Session I: Overview of progress of the SWIM program. Session I: Overview of progress of the SWIM program. 17-18 October 2012, Brussels 1.

Slides:



Advertisements
Similar presentations
Why does ERA Need to Flourish
Advertisements

EU Presidency Conference Effective policies for the development of competencies of youth in Europe Warsaw, November 2011 Improving basic skills in.
Process and mechanics of HFA progress monitoring and Review Sujit Mohanty, UNISDR The Hyogo Framework for Action Progress Review and Reporting.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) SP meeting Becici, 11 November 2010.
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
19-20 September 2013, IBGE, Rio de Janeiro, Brazil
Global Implementation Strategy for SEEA
ClimDev-Africa Program & African Climate Policy Center (ACPC)
Armand Racine Consultant Chemicals Branch
Delivering as One UN Albania October 2009 – Kigali.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
WP7 Internal Evaluation & Quality Assurance Green Employability Project StudioCentroVeneto - Toni Brunello and Paolo Zaramella Vienna, 10th January 2012.
9 February Overview AIM: Inspire investment in wood-based heat generation from under managed woodlands in England, Croatia and Slovenia drawing.
Assessment of administrative and institutional capacity
1 EU Strategy for the Baltic Sea Region as a tool to implement the EU2020 European Commission Directorate General Regional Policy Territorial Cooperation.
The EU Adaptation Strategy
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
The Implementation Structure DG AGRI, October 2005
ROM reviews Saskia Van Crugten
Technical meeting with the Regional representative offices in Brussels Brussels, 17 March 2009 The INTERACT II Programme – Knowledge Management and Capitalisation.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
Operational Programme I – Cohesion Policy Event part-financed by the European Union European Regional Development Fund Evaluation Plan for Maltas.
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
1 Lessons learned – success factors for biodiversity projects Peter Tramberend Environment Agency Austria.
| | Learning from EuroHealthNets Health Inequalities Projects.
the European Union policy
Standards and Trade Development Facility (STDF) A joint initiative in SPS capacity building and technical cooperation OIE Global Conference on Veterinary.
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
Project Appraisal Module 5 Session 6.
New EU Forest Strategy and Update on Forest Information and Monitoring
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
South East Europe Investment Committee Work Programme and Communication Plan for th Meeting of the South East European Investment Committee Sarajevo,
Which initiatives do exist and what is UNEP TEEB doing? UNEP TEEB Office Jasmin Hundorf 22 May 2013 TEEB Country Studies Learning from Experience and how.
WP3. Evaluation, Monitoring and Quality Plan Dr. Luis Sobrado 27 th May 2011.
Evaluating administrative and institutional capacity building
Expanded Constituency Workshop Siem Reap Cambodia, March 2013 Cross-Cutting Capacity Development Strategy – GEF 5.
URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
SAI Performance Measurement Framework
How to commence the IT Modernization Process?
CARMEN Policy Observatory and Dialogue Proposal Presentation to the CARMEN Directing Board Meeting San Juan, Puerto Rico 30 June 2003.
IRC International Water and Sanitation Centre 31 May 2013 Monitoring for Learning and developing Capacities in WASH 1.
Serving society Stimulating innovation Supporting legislation Inspiring other policy domains – towards the establishment of a European.
Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
Capacity Building Programme on the Economics of Adaptation Supporting National/Sub-National Adaptation Planning and Action Building Sustained Capacities.
Session IV: DROUGHT MANAGEMENT AS A NO-REGRET ACTION TOWARDS CLIMATE CHANGE October 2012, Brussels 1.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
Jean-Noel Guillossou Program Manager, SSATP SSATP Institutional Framework Annual Meeting, December 2012.
UNDP-GEF Adaptation 0 0 Impact of National Communications on Process of Integrating Climate Change into National Development Policies UNFCCC Workshop on.
GHANA Developing CSA within the National Agriculture Sector Investment Plan while reinforcing inter-sectoral consistency: progress, bottlenecks and support.
Info Day - Bucharest, Romania 3rd of December ERIK ACTION Upgrading the Innovation capacity of Existing Enterprises through INTERREG IVC.
Adaptation knowledge needs and response under the UNFCCC process Adaptation Knowledge Day V Session 1: Knowledge Gaps Bonn, Germany 09 June 2014 Rojina.
Mainstreaming Gender Dimensions into Water Resources Development and Management in the Mediterranean Region GEWAMED PROJECT Presented by Barbara Tomassini.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Presented by: Barbara Tomassini - Communication and Public Consultation KE COMMUNICATION and AWARENESS RAISING: SWIM-SM suggested priorities for nd.
MAINSTREAMING MONITORING AND EVALUATION IN EDUCATION Can education be effectively managed without an M & E system in place?
GCM, Annecy – France Activity Report Piotr Grygier Vice President Multifunctional forest management and society matters.
DETERMINE Working document # 4 'Economic arguments for addressing social determinants of health inequalities' December 2009 Owen Metcalfe & Teresa Lavin.
African Centre for Statistics United Nations Economic Commission for Africa Proposed Framework for Monitoring, Evaluation and Reporting Negussie Gorfe.
Achievements Work Package 1 Achievements Work Package 4: Identification of good practices and success stories in the region and elsewhere.
Achievements Work Package 2: Capacity building activities.
Arctic Connections Policy frameworks for regional co-operation TOWARDS AN EU POLICY and the ARCTIC INFORMATION CENTRE INITIATIVE Jaime Reynolds DG Environment.
Session III: IMRPOVING COMPLIANCE & ENFORCEMENT OF WATER LEGISLATION IN SWIM-SM COUNTRIES October 2012, Brussels 1.
Building Statistical Capacity to Monitor Development Francesca Perucci United Nations Statistics Division UNSD-SADC Statistics Project First Meeting of.
5 Project funded by the Euro- Mediterranean Regional Programme for Local Water Management of the European Union DEVELOPMENT OF TOOLS AND GUIDELINES FOR.
Capacity Building Programme on the Economics of Adaptation Supporting National/Sub-National Adaptation Planning and Action Country Support Needs to Mainstream.
INTER-AMERICAN DEVELOPMENT BANK CAPACITY BUILDING AND TRAINING.
Building Statistical Capacity UNSD perspective
Presentation transcript:

Session I: Overview of progress of the SWIM program. Session I: Overview of progress of the SWIM program October 2012, Brussels 1

OBJECTIVES OF PRESENTATION To present an overall account of SWIM-SM project first year of implementation including: 1.Development of 2012 work-plan & objectives, 2.Achievements & statistics, 3.Challenges & constraints 4.Lessons learnt 5.Way forward. 2

BRIEF REMINDER OF SWIM-SM Overall objective To promote the extensive dissemination of sustainable water management policies & practices in the context of increasing water scarcity, combined pressure on water resources from a wide range of users & in connection with CC. Specific objectives 1.Raise awareness among the decision-makers & stakeholders 2.Support PCs in designing & implementing IWRM policies 3.Contribute to ensuring institutional reinforcement & the development of the necessary planning & management skills. 3

PROJECT SYNOPSIS Project start date: 13 December 2010 Project duration: 48 months – ending 12 December 2014 Reporting period:17 September 2011 – 16 September Start of Actual Implementation:January 2012 Input: Technical assistance inputs include – Team Leader: 220 man-days/year – Key Expert 2:Water Expert : 220 man-days/year – Key Expert 3Environmental Expert : 220 man-days/year – Key Expert 4:Communications Expert: 150 man-days/year 4

5 DESIGNING THE 2012 WORK PLAN

6 FOUR PILLARS CROSS CUTTING WORK PACKAGES

7. CHALLENGES FACED DURING 1 ST YEAR OF IMPLEMENTATION CHALLENGES: 1.Political instability in the Region: 2.Occasional lack of safety and security in some countries. 3.Frequent changes in governments and water sector leaderships. 4.Occasional reluctance in disclosing water & environment data & information. 5.Some misconception about the nature of regional projects versus bilateral projects. 6.Multi-disciplinary character of the project, involving socio-economic, legislative & environmental aspects of IWRM. IMPACTS ON PROJECT IMPLEMENTATION: 1.Overdue realisation of the 1 st PSC meeting to 7 December 2011 rather than 16 September 2011 compressing the implementation period to less than 9 months. 2.Delay in the mobilisation of the NKEs. 3.Debate about the merits of Regional versus National activities delaying the implementation process. 4.Challenge 6 led to a overutilization of the non-key experts' man-days.

8 STATE OF IMPLEMENTATION OF 2012 WORK PLAN

9 IMPLEMENTATION STATISTICS

Progress of activities for the 1st year of project implementation 10

OUTPUTS STATISTICS 11

TYPE OF ACTIVITIES HELD DURING THE 1ST YEAR OF PROJECT IMPLEMENTATION 12

GEOGRAPHIC DISTRIBUTION OF ACTIVITIES FOR THE 1ST YEAR OF PROJECT IMPLEMENTATION 13

TOTAL NO OF TRAINEES PER COUNTRY FOR THE 1ST YEAR OF PROJECT IMPLEMENTATION 14

GEOGRAPHIC DISTRIBUTION OF EXPERTS IN EXPERT GROUP MEETINGS FOR THE 1ST YEAR OF PROJECT IMPLEMENTATION 15

GEOGRAPHIC DISTRIBUTION OF NKE ENGAGED DURING THE 1ST YEAR OF PROJECT IMPLEMENTATION 16

HIGHLIGHTED ACHIEVEMENTS 1.Mutual understanding & strong collaboration were realized among countries of the region with dynamic exchange of experience, success stories & best practices during regional dialogues & EGMs. 2.Mainstreaming of water issues in water relevant sectors was well perceived & accepted by water officials & considered as precondition for the management of water resources within the IWRM context. 3.Good water governance was recognized as the foundation for the three pillars of IWRM & should be addressed as such by PCs. 4.Desalination using RESs was recognized as a NCWR of great potential in the region provided that all other water demand management options & allocative efficiency were exhausted. 17

18 SELECTED TANGIBLE RESULTS 1.PCs have at their disposal clear guidelines on how to integrate CC adaptation plans into IWRM policies. 2.A number of water & environment officials from PCs are now trained on no- regret actions to support the adaptation of the water sector to CC. 3.PCs have detailed guideline & methodology of assessing economic considerations for deciding on desalination projects. 4.PCs are aware of BATNEEC in both desalination & wastewater treatment & reuse in rural areas. 5.Capacity of water & environment professionals was developed on WW & desalination best practices including field visits. 6.Challenges & constraints in the management of WUAs were identified, with clear policy options on improvement through M&E. 7.Capacity of WUA officials was developed through training & field visits. 8.Status of water resources planning in the region is assessed with focus on shortcomings & challenges in IWRM planning & implementation. 9.A dialogue established among water, environment, agriculture & water supply & wastewater practitioners on planning IWRM with focus on mainstreaming & horizontal coordination.

19 LESSONS LEARNT FROM FIRST YEAR OF IMPLEMENTATION 1.The work plan for the 1 st year was designed to offer a vast array of activities to meet the beneficiary countries’ needs & expectations. Through the implementation of these priorities, the SWIM-SM team was able to analyse & focus more on genuine country-driven issues during the next implementation period. 2.The absence of an agreed Euro-Med policy on water is not of assistance for the project’s political anchorage at the regional level; the latter should have been offered by the stalled UfM Draft Strategy on Water in the Med. 3.SWIM-SM to focus on fewer activities of higher impact & visibility in order to leave a legacy.

4.The project would be better suited to work on synergies among processes & to focus more in-depth on burning issues affecting the region. 5.Study tours on priority water issues following training undertaken by leading European water training centres & institutions appeared to be of great merit. 20

1.In preparation for the 2013 work plan, the SWIM team held a 2 days brainstorming session concentrating on issues & requests raised during the first year of implementation & assessed the needs & issues to be tackled in the framework of the 4 pillars. 2.SWIM-SM will address priority water issues intensively not extensively. 3.The merits of study tours appeared evident & included in the proposed 2013 work-plan for the following reasons: To expose young water professionals in PCs to the best water resources management practices in Europe, To witness the EU water directive in practice, To provide the opportunity for the replication of BPs, and To establish a North-South Med dialogue among water & environment practitioners. 21 THE WAY FORWARD

مع خالص شكري وامتناني For additional information please contact: Sustainable Water Integrated Management – Support Mechanism: Thank you for your kind attention Merci pour votre attention 22