AD HOC AND TAILORED EVMS REPORTING PRESENTED BY: TONY SPILLMAN Data Rich, Analysis Poor – Letting Everyone Get Involved.

Slides:



Advertisements
Similar presentations
Project Cost Management
Advertisements

Connoizor Enabling Performance for Businesses through Software Website: Contact:
© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
HP Quality Center Overview.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
Dr. L. K. Gaafar The American University in Cairo
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Confidential: For internal use only EAI PROGRAM STRUCTURING Program Management Office Role & Reporting (Draft v. 1.2) October 16, 2003.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Earned Value Management
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Cost Management Week 6-7 Learning Objectives
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Eleanor Haupt Aeronautical Systems Center Lloyd Carter
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
The Microsoft Office 2007 Enterprise Project Management Solution:
Project ManagementDay 1 in the pm Project Management (PM) Structures.
Software Project Management Lecture # 8. Outline Earned Value Analysis (Chapter 24) Topics from Chapter 25.
Chapter 4: Schedule, cost, and situation analysis (pt. 2) ISE 443 / ETM 543 Fall 2013.
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Software Project Management (SPM)
Microsoft Project Association Building an EV System using MS Project (and Excel) Kirsty C. McLean, MBA, PMP Project Controller, Photonics Division General.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
1 Alternative EVM Applications Not a One-Size-Fits-All.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
Project Cost Management
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Brookhaven Science Associates U.S. Department of Energy Facility Managers Meeting DOE-OECM Certification of Earned Value Management Systems April 27-28,
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
PMP Study Guide Chapter 11: Controlling Work Results.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
TOPIC-8B- PROJECT COST CONTROL
Progress and Performance Measurement and Evaluation
Earned Value - What is it
LSST Project EVMS Performance Overview Kevin E
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

AD HOC AND TAILORED EVMS REPORTING PRESENTED BY: TONY SPILLMAN Data Rich, Analysis Poor – Letting Everyone Get Involved

Why Ad Hoc EVMS Reporting? Data Rich, Analysis Poor 20 years of experience or 1 year of experience 20 times? EVMS Data is just Data – Value of Earned Value is in the Analysis

Steps to EVMS Analysis Validate data is accurate Calculate Variances (SV, CV and VAC)  Focus on significant variances  Look at both current 2 and cumulative 1 Graph and analyze trends Look at comparative data Analyze schedule trends, critical path Provide written analysis (Cause, Impact and Corrective Action) Evaluate remaining work versus project risks Formulate plan of action Assess realism of and adjust EAC accordingly

Specific Needs for EVMS Reporting Needs that Current Systems may not Integrate  Forecasting BCWP and SV Recovery  Detailed EAC/VAC Analysis  Risk Modeling and Change Control Impact Analysis  Estimated ACWP for non-labor  Flagging EVMS no-no’s  BCWP without ACWP (Free?)  ACWP without BCWP (not authorized?)  ETCs on Completed scope (EAC equal ACWP?)  Negative or $0 BCWS or EAC (Change control has lost control?) Non-Standard or Infrequent Analysis  Fee Bearing Scope Performance  Staffing Plans and Resource Alignment/Assignment  Funding Shortfall scenarios (Funds aren’t in EV – yea RIGHT!)  Get well plans and “get to green” plans

What is Ad Hoc EVMS Reporting? Tool designed to focus on specific problem or area Always derived from and reconciled to “source data” User-defined, sophisticated to meet needs Can provide short-term or long-term solution Oh by the way, We each do it everyday!

Types of Ad Hoc and Tailored Reporting Single Source Engines (Ocean Floor)  ACWP or Estimated ACWP transaction detail  BCWS Estimate detail  BCWP Detail to activity or task Partially-Integrated Engines (Deep Sea Diving)  BCWS and BCWP detail  ACWP and ETC detail Fully Integrated Engines (Ocean Surface)  BCWS, BCWP, ACWP, ETC Reporting Detail Tailored and Fluid Engine (Floor – 5,000 feet)  Established for infinite reporting needs  Changes with Mgmt focus, strategy and business practices

Benefits of Ad Hoc EVMS Reporting? Analysis Streamlining data gathering for Analysis Fast with little or no IT involvement  Using existing software's and datasets (Cheaper)  “Automated” to provide real-time updates and consistent outputs  Short learning curve “We’re already using it”  Basic enough for non-professionals (PM’s, CAM’s, Sr. Mgmt, Other stakeholders)  No external “ongoing” support needed  Can be rapidly deployed to team, Project, Program or Company Endless options (Scalable)  Charts, Tables, Graphs, Presentations  Drill down capability  On-the-fly analysis  Mathematical Calculation  User-defined fields, styling and layouts Synergy of team members and counterparts  “Spillman is not intelligent enough to create, but smart enough to mimic”

EVMS Applicability The intent of an EVMS is to:  provide management information using the organizations resources … compliant with the EVMS principles… allow[ing] any program regardless of size and complexity to realize the benefits of earned value management. The ANSI-748 recognizes the challenges of analysis by providing clarification that:  “… organizations must have the flexibility to establish and apply a management system that suits their management style and business environment. The system must, first and foremost, meet the organizations needs and good business practices.”

Keys to Success in Ad Hoc and Tailoring Begin with (some) end in mind Leave room to scale and expand Data from trusted (and links) sources Validate, cross-check and validate again Involve Everyone for best ideas and usage KISS – So it can weather a storm or two and SPF Be aware of Number of Databases and tools you use Maintain an organized file structure Permissions and Administration Seek Training in tools and get involved in process

Real Field Examples of Ad Hoc Reporting Performance Reporting and Analysis by:  Contract Change (REAs or CCPs)  Fund Type, Control Point, CLIN, ABB, or PWBS  Organization (Resp. and Perf.) – crossing cutting the WBS  Fee-bearing scopes of work  CBS – S/C, material, WFO and Risk Breakdown Structure  Below the point of ACWP – when collected at WP or CA  CPRs by Fiscal Year  Lifecycle Reporting when tools are geared to Fiscal Year  Integration of non-standard data points (work location, scope prioritization, work type and complexity)  Weekly Labor Distribution, Overtime, and Downtime reports  Budget (Funding) Short-fall - scope cutting exercises

SV Recovery Plan

POW Example

Weekly Integration (Summary)

Integration – PM Assessment

Scheduler Status

EAC Analysis PMCM EACACWPDelta 0AG978,685950,61128,074 0OVR57,123208, ,292 0REG2,869,0632,448,694420,369 11,435,030766,323668,707 24,255,1294,162,64992, , , Grand Total9,653,6018,536,6911,116,910

Tailored Fee Charts

Spares EVMS Tracking

Ad Hoc and Trailing EVMS Reporting Questions and Answers