Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Prepare + Prevent + Respond + Recover + Mitigate 1 Credit Resolution Initiative GOHSEPs focus is on proactively working with applicants to: – Identify.
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
Airport Emergency Plan - Overview
Raising the Standard for Improved Flood Risk Management in the Midwest Raising the Standard for Improved Flood Risk Management in the Midwest Interagency.
ASSESSMENT & PLANNING FOR POST-DISASTER RECOVERY OF COMMUNITY INFRASTRUCTURE United Nations Development Programme Bureau for Crisis Prevention & Recovery.
Ensure the Disaster Housing Strategy is institutionalized throughout the jurisdiction Identify a process to update and maintain the Disaster Housing Strategy.
Hospital Emergency Management
JUNE FLOODS AND STORMS Preliminary Damage Assessment Brief
Healthcare Emergency Coalitions: An Ebola Preparedness Perspective Michael Clark, MD J. Marc Liu, MD, MPH Medical Advisors-Wisconsin Hospital Emergency.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
Long Term Recovery Groups Mission, Management, and Mobilizing for Survivor Unmet need.
Capability Cliff Notes Series PHEP Capability 2—Community Recovery What Is It And How Will We Measure It?
@TxSchoolSafety Continuity of Operations Planning Workshop Devolution & Reconstitution.
Overview the local, state, and federal regulatory authorities which affect the interim housing mission Identify vital stakeholders with regulatory authority.
1 Continuity Planning for transportation agencies.
Bridging the Gaps: Public Health and Radiation Emergency Preparedness Mr. James Kish, Director Technological Hazards National Preparedness Directorate.
Detail Federal Disaster Housing Assistance Programs Identity various interim housing strategies available to local communities Explain wrap around services.
Spring 2008 Campus Emergency Management Program Overview
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
Rapid Assessment A quick evaluation of a disaster/emergency impacted area.
AmeriCorps in Times of Disaster AmeriCorps Conference July 23,
Incident Command System (ICS)
CITIZEN CORPS & CERT ORGANIZATIONS. What is Citizen Corps? Following the tragic events that occurred on September 11, 2001, state and local government.
1 CIL-NET Presents… Emergency Recovery Part II: Assisting Individuals after a Disaster A National Teleconference & Webcast Thursday, April 30, :00.
DAMAGE ASSESSMENT AND NEEDS ANALYSIS
RCPG Project Update 2013 Whole Community Conference November 22, 2013.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
The Incident Command System
Page 1 of 32 DMC Incident Command System Incident Command System for Hospitals Emergency Management Department Emergency Management Leadership Task Force.
Mitigation Focus-Public Assistance Briefing for Hurricane Sandy
The Importance of Long Term Recovery Committees 11  Whole Community Response, Recovery, Mitigation, Preparedness  April 2013 Putting the pieces back.
Survivor Centric Emergency Management Integrating the Access and Functional Needs of the Whole Community Before, During and After Disasters August 2015.
Developing Plans and Procedures
Bernards Township Office of Emergency Management February 28, 2012.
» OES’ mission is to coordinate the County’s planning for, response to, and recovery from disasters to ensure safe and livable communities. » OES achieves.
State of Ohio Disaster Housing Strategy
Visual 1.1 An Overview Multi-Hazard Emergency Planning For Schools UNIT 3.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
NFPA 1600 Disaster/Emergency Management and Business Continuity Programs.
Planning for Reunification. Presenter’s Name June 17, 2003 Multi-Agency Mass Care Templates  Feeding (being revised)  Sheltering/Sheltering Support.
Office of State Fire Marshal Oregon State Police Creating Opportunities For Improvement In Preparedness And Response Community Capability Assessment.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
What Is an Incident? An incident is an occurrence, caused by either human or natural phenomena, that requires response actions to prevent or minimize.
Moldova Floods Joint Government and Development Partners response Chisinau, July 29, State Chancellery Government of Moldova.
Session 161 National Incident Management Systems Session 16 Slide Deck.
Community Emergency Response Team
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
2015 USACE Exercise – December 1, 2015 New Madrid Seismic Zone – Earthquake FEMA Mission, Legal Authorities and Regional Capability Overview Gus Wulfkuhle.
Tom Lenart & John Field CT DEMHS Region 2.  Department of Emergency Services and Public Protection (DESPP)  Commission on Fire Prevention and Control.
Individual Assistance Preliminary Damage Assessment Preliminary Damage Assessment(PDA) 1.
1 Introduction to Emergency Management in Ohio Unit Nine: Community Partnerships.
Recreation & Security HPR 413. General Security Must encompass all operations of the organization Should be written into management plans – Plans include.
Harris County Case Study.  Aligning plans with emergency support functions (ESFs) can facilitate an efficient and effective response to emergencies.
AUDITING BUSINESS CONTINUITY PROGRAMS AND PLANS What to Look For Presented by: Tommye White, CBCP, DRP Chuck Walts, CBCP, CRP.
1 Introduction to Emergency Management in Ohio Unit Five: Community Partnerships.
Healthcare Coalitions. John Heywood English Writer
Utilizing Your Business Continuity Plan.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Emergency Operations Plan
Disaster Recovery.
Florida County Emergency Managers’ Meeting
2017 Health care Preparedness and Response Draft Capabilities
An Introduction To VDEM VDEM Director of External Affairs
Individual Assistance (IA) Individual Household Program (IHP)
FIRE/ EXPLOSION/ BOMB THREAT QRC
Presentation transcript:

Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels of government to ensure effective implementation of the disaster housing mission Detail the capability to identify, monitor and communicate ongoing situational awareness of the status of displaced survivors and the status of the interim housing mission

Notification and activation of the disaster housing team Command and control structures Disaster housing needs assessment Timeline for assistance delivery Action planning and situational reporting Coordination of survivor information and unmet needs

Identify individual responsible for activation Notify the Disaster Housing Taskforce members Identify the mobilization requirements (time, location, resource needs) Define the scope of the interim housing mission

Verify individual assignments and command and coordination mechanism Augment Taskforce membership from other organizations to address the long-term recovery mission Evaluate the Disaster Housing Taskforce membership to verify organizational representation and disaster specific needs

Response and recovery incident facilities:  Local & State Emergency Operations Centers  Local Recovery Operations Center / Long- term Recovery Coalition / Unmet Needs Task Force  Joint Housing Solutions Center  Joint Field Office  Disaster Recovery Centers

Preliminary damage assessment data and habitability assessment data allow the initial estimate of the disaster housing scope and includes: Number of homes with major damage, destroyed, or uninhabitable Number of homes which might be made habitable with minimal repairs Geographic areas with significant impacts

Homeowners may require assistance if:  Home is not habitable  Home is not insured  Home is a primary residence Renters and mobile home residents will likely need direct housing assistance at a group site U.S. citizenship/legal residency required

Initial assessment of the infrastructure will determine the local capability to support the interim housing mission: Status of utilities including power, water, and wastewater Availability of community services including fire, EMS, law enforcement, healthcare, schools, etc. Status of commercial facilities providing life sustaining goods and supplies including food, water, and construction supplies

Shelter Phase (0-21 Days) Transitional Shelter Phase (Up to 60 Days) Interim Housing Phase (Up to 18 months) Permanent Housing Phase (18 months & beyond)

Hotel and motel vacancy Available government owned/subsidized housing units Available rental/seasonal properties Available manufactured housing Pre identified properties for use as group sites

Response Phase: Planning activities are coordinated with the Emergency Operations Center and focus on life safety objectives Recovery Phase: Transition planning activities to recovery objectives with a more focused and comprehensive emphasis on the disaster housing mission

Elements to incorporate in the initial Disaster Housing Plan:  Initial emergency shelter status  Interim housing demand estimates  Status of emergency roofing program  Transitional and interim housing resource assessment  Regulatory issues  Validate contact list for utilities, permits, mobile home park managers

Elements to incorporate in a Disaster Housing Plan:  Validate need estimates with FEMA applicant registration data and local client management records  Identify and quantify unmet needs  Status of transportation resources  Status and availability of interim housing resources  Areas of environmental concern

Geographic elements to support the planning process may include:  boundaries and terrain of the affected areas  Socio-economic characteristics of the affected areas  areas of storm surge (if applicable)  population density affected by event/incident  areas with disrupted utilities and utility grids  100 and 500 year floodplain areas  numbers/types of housing in affected areas  locations of commercial parks and possible emergency group site locations  Others

FEMA registration process for Individual Assistance FEMA Inspector verifies the loss Survivor received determination letter:  Housing Funds  Direct Housing Assistance

Local Client Management Systems Coordination with the Long-term Recovery Coalition / Unmet needs committee including:  Screen the survivors disaster related unmet needs  Conduct an unmet needs gap analysis  Solicit local agency & non profit organization support  Conduct ongoing survivor follow-up

Begin planning the exit strategy during the initial stages of interim housing implementation Return survivors to a self sustaining, independent living environment Support transition within 18 months

Implementing your disaster housing strategy In your group develop a position specific checklist for one of the following positions:  Disaster Housing Coordination  Disaster Housing Permit Coordinator  Disaster Housing Group Site Selection Team Member  Temporary Roofing Program Manager

Reference the Concept of Operations Section in the local disaster housing template located on page

Organizational responsibilities Action steps to implement the Concept of Operations Information coordination with internal and external partners