Status summary of the ad-hoc discussions 13th of July 2012 oneM2M call.

Slides:



Advertisements
Similar presentations
Federal Rules of Civil Procedure 26(f) and In re Bristol-Myers Squibb Securities Litigation Lina Carreras.
Advertisements

World Class Standards OGF20 OGF-ETSI MoU BoF and ETSI GRID STF 2007 call for expert Introduction to 11th May OGF-ETSI Grid testing workshop and ETSI TC.
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #54 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
SEM14-05 APPROVING YOUR DRAFT ETSI Seminar © ETSI All rights reserved.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Admin Working Group Report to Closing Plenary Jim MacFie, Chair Steve Barclay, Vice Chair Document.
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
50th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (50th GRSP, December 2011, agenda item.
TIA Engineering Manual 6 th Edition Preview and Overview.
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
GSC: Standardization Advancing Global Communications 1 Summary of issues and results from GSC-11 IPR WG Dan Bart, TIA Chair IPR WG SOURCE:Dan Bart, IPR.
M2M Global Initiative OneM2M April 24, 2012
Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau.
RBM Executive Committee Report & Vision First-ever EC; only 6 months of work together; experiment of sorts Up to next Board & Chair/VC as to whether another.
3GPP2/OP OP Finance Oversight Committee Seoul, Korea April 18th 2000.
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
SCFAH r1 Title: Working Draft “Ad-Hoc Recommendation to SC on 3GPP2 Future” Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
GSC-8xxx SOURCE:TIA TITLE:IPR Working Group Report AGENDA ITEM:Closing Plenary Agenda Item 1.1 DECISION DISCUSSIONX INFORMATIONX 21/10/2015 Report on the.
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
1 Accredited Standards Committee C63 ® - EMC SC5 Report Stephen R Whitesell Chair 11/14/2013.
Overview of the 11 th CJK IT Standards Meeting (CJK-11) ARIB, TTC 1 M2M Meeting of Potential Consolidation Partners # March 2012 in Tokyo, Japan.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
PARIS21 Steering Committee26 April 2006 PARIS21 Steering Committee, Paris, 26 April 2006 PARIS21 Work Programme for 2006.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
Transitional Committee for the Design of the Green Climate Fund – Workstream II Mandate – status of work, and work plan ecbi Seminar, Bonn 12th June 2011.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
Platform for African-European partnership in agricultural research for development (Phase II) Nairobi WP5 meeting - PAEPARD II 4YE – Thierry - February.
Bellevue, 26 July 2012 © ETSI All rights reserved1 PRESENCE & VOTING RIGHTS.
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
September 13, 2004Chair, IEEE Joint Opening September 2004 Interim Session #10 Jerry Upton- Chair Gang Wu – Procedural.
Report January 18, 2016 doc.: /0132r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 18 January 2016 Authors:
3GPP2 TSG-SX Structure & Working Procedure Source: TSG-SX Chairman: Xiaowu(Frankle) Zhao TSG-SX Vice-Chair: Yuezhen Wang/Mike Dolan, Copyright Notice 3GPP2.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
MoW Report Group Name: TP20 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
1 30 November GPP2 SC Subject:Recommendations for 3GPP2-BBF Working Relationship Date: 30 November 2009 Source: Doug Knisely TSG-X FMOAHG.
GSC-16 Closing Plenary Summary Report
Annex III to BS/SC/PDF/A(2003)1
Facilitation Tool: Team Agreement
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
What Does it Mean for UN/CEFACT ?
5GCOM Report to Board# review and 2017/2018 objectives
SDOs and Patent Offices : Interface improvement
Executive Committee Meeting April 2010
GSC-EM TF goal, as defined initially
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Reporting 25 April 2018.
What should WG do about the ED related request from 3GPP RAN1?
GSC-16 Closing Plenary Summary Report
Admin Working Group Report to Closing Plenary
IEEE Working Group for Wireless Personal Area Networks (WPANs)
Status report of TF-CS/OTA
MIG-P orientation debate
Converged Network Management
DSG Governance Group Recommendations.
UN-GGIM: Europe & UNECE plans for greater collaboration
Presentation transcript:

Status summary of the ad-hoc discussions 13th of July 2012 oneM2M call

Working Procedures The last version of the WP is attached The document still present several proposed changes to be discussed, but is pretty stable, apart the following contentious issues: 1.The weight in terms of voting rights of Partner Type 1 versus partner Type 2: –Two views: »Keep the voting rights the same for all the partners to give a better perception to the verticals »Keep 50% of the voting power in the hand of Partners Type 1 2.CR process: –Two views: »Re-use the same well known CR process of 3GPP (and others) »Define a different process more oriented to the collaborative working tools

Working Procedures 3.Working agreement process: –Re-use the same CR process of 3GPP (and others) or not 4.Quorum: –How to calculate the quorum for voting in in particular the explicit abstention case 5.Voting list: count only the physical attendance or include the electronic participation –Two views: »electronic participation is complex to be defined and verified and removes the participation filter, allowing manipulation voting rights, better to exclude it from the acquisition of voting rights »Electronic participation makes easier the vertical engagement, better to include it in the acquisition of voting rights

Funding and Budget evaluation model The ad hoc did not progress further on these issues Current version of the founding model is proposed as input for the SC together with the meeting assumptions. The ad hoc believes that decision on meeting hosting was a precondition to progress the work. The ad hoc also discussed at the last call a TIA proposal to simplify the evaluation, this proposal is posted to this plenary for discussion Further documentation for budget evaluation has been proposed by TIA and ETSI in past meetings, but we did not see a convergence, so contribution is invited at the SC (hopefully pre-agreed between the parties).

Documents Funding models: stable, option to be closed Draft working procedures: Stable, but some further work needed, contentious issues need to be solved. Meeting schedule is not agree but provides a good discussion ground. Documents already agreed by the plenary –Partnership Agreement –IPR annex –Secretariat functions All these documents are suggested to be posted to the SC as input. Additionally: Would be also good if TIA and ETSI would provide their input on the budget evaluations (hopefully harmonized