INSTALLATION MANUAL Job Forman Responsibilities

Slides:



Advertisements
Similar presentations
Unit B: Safety in Agricultural Mechanics
Advertisements

Windows and Exterior Doors
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
D.T. unit 5C: Moving Toys How to make a moving toy.
Woodwork Joints 2.
Sectional Assembly and Installation
General Construction and Carpentry
Exterior Window and Door Frames
nationalheirloombuildings.com National Heirloom Buildings Of Steel Welcome to the National Heirloom Buildings Of Steel Construction Process.
Presentation Overview
October Module 5: Cleaning Activities and Checking Your Work Overview Interior cleaning techniques. Exterior cleaning techniques. How to check.
Unit 55 Roof Finish Roof Overhangs and Cornices • Open Cornices • Closed Cornices • Cornice Soffit Systems • Covering Roofs • Asphalt Shingles • Wood Shingles.
Home Slicker Plus Typar Training Presentation
ENERGY CONSERVATION: HOME WRAP, INSULATION, AND STOPPING AIR LEAKS.
Lead-Based Paint Renovation, Repair, and Painting Rule Overview of RRP Rule EPA Region 8 ************ Jim Maley.
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Interior Wall and Ceiling Finish
Let’s watch a DVD… DVD Instructor Notes
Module 6: Safety At the HIV Rapid Testing Site. Lab workersHealth workersCounselors 2 The Lab Quality System Process Control Quality Control & Specimen.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Showroom and Design Center 5300 E Arrowhead Parkway Sioux Falls, SD
By: Walter C. Brown and Daniel P. Dorfmueller
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Power Tools Safety. Portable Circular Saws Stock must be well supported in such a way that the kerf will not close and bind the blade.. Thin materials.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Installing a double Dreamscreen. Check measurement Left.
SETUP Chapter 6 Lead Abatement for Workers Course.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
ICRA Panel System Installation Instructions
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Stationary Power Tool Safety
Inspecting Exterior Systems. Over-All Observation While outside, stand back and take a look at the over-all home and site. Is ridgeline straight and level?
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC. Slide 1 GOSSAMER Redwood City, Ca Presented By: R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC Camino Del.
Objectives : ANALYZE home maintenance techniques.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Chapter 11, Section 3. Interior Installation Installing a curtain rod Mounting Venetian blinds Mounting a window shade Hanging a picture.
Chapter 27 Insulating Structures. Objectives After reading the chapter and reviewing the materials presented the students will be able to: List the ways.
Lesson Siding Agricultural Structures Interest Approach What types of buildings siding have you seen on the farm? What are some of their advantages?
Lesson 11 Siding Agricultural Structures Next Generation Science/Common Core Standards Addressed! CCSS.ELA Literacy. RST.9 ‐ 10.8 Assess the extent to.
DST H.O.M.E. Home Ownership Maintenance and Education Property Maintenance: Protect Your Property Value.
Copyright © Glencoe/McGraw-Hill Carpentry & Building Construction Applying Vinyl Siding.
Walls of Structure Decreasing the Amount of Heat Exchange.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Objective 9.01: EXPLAIN the benefits of interior home care.
Basic Cleaning Tools and Procedures
Residential Construction Unit 4- Window and Doors Mr. Todzia.
October Module 6: Cleaning Activities and Checking Your Work Overview What is effective cleanup? Interior cleaning techniques. Exterior cleaning.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
9/30/ Module 4 Clean-up and Check Your Work.
Ventilation Skill Drills.
Arbor Project Copyright © Texas Education Agency, All rights reserved.
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
How to Build a Divider Wall By Charysse Roberson.
Food Safety Risk Management Agency Relations, Nutrition, and Programs
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
Windows & Doors Chapter 8. Windows Provide natural light, air circulation, and a view for the home and members living in the home Also serve as a point.
House Painting Checklist – 7 Steps to Prepare Wall Surface for Painting Contact No : Address : 8 parr street, Toronto,
VIEW SERIES with Sliding Door
Exterior Maintenance and Cleaning
Board Replacement for Floating Floors
UT House Medics 2017 About the House – Mrs
Objectives : ANALYZE home maintenance techniques
Removal of salon doors on 1968 Roamer Sedan.
Exterior Maintenance and Cleaning
Presentation transcript:

INSTALLATION MANUAL Job Forman Responsibilities Organize the tools and equipment Organize the materials daily Personnel management (lead men & helpers) Record Keeping Time cards Materials Tickets Lead safety paperwork Customer Communication Meeting the Customer – Taking control of the project Where to park the trailers / dumpsters Set up a plan for the project so the customer knows what to expect Set up start times and confirm how to contact them if you need to for any reason Install products to meet our installation specifications Window and Door Installations Handling and storing the new products Inspect the product for damage Prepare the product for installation Job lot the project Full frame installations Replacing units in framed walls Replacing units in Masonry Openings Sash opening installations Interior installations Exterior installations Interior Casing installation Exterior Casing installation Metal Cladding exterior casings Metal Cladding soffit and fascias Attic Ventilation House Wrap Installation Siding Installation Roofing Installation Patio Installation Deck Installation Sunroom Installation Final inspections / Punch lists Prepared for Shannon Juranek

Handling and storing the new products NEVER HAUL OR STORE WINDOWS OR DOORS WITH THERMAL PANE GLASS LAYING FLAT!!! Hauling the windows while laying flat will cause the glass to vibrate and will cause premature seal failure. when it is warm, the framing will warp where it is not supported. The windows and doors are designed to carry their own weight standing upright. Hauling the glass vertically does not stress the seals in the thermal pane as much when transporting the units. Units with blinds must be hauled upside down to protect the blind cords! Verify that all of the material for the job are in stock. By verifying that all product are here for the project before the job is started allows for a smoother and better quality installation, and generally saves more time than it takes to get organized on the job site. Proper handling is required for a quality product and installation.

Installation Manual Renovate using lead safe work practices. Lead can affect children’s brains and developing nervous systems, causing reduced IQ, learning disabilities, and behavioral problems. Lead is also harmful to adults. Beginning April 2010, federal law requires contractors that disturb lead-based paint in homes, child care facilities and schools, built before 1978 to be certified and follow specific work practices to prevent lead contamination. Step 1. Paint testing must be performed on all surfaces to be affected by the work, or you must presume the paint is lead-based. Step 2. If lead is present, containment procedures must be followed. Step 3. Cleaning requirements must be met, checked by a certified professional and documented to meet the government regulations. Step 4. Lead contaminated waste and cleanup water must be disposed of safely.

Full Frame Window Installation Manual Step 1. Check the new window for size to make sure that it has the right specs, and that it will fit the opening. Step 2. Move furniture, lay drop cloths, and remove the window coverings. Changing windows in framed walls

Full Frame Window Installation Manual Step 3. Remove and save the existing interior casing. Carefully remove and save the interior casing. Pull the nails from the back side so that they do dig into the face of the other trim, or damage the wall where you lean them. Step 4. Cut the caulking around the exterior trim to allow for the existing window to be removed. Cut the caulking around the outside trim so the window can be removed without damaging the siding. Changing windows in framed walls

Full Frame Window Installation Manual Step 5. remove the exterior trim and cut through any shims and fasteners and remove the old window. Step 6. Cut the siding nails on the top and bottom of the window to allow for flashings to be installed. Changing windows in framed walls

Full Frame Window Installation Manual Step 7. Block the sill as needed to accept the new style of window. Step 8. Install sill seal over the framing, and over the house wrap behind the siding. Changing windows in framed walls

Full Frame Window Installation Manual Step 8a Correct Sill flashing installation Step 8b Correct full frame window installation Fold the house wrap up so that it flashes over the nailing fin Install the window

Full Frame Window Installation Manual Step 9. Install the corner blocks to set the window to the same depth in the wall from the interior. Step 10. Center the window in the opening, and shim the sill under the clips. Changing windows in framed walls

Full Frame Window Installation Manual Step 11. Shim behind the clips on the head of the window The window will still slide from side to side to allow for adjusting the reveal from the sash to the frame. Step 12. Adjust the sash, and shim the side jambs as needed. Changing windows in framed walls

Full Frame Window Installation Manual Step 13. Nail the nailing fin with roofing nails The nails in the nailing fins hold the exterior of the frame from moving when installing the insulation around the frame. Step 14. Install the foam insulation around the frame The foam insulation is the primary seal around the window frame. Start filling the cavity right behind the nailing fin, and make sure to work the insulation in around the shims. Changing windows in framed walls

Full Frame Window Installation Manual Step 15. Rip the jamb extensions to the correct width and screw the corners together. The jamb extension is what holds the trim together, and is also where the blind brackets will be remounted, so screwing the top corners together allow for a solid installation without having to shim behind the extension jambs. Step 16. Install the trim onto the jamb extensions. Install the trim that you took off of the old window on the new jamb extensions. Clean the old glue off with a sanding block, DO NOT RECUT THE MITERS, unless matching the trim up to the old paint lines or wall paper is not an issue. Changing windows in framed walls

Full Frame Window Installation Manual Step 17. Caulk the joint where the jamb extensions will set against the window Install color matching silicone caulking on the face of the jamb extension to glue the jamb extension to the window Step 18. Install the interior trim. Slide the interior trim into the opening, and line the trim up with the paint lines or wall paper lines on the wall. Nail the trim to the wall. DO NOT RUN NAILS THROUGH THE MDF JAMB EXTENSIONS. (Nail filler does not work to hide the nail holes) Changing windows in framed walls

Full Frame Window Installation Manual Step 19. Putty the nail holes and wash the new products Step 20. Install a fine bead of face caulking between the window and the jamb extension, and reinstall the window covering brackets Changing windows in framed walls

Full Frame Window Installation Manual Step 21. Slide a drip cap under the siding on top of the window, and custom fit wood blocking between the siding and new window frame Step 22. Install metal cladding over the wood blocking, face caulking to the siding if it is painted siding. Changing windows in framed walls

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 1. Protect the contents and the floor Move furniture as needed. Lay drop cloths from the door to the area that you are working. Remove the window coverings as needed. Standard Sash Pocket Installations – Interior installation Step 2. Remove the storm window Be careful not to damage the existing exterior trim. Remove the sash if needed, and cut the frame to remove it if necessary so it will not damage the trim.

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 3. Remove the sash Remove the existing interior stops allowing the operating sash to be removed. Pull the nails from behind right away so that they will not damage the wall or each other. Standard Sash Pocket Installations – Interior installation Step 4. Remove the sash to the interior Notes:

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 5. Dry Fit the blind stop covers Notes Standard Sash Pocket Installations – Interior installation Step 6. Install sealant on the blind stop Notes

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 7. Set the blind stop cover to the thickness of the new window This allows for the new window to set tight to the window stool. Standard Sash Pocket Installations – Interior Installation Step 8. Fasten the blind stop covers Notes

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 9. Dry fit the window Notes Standard Sash Pocket Installations – Interior Installation Step 10. Install sealant on the blind stop cover Notes

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 11. Shim the sill to straight, and fasten to the old window sill Notes Standard Sash Pocket Installations – Interior Installation Step 12. Reinstall the interior stops Notes

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 13. Clean the new products Notes Standard Sash Pocket Installations – Interior Installation Step 14. Fill the nail holes and caulk the chipped paint as needed Notes

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 15. Reinstall the window coverings Notes Standard Sash Pocket Installations – Interior Installation Step 16. Remove the drop cloths and vacuum the work area Notes

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 17. Install sealants exterior of the sill Notes Standard Sash Pocket Installations – Interior Installation Step 18. Install the sill metal (if needed) and the sill extender Notes

Sash Opening Window Installation Manual Standard Sash Pocket Installations – Interior Installation Step 19. Seal the blind stop cover to the existing trim Notes Standard Sash Pocket Installations – Interior Installation Step 20. Seal the blind stop cover to the new window. Notes

INSTALLATION MANUAL Job Forman Responsibilities Organize the tools and equipment Organize the daily Job site Safety Materials organization Equipment organization Cleanup and debris disposal daily Personnel management (lead men & helpers) Record Keeping Time cards Materials Tickets Lead safety paperwork Customer Communication Meeting the Customer – Taking control of the project Where to park the trailers / dumpsters Set up a plan for the project so the customer knows what to expect Set up start times and confirm how to contact them if you need to for any reason Install products to meet our installation specifications Window and Door Installations Metal Cladding exterior casings Metal Cladding soffit and fascias Attic Ventilation Siding Installation House Wrap Installation Inspect the product for damage Prepare the product for installation Job lot the project Lay out Running the line Installing the starter strip Accessories Corner posts Blocks Channeling openings Installing Siding Roofing Installation Patio Installation Deck Installation Sunroom Installation Final inspections / Punch lists Prepared for Shannon Juranek