Project X Experimental Facilities Target Facilities PASI 2013 WG1 P. Hurh (FNAL)/D. Asner (PNNL) w/ several slides stolen from R. Tschirhart (FNAL)

Slides:



Advertisements
Similar presentations
EU-PWI Taskforce EU PWI TF Meeting Nov. 4 – 6, 2009, Warsaw Summary of the PSI facility review meeting presented by R. Neu based on the Summary of the.
Advertisements

Fusion Materials Irradiation with a Spallation Source Eric Pitcher and Stuart Maloy Los Alamos National Laboratory.
Fermilab Project-X Nuclear Energy Experiments: Spallation Neutron Target and Transuranic Transmutation for Disposing of Spent Nuclear Fuels Yousry Gohar.
WG1: High Power Targets PASI 2013 Working Group Sessions Introduction Convened by: Dr. C. Densham (STFC/RAL), Mr. P. Hurh (FNAL)
WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
Accelerator R&D FFAGs EMMA, PAMELA, ADSR, etc
HiRadMat Beryllium thermal shock test Kavin Ammigan PASI 2 nd Annual Meeting RAL, UK April 2013 Contributors: P. Hurh, B. Hartsell.
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
Lesson 17 HEAT GENERATION
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
SYNERGY of Irradiation and PIE Facilities at BNL N. Simos RaDiATE Meeting December 12, 2014 BLAIRR Tandem van de GRAAFF NSLS II XPD Beamline (PIE)
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Nuclear and Energy Technologies.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
Martin Freer Materials Irradiation at University of Birmingham.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Nuclear Data for ADS and Transmutation Joint TREND/SANDAT proposal for FP6 ADOPT- Meeting, Dec E. Gonzalez-Romero (CIEMAT) Introduction Sensitivity.
High-Power Density Target Design and Analyses for Accelerator Production of Isotopes W. David Pointer Argonne National Laboratory Nuclear Engineering Division.
Nuclear Energy Options and Project-X Shekhar Mishra Fermilab Yousry Gohar ANL June 7 th 2010.
BNL Neutrino Long Baseline Neutrino Initiative N. Simos, BNL NWG Baseline = 2540 Km Homestake.
Study of a new high power spallation target concept
ISIS Target studies Could a used ISIS target provide fusion relevant irradiated tungsten material properties? Tristan Davenne 20 th May nd Radiate.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
The Proposed Materials Test Station at LANSCE Eric Pitcher Los Alamos National Laboratory Presented at the Workshop on High-Power Targetry for Future.
F Project X Overview Dave McGinnis October 12, 2007.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
The Materials Test Station Eric Pitcher Los Alamos National Laboratory Presentation to: AHIPA Workshop, Fermilab October 19, 2009.
The Materials Test Station: An Accelerator Driven Neutron Source for Fusion Materials Testing Eric Pitcher Presented at: Sixth US-PRC Magnetic Fusion Collaboration.
Monte Carlo methods in ADS experiments Study for state exam 2008 Mitja Majerle “Phasotron” and “Energy Plus Transmutation” setups (schematic drawings)
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
AN ALTERNATIVE PROPOSAL FOR A HIBRID REACTOR (SUB-CRITICAL FACILITY COUPLED WITH AN ACCELERADOR) Sergio A. Pereira and Adimir dos Santos.
An Integrated Intensity Frontier Strategy Steve Holmes & Bob Tschirhart LBNE Reconfiguration Workshop April 25, 2012.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
Solid Targets for Neutron Spallation Sources Eric Pitcher Los Alamos National Laboratory Presented to: AHIPA Workshop October 20, 2009.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Fermilab Perspective: Where are We Going with Project-X, and How Can it Benefit Nuclear Energy? Stuart Henderson PASI Meeting April 5, 2013.
Mitja Majerle for the “Energy Plus Transmutation” collaboration.
BNL Irradiation Facility Use Collimator Materials for LHC Luminosity Upgrade.
Study on the Neutronic Characteristics of Subcritical Reactors Driven by an Accelerated Pulsed Proton Beam Ali Ahmad.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Accelerator Driven Systems: Outlook Stuart Henderson Fermilab With thanks to Shekhar Mishra, Yousry Gohar, Jerry Nolen.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
HIGH POWER TARGETS AND MACHINE/DETECTOR INTERFACE WORKING GROUP SUMMARY REPORT PASI 2012 Workshop, 1/14/12 Co-conveners: C. Densham, P. Hurh, J. Thomas,
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Project X Energy Station Spallation Target March 20, 2012 D. Wootan, D. Asner 1.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
HPT & M/D I WG DISCUSSION SLIDES PASI 2012 Hurh et al.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
Heating and radiological
Demonstration of Small Scale Solar Gas Turbine
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Designing Safety into a High-power Neutron Spallation Source
CHEM 312: Lecture 19 Forensics in Nuclear Applications
Beam Window Studies for Superbeams
Summary of session 5: Innovative Ideas and New R&D
nuSTORM and the Physics Beyond Colliders workshop
Susan Hogle, Julie G. Ezold
TRL tables: power conversion and lifetime
Presentation transcript:

Project X Experimental Facilities Target Facilities PASI 2013 WG1 P. Hurh (FNAL)/D. Asner (PNNL) w/ several slides stolen from R. Tschirhart (FNAL)

What is Project X? Project X is a proposed proton accelerator complex at Fermilab that would provide the particle physics world with powerful and sensitive tools to explore a new scientific frontier. This facility would provide particle beams to multiple experiments searching for rare and hard-to-detect phenomena that will further our understanding of fundamental physics. “Project X” was a temporary title used at a 2007 planning meeting where the first version was introduced. The name, for better or worse, has stuck. 4/4/13PASI 2013 WG1 Project X Exp Facilities 2

4/4/13PASI 2013 WG1 Project X Exp Facilities 3

4/4/13PASI 2013 WG1 Project X Exp Facilities 4

4/4/13PASI 2013 WG1 Project X Exp Facilities 5

Now a staged approach 4/4/13PASI 2013 WG1 Project X Exp Facilities 6

Stage-1 Beam timing Spallation Campus Muon Campus CW Operations Campus Super-Cycle: Every 1200 msec the linac drives the Booster exclusively for 60 msec corresponding to a 5% dedicated duty factor for the Booster. The 95% balance of the timeline is CW operations. 4/4/13PASI 2013 WG1 Project X Exp Facilities 7

Example Power Staging Plan for the Research Program Program: Onset of NOvA operations in 2013 Stage-1: 1 GeV CW Linac driving Booster & Muon, n/edm programs Stage-2: Upgrade to 3 GeV CW Linac Stage-3: Project X RDR Stage-4: Beyond RDR: 8 GeV power upgrade to 4MW MI neutrinos kW** kW** 1200 kW2450 kW kW 8 GeV Neutrinos 15 kW kW**0-42 kW* kW**0-84 kW*0-172 kW*3000 kW 8 GeV Muon program e.g, (g-2), Mu2e-1 20 kW0-20 kW* kW* 1000 kW 1-3 GeV Muon program, e.g. Mu2e kW1000 kW Kaon Program 0-30 kW** (<30% df from MI) 0-75 kW** (<45% df from MI) 1100 kW1870 kW Nuclear edm ISOL program none0-900 kW kW Ultra-cold neutron program none kW kW Nuclear technology applications none0-900 kW kW # Programs: Total max power: 735 kW 2222 kW 4284 kW 6492 kW 11870kW * Operating point in range depends on MI energy for neutrinos. ** Operating point in range is depends on MI injector slow-spill duty factor (df) for kaon program. LBNE Muon Kaon Neutron 4/4/13PASI 2013 WG1 Project X Exp Facilities 8

Project X Powered Target Facilities LBNE BooNE Muon Facility Kaon Facility Spallation Neutron Facility (AKA Energy Station) 4/4/13PASI 2013 WG1 Project X Exp Facilities 9

Muon Facility pre-notional concept 4/4/13PASI 2013 WG1 Project X Exp Facilities 10

Muon Facility: pre-notional concept 4/4/13PASI 2013 WG1 Project X Exp Facilities 11 V. Lebedev, Fermilab AAC 2011

Muon Facility: pre-notional concept 4/4/13PASI 2013 WG1 Project X Exp Facilities 12

Kaon Facility: pre-notional concept 4/4/13PASI 2013 WG1 Project X Exp Facilities 13 Neutral Kaon Experiment Charged Kaon Experiment Beam Absorber

Target options Lower power experiments have used solid platinum At 1+ MW carbon (graphite or composite) materials are being considered Liquid gallium “waterfall” has also been proposed BNL enlisted to develop concepts Kaon, Muon, and Neutron facilities will share beam through a switchyard (when a facility is down, others can receive more beam) Must design to take advantage of beam greater than 1 MW! (or design for upgrade later) 4/4/13PASI 2013 WG1 Project X Exp Facilities 14 Kaon Facility: pre-notional concept

PNNL Energy Station Concept April 4, 2013Project X Experimental Target Facilities15 A new approach utilizing the flexibility of an accelerator neutron source with spectral tailoring coupled with a careful design of a set of independent test loops can provide a flexible neutron test station for DOE NE applications

Energy Station  Integrated Target Station April 4, 2013Project X Experimental Target Facilities16 1 GeV protons Spallation Target Cold Neutrons Fission Materials Fusion Materials Physics Isotopes

Project X Energy Station Workshop January 29-30, 2013 Workshop objectives Identify & explore the nuclear and fusion energy relevant R&D that would be possible in an Energy Station associated with the Project X Linac Discuss the hypothesis that an Energy Station associated with Project X could accelerate and enhance the ability to test and evaluate early research concepts. Identify the synergy and benefit that the Project X Linac could bring to the nuclear & fusion energy communities. January 29-30, 2013Project X Energy Station Workshop 17

Energy Station  Integrated Target Station Goal Develop integrated spallation target station concept to serve DOE-NE, DOE-SC-FES/HEP/NP experimental needs Rational CW spallation neutron source could augment limited US irradiation testing capability Synergy between Physics experimental needs and materials testing for fusion, fission communities Project X – Stage 1 Could provide ~1 MW of beam dedicated to a spallation neutron source for nuclear materials and fuels research (Energy Station) or shared with a physics mission facility with similar neutron source requirements (Integrated Target Station) April 4, Project X Experimental Target Facilities

Project X Integrated Target Station has the potential to benefit several areas (beyond HEP) Highest priority opportunities within the US Nuclear and Fusion energy programs are irradiation of fusion and fast reactor structural materials. Must provide a fusion and fast reactor relevant neutron flux at a minimum of 20 dpa per calendar year in a reasonable irradiation volume. Enable the in-situ real-time measurements of various separate-effects phenomena in fuels or materials, which would be very valuable to the modeling and simulation technical community. Such capabilities are more feasible in an accelerator-based system than a reactor integral effects testing of fast reactor fuels, including driver fuel, minor actinide burning fuel, and transmutation of spent fuel. support DOE Office of Nuclear Energy plus Office of Science programs Materials Program - Fusion Energy Sciences (FES) Isotope Production Program – Nuclear Physics (NP) ultra cold neutrons – Nuclear Physics (NP) 19April 4, 2013Project X Experimental Target Facilities

Closed Loop Test Modules  Removable/replaceable/customizable  Independent cooling system  n spectrum/material/temp/pressure to match reactor conditions  ~30 cm dia Spallation Target  Liquid Pb-Bi  >30 neutrons/proton  1 GeV protons penetrate ~50 cm in lead  Neutrons Similar to fission spectrum  Samples can be irradiated in proton beam  Adding W or U can increase n flux density  Small volume ~ 10 cm dia, 60 cm length  Cleanup system for spallation products Reflector  Steel/iron/nickel  High n scatter  Flattens n flux distribution Lead Matrix Test Region  Solid lead with gas or water cooling  ~ 2 m diameter, 3 m length  Low n absorb/ High n scatter  High n flux/ Fast n spectrum  Acts as gamma shield Project X Proton Beam  1 GeV (1 MW) Fast Spectrum Test Module: SFR, LFR, GFR Project X Energy Station Concept April 4, 2013Project X Experimental Target Facilities20 Thermal Spectrum Test Module: LWR, HTGR, MSR

Energy Station is Unique Combination of Existing Technologies Proton beam CW - 1 GeV - 1 mA - 1 MW Spallation Target: Liquid lead or lead-bismuth release ~30 neutrons/proton Neutron spectrum similar to fission spectrum but with high energy tail Technology has been demonstrate at MEGAPIE Test Matrix Solid lead or other (zircalloy) – high scatter, low absorption Maximizes neutron flux, provides space for array of test modules Simple solid block with cooling, holes for test modules Closed Loop Test Modules Independently tailored irradiation environments (LWR, HTGR,SFR,LFR) Independent heating/cooling system for each to control temperatures Concept utilized in FFTF (sodium), BOR-60 (sodium, lead), ATR (press. Water) Reflector to minimize leakage neutrons April 4, Project X Experimental Target Facilities

Spallation Target: 6.24e15 p/s proton beam Nominal 10 cm diameter High neutron yield Pb or LBE ~30 neutrons/proton 1 GeV protons penetrate ~50 cm in lead Neutron spectrum similar to fission but with high energy tail Coolant is target material, no stress issues in target Beam window may be life limiting Experience base from ISIS, SINQ, MEGAPIE, SNS, is ~7-22 dpa/yr on front window for SS316, T91, Inconel For our 10 cm diameter ES window, ~8 dpa/yr Need careful oxidation control, on-line cleanup Spallation products like fission products >400 KW energy deposited Potential for in-beam materials testing Energy Station Components – Spallation Target April 4, Project X Experimental Target Facilities MEGAPIE (0.8 MW) LBE target has been demonstrated

Energy Station Components – Test Matrix April 4, Project X Experimental Target Facilities 200 cm 300 cm Proton beam Lead Matrix Test Region Neutrons Test Matrix Solid lead or other (zircalloy) – high scatter, low absorption Maximizes neutron flux, provides space for array of test modules Simple thermal analysis indicates heating may allow solid lead matrix Beam tubes could provide additional testing flexibility Neutron flux Distribution in Lead Matrix Test Region Protons

High Flux Volumes Available in Test Matrix Region Neutron Flux Range (n/cm2/s) Axial Extent (cm) Outer Extent (cm) Volume (liters) >5e14308~2.8 >3e145015~23 >1e ~600 >5e ~2000 >1e ~9000 April 4, Project X Experimental Target Facilities 1 GeV protons penetrate ~ 50 cm in lead or LBE target, generate ~30 neutrons/proton Neutron flux falls off radially but lead matrix helps Axial profile peaks ~20 cm below target surface, provides ~100 cm >1e14 n/cm2/s

Energy Station Components – Closed Loop Test Modules Number of modules can be varied Each module can have unique independent coolant and materials and operate at independent temperatures (sodium, lead, molten salt, water, helium) Neutron spectrum can be tailored from fast to thermal to match reactor conditions (the gamma to neutron ratio can also be tailored) Miniaturized test specimens can maximize testing in high flux region Modules are Removable, Replaceable, shipped offsite for post irradiation examination (PIE) April 4, Project X Experimental Target Facilities Test materials Coolant/structure Spectral Tailoring materials ~100 cm

Spectrum Tailoring Can Simulate A Different Reactor in Each Module 26 Water/Zr Light Water ModuleGraphite/He Module Sodium/steel ModuleLead/steel Module April 4, 2013Project X Experimental Target Facilities

How Does Energy Station Compare? April 4, Project X Experimental Target Facilities Irradiation volumes at high flux comparable to reactors Accelerator parameters are in range of other proposed systems

Energy Station Capabilities April 4, 2013Project X Experimental Target Facilities28 Energy distribution of spallation neutrons similar to fast reactor fission spectrum but with high energy tail up to proton energy Ability to tailor neutron spectrum from fast to thermal as well as the gamma to neutron flux ratio H and He generation in materials higher than in reactor allowing accelerated aging testing Potential for beneficial isotope production and/or neutron beams simultaneous with irradiation testing Flexible design allows support to multiple missions for DOE-NE, SC-FES, SC-NP Benefits of test reactor volumes and neutron fluxes without reactor issues – licensing, fuel supply, safety, waste Robust technology allows it to be designed and constructed with today’s technology in order to fill gaps in tomorrow’s technology Continuous wave, high availability, high beam current provides potential for irradiation tests to high fluence

Actions identified to evolve concept Develop conceptual target designs that serve both particle physics and nuclear energy missions – Integrated Target Station (ITS) Develop an ITS testing program plan that capitalizes on the unique characteristics of a high-intensity accelerator and spallation source Define/refine the technical requirements to support the proposed testing program plan Compile relevant design parameters to support the high-priority mission needs and provide them to the beam and target designers Investigate the beam on/off issues for both short and long time scales. to determine which transients have the potential to be problematic due to thermal and radiation damage effects Further consideration must be given to desired damage rate/sample volume specifications to provide a meaningful irradiation capability Neutronics modeling of the notional Project X ITS concept needs to be refined to evaluate beam options (e.g., dual or rastered beam) to optimize flux and flux gradients in maximum usable test volumes. April 4, Project X Experimental Target Facilities

Opportunities for Collaboration Radiation Damage (RaDIATE) Target Facility Conceptual Design Energy Station (PNNL involvement) Kaon Facility (BNL involvement) Muon Facility Target Technologies High heat flux cooling Liquid metal target technology (kaon, muon, neutron) Beam windows Remote handling 4/4/13PASI 2013 WG1 Project X Exp Facilities 30