GrocerSmart 4.0 redesign -request for rtf input- February 25, 2010.

Slides:



Advertisements
Similar presentations
Non-Residential Program Impact Evaluation Methods Gary Cullen, Summit Blue Consulting (360)
Advertisements

Grocery Store Measures Door Gasket, Automatic Door Closers, and Strip Curtain Laboratory Testing.
Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30,
Northwest Power and Conservation Council Draft Deemed Measures for Commercial Lighting Retrofit Regional Technical Forum March 8, 2005.
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
GrocerSmart TM Energy Modeling Software -Revision Status Report- Jeremy Litow, Associate Director David Murphy, Program Manager June 1, 2010.
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
Transformer De-Energizing & Dairy Plate Heat Exchanger Standard Protocol Proposal Presentation to the RTF February 20, 2013.
Grocery Store Measures
Evaluation of Energy Savings for Strip Curtains Presented To RTF Scott Moore PECI Sr. Engineer June 2, 2009.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum June 17, 2014.
Review Tabled Agenda Item: Additional M&V Data on Ag Pump VFD Projects Determination of M&V requirements and/or deemed savings Regional Technical Forum.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
LED Case Lighting With and Without Motion Sensors Michele Friedrich – Sr. Engineer PECI 1/5/2010.
Floating Head Pressure for Refrigeration Single Compressor Systems Michele Friedrich, PE – Sr. Engineer Dustin Bailey – Engineer PECI 11/2/2010.
Regional Technical Forum July 1st, 2008 Presented by Ryan Fedie and Jamie Anthony Portland Energy Conservation, Inc.
BPA EnergySmart Grocer Program Evaluation Deborah Swarts, Josh Arnold, Mary Klos, Roger Hill, Kevin Cooney, and Gary Cullen Summit Blue Consulting.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Energy Efficiency Preliminary Strategies for BPA Evaluations March 24, 2008.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Spreadsheet tool for the Small Air Compressor Market Presented by: Paul Warila – Cascade Energy Tom Osborn - BPA.
RTF Research and Evaluation Subcommittee Meeting Regional Technical Forum April 15, 2013.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential LED Recessed Down light Fixtures RTF January 4, 2011.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
EnergySmart Grocer Program Evaluation Findings Summary PWP, Inc.
GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Regional Technical Forum October 9, ECMs for Compressor Head Cooling Fans  Measure –Retrofit of compressor head cooling fans on low temperature.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Standard Information Workbook (SIW) Update Proposal Regional Technical Forum May 13, 2014.
Strip Curtains for Refrigerated Walk-in Boxes Michele Friedrich, PE – Sr. Engineer Eric Mullendore – Energy Analyst PECI 8/3/2010.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Analysis of Weatherization Measures Options for Savings Methodology and Presentation of Costs from 6 th Plan Regional Technical Forum May 4 th, 2010.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
© 2012 CLEAResult │ All rights reserved. 1 Overview of New Deemed Refrigeration, Food Service and Controls Measures EEIP MeetingNovember 27, 2012.
EnergySmart Grocer. 2 BPA background  The Bonneville Power Administration contracted Cascade Energy Engineering, Inc. to evaluate the GrocerSmart audit.
Out-Of-Compliance UES Measure Recommendations Part 1 – November Measures Regional Technical Forum November 19, 2013.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Northwest Power and Conservation Council New Commercial Building Program Quest Presentation, Discussion and Decision of Proposed Approach to Estimating.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Alternative Incentive Approaches BPA Energy.
High Efficiency Evaporator Coils for Medium Temperature Cases Dustin Bailey, Engineer PECI Jan 5, 2010.
EnergySmart Grocer. 2 What We’ll Cover  EnergySmart Grocer Auditing Tools  EnergySmart Grocer Customer Interaction  Q & A.
Evaluation of Wood Smoke Quantification and Attribution RTF PAC October 17, 2014.
Grocery Store Issues RTF April 10, Need Recommendations PECI: Energy Smart Grocer Program Savings method for interactive measures Savings method.
Implementer’s Group May 2015 Meeting Debrief and Upcoming Meeting Prep May 19, 2015.
BPA EnergySmart Grocer. 2 What We’ll Cover  EnergySmart Grocer Overview  Potential and Challenges  Program Elements  Program Process  Q & A.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum July 15, 2014.
Grocery VSD Measure Deemed Savings Reid Hart, PE & Ken Anderson September 28, 2010.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
Northwest Power and Conservation Council Pre-Rinse Spray Valves RTF January 2007.
Quality Control – 1 (Quality Control versus Testing) Quality Control: (Doing right things; the right way!) –A set of activities designed to ensure that.
Research and Evaluation Subcommitee – 2014 Plans Regional Technical Forum January 22, 2014.
December 11, 2012 Grocery UES Updates Reach-in LED and Case ECM.
Northwest Power and Conservation Council Energy Smart Grocer Update & Revisions RTF May 2007.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
New Refrigeration Measures -Status Report- & -Request for Input- September 13, 2010.
RTF Delivery Verification Guidance Batch 3 Jennifer Light Regional Technical Forum November 10, 2015.
BLACK HILLS ENERGY 2016 Energy Efficiency Portfolio Annual Results Overview December 8, :00am – 12:00pm MST Mark James – Energy Efficiency Program.
Energy Saving Concepts and Opportunities in Foundry (A case Study)
Small Business Considerations Outside of Lighting
Presentation transcript:

GrocerSmart 4.0 redesign -request for rtf input- February 25, 2010

Agenda Current GrocerSmart© –What we’ve learned Summit Blue EM&V Increasing measure complexity Increasing need for accuracy –How to address in future GrocerSmart©? From parametric runs to fully modeled

How GS works now –Software: Microsoft Access & SQL database –Major systems audits –Models from table data picks –Recommends EEMs –Energy savings (delta), payback

How GS works now What savings numbers does it produce? –Three kinds Deemed/prescriptive savings values –RTF approved Calculated Modeled – computer simulation

Some measures: –Floating head pressure control on multiplex racks –Floating suction pressure control on multiplex racks –Replacing shaded pole motors with ECM motors –Anti-Sweat Heat Control –Single compressors to multiplex –Efficient/oversized condenser –New higher efficiency refrigerated cases –Case lighting upgrades from T12 to T8 –Case lighting upgrades from T8 to LED –Low Anti-Sweat Heat doors –Night covers –Gaskets –Strip curtains –Auto closers

Refrigeration System parameters:

On GS accuracy… Summit Blue eval of BPA’s ESG –Results on 50% of program savings show: –Understatement of savings averages 28% (FHPC, Cases, ECMs) 3 key measures = +19, +27, +39% –Overstated savings (FHPC w/VFD) 1 key measure = 16% –Summit Blue recommendation: Apply realization rates

50% + of new measures in the pipeline are highly complex and interactive with loads, systems, or both

Relationship of Complexity to GS savings accuracy Measure complexity High Low Realization rate FHPC w/VFD FHPC w/o VFD Efficient Cases ECM case motors Low High

Accuracy – utilities want and need it RTF wants accuracy, not conservatism Technologies don’t “deem” well –Deemed denied to PECI and others Grounds: accurate and/or not conservative savings –Measure approaches segmented Deemed, deemed calculated, custom –Goal: Transparency into methods

Why is this approach best? (Approach = Modeled not parametrics) More, and more accurate kWh from programs Accuracy and transparency = regulatory risk mitigation –New approach transparent, results can be duplicated Stronger selling position for new and renewal programs, reduce future risk across portfolio Add measures – consistent / correct methodology Increase measure complexity Potential to do custom with GS/NRR-DR

Potential program impacts Perspective: BPA –Same measure mix –Apply - and + realization rates 3.4 million kWh Net on key measures: +116% over GS Net on total program savings: 7% over GS

Transparency GS inputs default choice from defined data set DOE 2.2r inputs Mod el runs case type=W= key words and values input files Output files and reports lights=X= ballasts=Y= motors=Z= ASHC=AA=

Transparency Input reportsGS inputs PECI selections associated with inputs DOE 2.2r inputs Weather files "Include" files Output reports"BDL" hourly reports

Design concepts and rationales One substantive change: –Original conception – modeling, parametrics, deemed –Revised conception – modeling and deemed Rationale –Accuracy from model Parametrics are intermediate accuracy RTF enthusiastically engages subcommittee and PNW utilities

When modeled vs. deemed? Modeled on the “do now” measures Deemed on everything else –Summit Blue: values work for different bldg types All utility reported values are modeled

Discussion