SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.

Slides:



Advertisements
Similar presentations
Wireless Controllers. Building block for remote control & alarming Functions Local control Measurement SMS alarming Remote control via SMS Data transmission.
Advertisements

Helping Customers Lower TCO through Flowserves Technology Advantage Helping Customers Lower TCO through Flowserves Technology Advantage Web Portal Web.
Water Purification with Complete Remote Monitoring System.
NEMA. 2 Utility Metering vs. Submetering 10/11/2014 New PowerPoint Template Utility Meter Meter provided by utility with the purpose of measuring.
1 The process of analyzing all core business functions and establishing an optimized timetable for recovery. Provides baseline for:  Justification for.
MN10 - Managing Wireless Networks Building Large Scale Wireless Water Control Networks Eric Marske Product Manager ESTeem Wireless Modems.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
Steve Schwabe Woolpert Project Manager
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
Batch Implementation at Plascon Mobeni Gus Krüger Convenient Software Solutions (Pty) Ltd.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
Wireless Modems Dan Tolley Director of Business Development ESTeem Wireless Modems Wireless Business Opportunities from the FCC Narrowband Mandate.
Network Design and Implementation
Information System Economics IT PROJECT MANAGEMENT - revisited.
Network Management Functions
Chapter 19: Network Management Business Data Communications, 4e.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
GE Consumer & Industrial Multilin PMCS Energy Management Systems Vincent Thomas.
Coliform Event Recommendations and Best Management Practices Sammamish Plateau Water and Sewer District Workshop December 9th, 2014 Sammamish Plateau Water.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Database Administration Chapter 16. Need for Databases  Data is used by different people, in different departments, for different reasons  Interpretation.
Smart Cities & Smart Utility
SCADA and Telemetry Presented By:.
November 2009 Network Disaster Recovery October 2014.
Effectively Explaining the Cloud to Your Colleagues.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
0 Invensys Energy Management Division ZigBee. 1 Invensys Proprietary Data Energy Management Overview The Basics: Solutions and products that help customers.
An Introduction to AlarmInsight
Solution Overview for NIPDEC- CDAP July 15, 2005.
REMOTE SITE MANAGEMENT SOLUTION. AGENDA 2  About KoçSistem  Current Situation in Base Stations  Remote Site Management System: Sitelink  Sitelink.
Traffic Enforcement And Management System Malam-Team is Israel's largest systems integration organization, One of the most exciting solutions offered by.
Company Profile ► Our Expertise Here at SIEMSTECH we have a passion for designing and implementing integrated, network-centric technology solutions across.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
AL-MAAREFA COLLEGE FOR SCIENCE AND TECHNOLOGY INFO 232: DATABASE SYSTEMS CHAPTER 1 DATABASE SYSTEMS (Cont’d) Instructor Ms. Arwa Binsaleh.
Asset & Security Management Chapter 9. IT Asset Management (ITAM) Is the process of tracking information about technology assets through the entire asset.
ITEC 3220M Using and Designing Database Systems
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
An automated diagnostic system to streamline DSM project maintenance Johan du Plessis 15 August 2012.
SCSC 311 Information Systems: hardware and software.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
WELCOME TO SEMINAR ON SCADA WELCOME TO SEMINAR ON SCADA Presented by: ANIL KUMAR RAUT Adm No:33IE/2k.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Topics of presentation
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
Chapter 5 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Catawba County Board of Commissioners Retreat June 11, 2007 It is a great time to be an innovator 2007 Technology Strategic Plan *
Life cycle services for automation products
Yokogawa Global MES Solution Centre (GMSC)
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Module 9 Planning and Implementing Monitoring and Maintenance.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
Chapter 12 The Network Development Life Cycle
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Evaluating GIS for Disaster Management Bruce Kinner GEOG 596A.
Metering Americas April 24, 2006 Advanced Metering.
SCADA City of Phoenix Water Services Department Presented by Rico Diaz July 15, 2004.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Redcell™ Management Essentials, Juniper Networks Enterprise Edition
Discovering Computers 2010: Living in a Digital World Chapter 14
A scalable, feature-rich VMS solution, delivers enterprise-level performance along with freedom of choice, enabling system customization and compatibility.
How SCADA Systems Work?.
Network Management Functions
The Survival Plan.
Capitalize on Your Business’s Technology
Water Supply & Water Management Control System
Presentation transcript:

SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

System-wide Process Controls Upgrade Agenda  Detroit Water and Sewerage Department (DWSD)  Old Control System Limitations  Project Scope  Design Highlights  Implementation Challenges  Project Results  Moving Forward

Detroit

About DWSD Third largest municipal water and sewer utility in the United States Over $500 Million in revenue Provides services to more than 4 million retail and wholesale customers Service area of 1079 square miles Yellow - WholesaleRed - Retail

Water Wastewater Systems DWSD System Overview 5 Water Treatment Plants 20 Water Booster Stations 10 Wastewater Collection Stations 1 Wastewater Treatment Plant 7 CSO Basins 13 In-system Storage Devices 200 Remote Monitoring/Control Sites Valve, Pressure, Sewer Meter, Precipitation Gauge, CSO outfall, Dam, Level

Old System Limitations Limited monitoring due to constraints on “tone multiplexing” Single line of communication Limited configuration options for Operator (Trending, Alarming, Historical Reviews) Unable to provide Equipment status and Process Alarms Parts and repair services becoming unavailable Extremely difficult to integrate with other control systems

Background

Background

Project Scope Provide system monitoring and control from a single location Provide common equipment and functionality at all locations Achieve economies of operation Increase system reliability at SCC and remote facilities Ensure continued high water quality Ensure stable water distribution pressure Minimize CSO events Continue effective wastewater treatment

Project Scope Improve efficiencies of operations and maintenance personal Maximize use of standard off-the-shelf hardware and software Better Alarm Management Provide Redundancy Communication co-ordination (regular and emergency) Provide role based security access Provide historical database

Scope Highlights Description of new control system System component layout (include diagram) System Control Center video wall map RTU types Redundant communication description Redundant Power sources Historical data collection Disaster Recovery

Control System Upgrade Implementation Process Design workshops Graphics workshops Control narrative workshops Factory Acceptance Testing Phase over testing System acceptance testing Training (more than 700 people)

Control System Network

Primary Communication

First backup Communication

Secondary backup Communication Radio repeater Sites

Pump Station Features Automatic Pump Control Auto Pump Sequencing Communication Redundancy Instrumentation redundancy Detailed equipment alarms Power redundancy

Pump Station

Remote monitoring site Features Communicates to SCC and other remote sites via 900 MHz spread spectrum radios Custom protocol for security Can communicate to 10 other locations Remote configuration/parameter changes capability

Remote Site

Implementation Challenges Limited system access during peak season periods Multiple System Networks Phase-over conducted on live system Physical relocation of Operations staff Adaptation of Operations staff

Solution

Better monitoring capability - GIS based video wall map 3600 graphics Alarm Management 30,000 I/O points/tags Network diagnostics graphic Control system diagnostics graphic

Project Results Better management of distribution systems and remote sites Improved ability to react to rapidly changing conditions Reduced operations and maintenance costs Improved Alarm Management Increased Energy Efficiency Automated operational reports generation Increase system availability Implemented regulatory reports

Lessons Learned  More collaboration with end users during design phase  Software upgrade strategy needed  Revision control  System security

Moving Forward  Backup control center  System-wide software and hardware upgrade  Energy Management  Hydraulic Modeling Integration  Additional automated reporting  Ongoing software strategy improvements

Backup Control Center

Detroit Water & Sewerage Department Questions & Answers