March 14, 2008 TEPPC 031408Mtg WestConnect Subregional Planning Update Jerry D. Smith WestConnect Planning Manager.

Slides:



Advertisements
Similar presentations
November 16, 2011 Annual Planning Workshop 11/16/2011 WestConnect 2011 Planning Workshop Overview Tami Anderson.
Advertisements

Standards Review Subcommittee Update February 19, 2013.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
NTTG Report to TEPPC BiennialTransmission Plan.
1 SCG/TEPPC November 18-19, CCPG Primary Transmission Participants.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
1 TEPPC March 25, CCPG Transmission Providers.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
1 Colorado Coordinated Planning Group PCC Update March 6-7, 2008.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Western Electricity Coordinating Council 1 WECC MIC Meeting Report on Operating Transfer Capability Policy Committee (OTCPC) Marina Del Ray October 30.
Liaison Report CREPC Liaison Report Lou Ann Westerfield Idaho Public Utility Commission Market Interface Committee March 6-7, 2008.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
MI CNF T/D Page 1 T/D Group Update to CNF Overview of Transmission Transfer Studies Results of CNF T/D Studies – Lower Michigan Group Status Thomas Vitez.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
Human pharmacology for biologicals – First into man studies Daren Austin PhD Clinical Pharmacology Discovery Medicine GlaxoSmithKline.
Highlights From the Survey on the Use of Funds Under Title II, Part A
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Public Service Company of New Mexico
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
1 FERC st Quarter Stakeholder Meeting for Transmission Planning Denver, CO March 6, :30 a.m. – 11:30 a.m.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
The Western Interconnection The West has only one RTO/ISO, the California Independent System Operator, the most costly RTO in the US at $229.2 million.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
1 North Carolina Transmission Planning Collaborative Overview Clay Norris, Chair OSC October 5, 2005.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
WestConnect Joint Sub-Regional Planning Group Meeting August 18, 2016
Status of the Planning Working Group’s (PWG) Efforts
Reliability Assessment Committee
PCC Meeting March 26, 2014.
WECC PCC Meeting July 15-16, 2014.
SunZia Project Description
WECC PCC Meeting July 15-16, 2014.
Gordon van Welie, President & Chief Executive Officer
Presentation transcript:

March 14, 2008 TEPPC Mtg WestConnect Subregional Planning Update Jerry D. Smith WestConnect Planning Manager

TEPPC Mtg2 WestConnect Subregional Planning Groups Colorado Coordinated Planning Group Southwest Area Transmission CCPG SWAT SIERRA New Area ? CCPG and SWAT act as WestConnect technical planning work groups for WestConnect planning area Coordinate Base Cases for use by all study participants Define subregional study plans, provide study resources, and perform studies Provide forum for coordination and peer review of planning studies and 10-year plans

TEPPC Mtg WestConnect Subregional Planning Participants 13 WestConnect Project Agreement for Subregional Transmission Planning Members 15 Other Participating Utilities 15 Governmental Entities 29 At large Industry Participants

TEPPC Mtg4 Status of WestConnect Subregional Planning Process 2007 Planning Cycle concluded –Annual Planning Meeting 1/17/08 –Ten Year Plan and Planning Report approved by Planning Mgmt Comm / Steering Comm 2008 Planning Cycle has commenced –2013 & 2018 Base Case being coordinated –Annual Adequacy Study of Plan this summer –Biennial Long Range Study conclude in 2009 –SWAT and CCPG will oversee Other Studies

TEPPC Mtg5

6 WestConnect Annual Adequacy Study Purpose – test the adequacy of most recently published WestConnect Transmission Plan (excluding conceptual projects) A WestConnect-wide study utilizing the 5 th and 10 th year coordinated base cases Perform traditional N-0, N-1 and N-2 contingency outages Establish reliability risk of potential corridor outages with planned transmission projects in 10 th year Complete studies by August joint CCPG/SWAT meeting Deficiencies in plan noted with sufficient lead time for subregional planning participants to investigate solutions for inclusion in the 2008 WestConnect Transmission Plan

TEPPC Mtg7 WestConnect Biennial Long Range Study Purpose – Biennially explore conceptual long range transmission needs within WestConnect Planning Area. A Westconnect –wide study of contemporary issues facing the industry in the 10 th year and beyond. Utilizes the 10 th year coordinated base case with load forecasts and generation scenarios representative of the study time period. Study limited to power flow and only considers N-1 outages. Initial study has two fold objective: –Provide traditional transmission reliability oriented studies in response to the TEPPC economic transmission study results, –Study WestConnect-wide integration of renewable energy projects Complete initial study in 2009

TEPPC Mtg8 Colorado Energy Resource Zones

TEPPC Mtg9 NM Wind Collector System Integrated with HPX

TEPPC Mtg10 Conceptual Transmission for Renewables

TEPPC Mtg Plan Summary Type Project No. Projects Total Miles Estimated Cost (2008 $M) Planned1064,6366,969 Conceptual224,2566,204 TOTAL1288,892$ 13,173

TEPPC Mtg Plan Cost Figure 2 – Cost Distribution by Voltage Class

TEPPC Mtg13 Planned Projects by Year

TEPPC Mtg14 Conceptual Projects by Year

TEPPC Mtg15 Planned Projects by State State No. Projects Total Miles Estimated Cost (2008 $M) Arizona661,4032,331 California107591,593 Colorado161,8922,016 Nevada New Mex Texas55024 Multi-State000 TOTAL1064,636$ 6,969

TEPPC Mtg16 Conceptual Projects by State State No. Projects Total Miles Estimated Cost (2008 $M) Arizona California11827 Colorado000 Nevada13170 New Mex Texas000 Multi-State33,8505,800 TOTAL224,256$ 6,204