UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.

Slides:



Advertisements
Similar presentations
Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30,
Advertisements

Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Scientific Irrigation Scheduling RTF Staff/CAT Discussion RTF SIS Subcommittee November 20, 2014.
Deeming Savings for Ductless Heat Pumps in Manufactured Homes Regional Technical Forum January 4 th, 2011.
RTF 2012 Workplan Statements of Work January,
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
PTCS Service Provider Review 0 Background RTF assumed responsibility for maintaining PTCS specifications in March 2003  Developed PTCS Service Provider.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
1 SIMPLIFIED VOLTAGE OPTIMIZATION M&V PROTOCOLS Regional Technical Forum August 4, 2009.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum February 14, 2012.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Thermostatic Shower Restriction Valve –Measure Screening Results New Measure Proposal February 19th, 2014.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Integral LED Bulbs Part II presented to the Regional Technical Forum John Wilson,
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
APRIL 17, 2013 JIM WEST, SNOHOMISH BRUCE FOLSOM, AVISTA LAUREN GAGE, BPA RTF PAC: Qualitative Survey.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
RTU Measure Preparation for Review as Standard Protocol Staff Request for Authorization of RFP Funding from the Regional Technical Forum 28 June 2011.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Commercial Showerhead UES Measure Update Regional Technical Forum April 16, 2013.
Schools Lighting Hours of Use Data Regional Technical Forum May 13, 2014.
Scientific Irrigation Scheduling Provisional Standard Protocol Regional Technical Forum November 19, 2013.
Out-Of-Compliance UES Measure Recommendations Part 1 – November Measures Regional Technical Forum November 19, 2013.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Proposed 2015 RTF Work Plan September 16, Work Plan Development Process RTF 2015 work plan ProcessDate Develop draft work plan and present to Operations.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
RTF Small Saver Review Process Proposal June 19, 2012.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee May 7, 2013 Mira Vowles, P.E., CEM Emerging.
Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT.
Northwest Power and Conservation Council Pre-Rinse Spray Valves RTF January 2007.
Proposed 2015 Work Plan and 3 Year Look Back September 18, 2014.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Defining the RTF’s Role in Research Jennifer Anziano Regional Technical Forum May 15, 2015.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
RTF Management Update Jennifer Anziano Regional Technical Forum March 17, 2015.
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
RTF Staff, Subcommittee and Work Updates February 14, 2012 IRTF.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
GrocerSmart Standard Protocol Update Regional Technical Forum March 18, 2014.
Presentation transcript:

UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011

Status Update  In April RTF asked for an abstract of a research plan to calibrate GS 4.0  Calibrate to measured data for baseline & savings  Suitable of impact evaluation  Aim for eventual demonstration of GS 4.0 as standard protocol  Task to Grocery Refrigeration subcommittee with addition of evaluation experts  Subcommittee met twice in interim  Well attended, open and frank discussion (notes on web)  Concept for data collection & calibration identified  Research Plan not ready yet 2

First Meeting  Settled on key elements of data collection  15 minute interval data  Refrigeration end use and whole building  Pre-Post approach  Gas too for measures with significant HVAC interaction  Calibrate baselines & savings estimates Pre & Post  Bundled measure approach on savings  Sampling discussion 3

Second Meeting  Reviewed research abstract from PECI  Discussed further development of research, additional sub- metering, ambient temperature issues, calibration approach, sampling approach, sample sizes  Identified issues due to dual purposes of research  Impact Evaluation (Program BPA, Avista & Puget)  Calibration of GS 4.0 as RTF Standard Protocol (PECI & Utilities)  Sketched out approaches for responsibilities Utilities, PECI, third party & RTF. Avoid conflicts of interest. Arrange funding.  PECI & Program Utilities to collaborate on next iteration of research design and approach 4

Next Steps  Utilities and PECI to draft more fully formed research plan with input from RTF staff  Address both research design & implementation  Use template in Appendix C from Guidelines?  Present plan to subcommittee for review  Subcommittee to review research plan and make recommendations on  Sufficient to qualify GS 4.0 as Provisional Protocol? Will the research likely provide sufficient information to develop & test the simplest reliable estimation procedure?  Peer review of program impact evaluation plan if asked 5