – Storage Monitor Adjustment.
Review Group -140 Thoughts on additional information requirements.
Sufficiently Complex Connection Involving Pipeline Construction and/or System Reinforcement Project Sequence.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
SEC 480 assist Expect Success/sec480assistdotcom FOR MORE CLASSES VISIT
Health and Safety Executive Health and Safety Executive The Regulatory Framework for UCG– HSE’s perspective Tony Almond Redacted Health and Safety Policy.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Occupational health and safety law Chapter 23
Advanced Post Graduate Program in Piping Design & Engineering with PDMS & CAESAR-II
Example Feasibility Study Matrix
Transmission Planning Code
The Electricity at Work Regulations 1989
SHE Code 33: Safety of Pressure and Vacuum Systems
Understanding Construction Codes
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Introduction DEFINATION :-
Status report of TF-CS/OTA
PSS verification and validation
Parker domnick hunter. Safety of Electrical and
Risk Management Student Powerpoint
Gas Transmission Pipelines
Presentation transcript:

Mod 373 “Governance of NTS Connection Processes” Review Group 0291 11 August 2010 WG0508: Feasibility Study Report – Contents

Background (1) Feasibility Studies are invariably bespoke in nature in order to fulfil the customer’s requirements - dependent on the location and type of NTS connection required Feasibility Studies may be requested by customers on an ‘optioneering’ basis; can therefore be speculative The current Feasibility Study Agreement does not confer any obligations on either party to develop or modify an NTS connection National Grid does not generally require a Feasibility Study to be undertaken where the customer requires a new NTS connection in a ‘greenfield’ site

Background (2) National Grid is required to adhere to statutory legislation and has legal obligations in relation to the NTS connections process: Health and Safety at Work Act 1974 Pipeline Safety Regulations (PSR) 1996 Reg 5 – design of a pipeline Pressure Systems (Safety) Regulations (PSSR) 2000 Imposes a duty on designers, manufacturers etc to ensure systems are fit for purpose so as to prevent danger (Reg 4) Responsibility on National Grid to ensure Safe Operating Limits (SOL) on our customers’ and our own equipment are not exceeded

Feasibility Study - Contents (1) Contents of a feasibility study report depend on the nature of the study being undertaken Example content headings for a power station ramp rate study: Introduction The Model Scenarios Modelled Conclusions

Feasibility Study - Contents (2) Example content headings for increase in offtake pressure where NGG owns the metering installation: Introduction Background Filters Metering Gas Pre Heat System Fuel Gas Skid Unit Regulator Arrangement Transient Study Conclusions and Recommendations

Feasibility Study - Contents (3) Example content headings for new connection at large, complex existing site: Executive Summary & Introduction Codes of Practice & Legislation National Grid Site Facilities Design Parameters New Connection Mechanical Design Gas Flow and Isolation Valves Configuration Corrosion Protection Electrical and Instrumentation Description of Equipment and Devices Crossing and Installation Techniques

Feasibility Study - options Standalone – as is Combined with Conceptual Design Study (CDS) – does not include final detailed design and construction review the use and purpose of the CDS in order to achieve this Others?