1. Four LLs were published in February 2013 1.Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.

Slides:



Advertisements
Similar presentations
Trystar Generator Docking Stations & Portable Power Cable
Advertisements

Variable Frequency Drives Bypass Options
B757 Review Questions.

Denver Fire Alarm Test Preparation Speed Drill © Ted Smitty Smith 2013.
Operating Functions.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Perspective SR-22 Electrical System
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
737 PNEUMATICS MENU PRINCIPAL.
Eaton Air Circuit Breakers Arc Flash Reduction Maintenance System
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
EAS Lessons Learned Summary Lessons Learned Published in May 2014.
Medical Gas Alarm Panels
DATALOGGER Welcome to the Presentation on DATALOGGER.
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
NERC Lessons Learned Summary
Chapter 7 SYSTEM PROTECTION
Troubleshooting Electric Control Devices
TEV DUMP SWITCH FAILURES OF 2/10/09 Dan Wolff/EE Support.
POWER SYSTEM PROTECTION
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Domestic Wiring Two wires come from the power pole to the house. The ACTIVE wire is 240 V RMS. The NEUTRAL wire is 0 V and is connected to.
EAS Lessons Learned Summary Lessons Learned Published in August 2014.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Codan 5700 Series C-Band Transceiver Technical Overview.
NERC Lessons Learned Summary February NERC lessons learned published in February 2015 Two NERC lessons learned (LL) were published in February 2015.
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
Protection & Switchgear
Utility Engineers, PC.  Generation  Transmission  Distribution.
Announcements Read Chapters 10 and 11
Fire Risk In Power Facilities. Introduction Fires in Power Plants or Distribution Facilities have occurred World Wide Many have resulted in Plant Shutdowns.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
NERC Lessons Learned Summary LLs Published in September 2015.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A Presentation On 132 KV GSS BEHROR
ON 400 KV GSS RAISER JAIPUR ROAD ,BIKANER
Main contacts closed – RED Colour with ON
1 © 2015 Eaton. All Rights Reserved.. Suggestion on How to Use Industry Trainers are encouraged to use this material in their sessions Download the presentation.
NERC Lessons Learned Summary LLs Published in December 2015.
Protection of Power Systems
Protection of Power Systems
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
Equipment 1.Circuit Breaker. 3.Fuses. 4.Protecti- ve relay.2.Bus bar. TYPES OF SWITCH GEAR EQUIPMENT:-
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
Power System Protective Relaying-Part One
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
Common Problems with Performance/Testing of Batteries
Chapter 8. Electrical Systems
NERC Published Lessons Learned Summary
Sub Station.
NERC Published Lessons Learned Summary
NERC Lessons Learned Summary
Circuit Protection Unit 9.
EAS Lessons Learned Summary
NERC Published Lessons Learned Summary
NERC Published Lessons Learned Summary
NERC Published Lessons Learned
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Chapter 7 System Protection
Protection Philosophy
Background Information on Hurricane Matthew Event No.1 Event No.2
ELECTRICAL POWER-II Electrical engineering sixth semester
Chapter 8. Electrical Systems
EET 323 – Electrical System Design Lecture 9: Grounding
Power System Protective Relaying-Part One
Presentation transcript:

1

Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads to Loss of Multiple Units at a Power Station LLs can be found on the NERC website under “Events Analysis – Lessons Learned”Events Analysis – Lessons Learned A survey is provided for each LL 2

1.Was the Lesson Learned understandable and easy to read? 2.Did this Lesson Learned contain enough technical detail? 3.Did the Lesson Learned result in any actions or changes for your company? 4.How will you use this Lesson Learned in your organization? 5.What additional information or materials would make this Lesson Learned more useful? 6.If NERC publishes another Lesson Learned containing a survey like this, would you be willing to take the survey again? 3

Permanent P-G Fault occurred on Line A, (3-terminal line) All three ends cleared high speed on the initial Fault When Terminal 1 (T-1) reclosed, it cleared in zone two times DFR at T-1 confirmed the high-speed tripping for the initial Fault and delayed tripping for the subsequent Fault DFR indicated trip from T-1 may have been delayed b/c it was receiving a block 4

Causal Analysis: Relays tested - Pilot scheme and carrier transceiver – All tested good with correct relay settings Functional tests done on all three ends of the line and between all combinations of the line terminals – No problems identified Cause: Determined by process of elimination and modeling the event – The misop. resulted from the following : (1) Design of the older electromechanical relay scheme, and (2) Tapped autotransformer(xfmr) at one of the line terminals 5

– No high-side breaker at T-3, so low-side CB of the tapped auto(xfmr) tripped for line Faults – This left the primary of the auto(xfmr) connected to Line A – Pilot scheme interlocks tripping/carrier stop with the CB position – When T-1 reclosed into the faulted line, the ground source contribution from the auto(xfmr) was sufficient to start carrier blocking by the non-directional ground element at T-3 – Since low-side auto(xfmr) breaker was open at T-3, tripping/carrier stop relays (at T-3) could not operate. – This resulted in carrier signal not being stopped, which blocked the remote end from tripping high speed. 6

7 Corrective Actions: The line protection scheme was modified at Terminal 3 to stop carrier when the low-side bank breaker is open Lesson Learned: Important to review conditions that existed during an event after a misop. of a communication-assisted protection scheme If a non-directional start is used in a DCB scheme, the directional unit that stops the blocking signal should not be compromised during a sequence of normal operations If the directional unit cannot perform during a Fault, then modifications to the scheme design should be considered

8 A short circuit in a critical ac control power panel resulted in the trip of a one generator at a large power plant Lack of separation of critical ac power supply to key control sys. and plant instrument air sys. led to loss of 2 add. units at the same plant, led to large frequency dist. Plant has 3 large ST-gen units (near max at time of trip) 7 SBAC (SBACs E and H offline due to maintenance) Plants air is solely dependant on SBACs supplied through common header for – Soot blowing air (280 psi) – Service air (120 psi) – Instrument air (120 psi)

9 Short circuit in critical ac control panel for Unit A, led to control voltage drop on the Furnace Supervisory Safeguard System (FSSS) PLCs and SBACs A, B, and C Both primary and backup FSSS PLCs lost (due to voltage drop) and led Unit A tripping on normal reverse power operation – Investigation indicated that the short circuit originated from the FSSS racks 2 and 3 electrical circuits. The voltage drop caused the PLCs’ power supplies to sense low-control power voltage of less than 97 V for at least 13.6 ms – PLCs then went to a “safe” condition and shut down the systems they controlled

10 Loss of (3) SBACs (~60% plant air) led to degradation of plant service air supply and instrument air pressure for units B and C – All air pressures dropped sharply, showing that air usage at the time was too great for the remaining (2) SBACs – Plant personnel began manually isolating air to non-essential areas, but air pressure continued to decay. – SBAC G tripped (due to high air temp.) approx. 9 minutes after A, B, and C, leaving D running alone – Units B and C tripped when instrument air pressure dropped too low to keep the discharge dampers open on the Primary Air (PA) fans – Low PA pressure caused FSSS to trip all the pulverizers, resulting in unit trips due to loss of all boiler fuel

11 Critical ac control panel: Supply control power to the primary and backup FSSS from two separate critical ac power panels Engineering analysis was completed and correct fuses were installed in the critical ac panels – Fusing in critical ac power panel was not correct size Engineering review completed, and out-of-service and non-critical circuits were removed from the critical ac power panel – Out-of-service circuits & non-critical circuits were previously connected to the critical ac power panel Data loggers installed to aid in future identification of short circuit

12 Plant air supply System: Power supply was re-configured to supply control power to no more than 2 SBACs SBACs from the same panel – 3 SBACs prev. supplied by common critical ac control panel Identification of Non-critical plant air usage: Appropriate methods and isolation points were identified to isolate and remove noncritical air usage during an emergency – After evaluating the usage on all the monitored branches, if the non-essential air had been shut off promptly, Units B and C could have maintained sufficient instrument air pressure to continue operating.

13 Critical ac control panel: Control power for critical primary and backup systems, such as the FSSS and plant air supply, should be supplied from separate critical ac power panels where appropriate Critical ac power panels should be maintained with proper fusing and only necessary circuits should be connected – This will reduce the probability and impact of an equipment failure such as a short circuit Identification of Non-critical plant air usage: Technical and procedural controls should be applied to air supply systems to reduce non-critical air usage when air supply is insufficient to meet critical functions

QUESTIONS? 14 Contact :