S-44 and USACE Standards Depth Stuff Only. USACE – Single Beam QA CROSS LINE PERFORMANCE TEST: Hard BottomSoft Bottom Max. Allowable Mean Bias<0.1’<0.2’

Slides:



Advertisements
Similar presentations
J LAB Hall A Experiment E O(e,eK + ) 16 N 12 C(e,eK + ) C(e,eK + ) 12 Be(e,eK + ) 9 Li Be(e,eK + ) 9 Li H(e,eK + ) 0 E beam = 4.016, 3.777,
Advertisements

Patch Testing HYPACK 2013.
HYPACK® Multibeam Training Seminar
CSE544 Database Statistics Tuesday, February 15 th, 2011 Dan Suciu , Winter
Structure Analysis I. Lecture 8 Internal Loading Developed in Structural Members Shear & Moment diagram Ch.4 in text book.
Dr. Ali Al-Gadhib 1.How to find the value of q or  or at any horizontal level. 2.How to find shear stress at glue and force carried by nail. 3.How to.
Stress Analysis -MDP N161 Bending of Beams Stress and Deformation
Magnet rotated by 5.9 degree Distance from entrance point to magnet right bottom corner m.
NAACC Stream Crossing Survey. Field Form Page 1 Crossing Data & Structure 1 Data ~ 80% of surveys.
CTC / MTC 222 Strength of Materials
Homeless In The CITY. Finding a Dilemma What we saw What we saw.
1 Percent Proportion. 2 Percent Means ‘of a hundred’
Op Amp Nonidealities (2) Section 8.4. Topics DC Offset Input Bias Current Speed Limitations Slew Rate.
Parameterization of the Cross- Sectional Area in Milling Operations (Draft, Rev 1) Leon Xu The Boeing Company November 10, 2007.
Performance Testing What can you achieve with your MB System?
Dive Briefings and Debreifings. OBJECTIVES Outline 2 techniques for giving a good briefing or debriefing. Explain one advantage of using a slate or hard.
HYSWEEP® PATCH TESTING.
1. Subcommittee On Disaster Reduction: Inundation Working Group Co-Chairs: Mary Erickson (NOAA ), Bruce Ebersole (USACE) Completed interagency model inventory;
CTC / MTC 222 Strength of Materials
1 Pillars and Girders. 2 Pillars also referred to as: –posts –stanchions –columns.
Dividing Polynomials The objective is to be able to divide a polynomial by a monomial.
IS BEAM PUMPING RIGHT FOR YOUR PRODUCTION Rugged, simple - easy to understand Forgiving Good diagnostics exist Possible to pump the well down to low bottom.
ADDING FRACTIONS. Adding Fractions How to do…… 1.You have to get the bottoms (denominators) the same 2.To get the bottoms the same you find the biggest.
1 Percent Proportion. 2 Percent Means ‘of a hundred’
NEWTSUB DeepWorker Designed by Dr. Phil Nuytten and designers from Nuytco Nuytco’s Past designs: Deep Rover, WASP, Newt Suit, and Remora Products.
MEC Physics review Electronics & photonics. Themes Interpreting & decoding questions: –Marks per question. –Types of questions. –Patterns in questions.
Suppose you were to travel to the moon
Mechanics of Materials Shear Stress and Shear Flow In Beams))
Structure and Motion Ocean Mapping. Ocean Basin.
ALPHABET ASSIGNMENT LOOK FOR SHAPES AROUND YOU THAT CREATE LETTERS.
Patch Testing. HYSWEEP ® Calibration of a Multibeam System Patch Testing Single and Dual Head Multibeam Systems. Patch Testing Single and Dual Head Multibeam.
RD Instruments Home of the ADCP Measuring Water in Motion and Motion in Water AVOIDING BIASED DATA DURING REAL TIME HADCP DATA COLLECTION.
Dating Rocks!. Figure 7 How old is stuff? Law of superposition: Gives relative age of fossils/rock based on it’s depth.
PARTS OF THE TRIPLE BEAM BALANCE
Exponents / Powers Used to simplify and evaluate expressions. ex.: x (2x) 3.
The Process of Making The Best CO2 Machine! Agricultural Mechanics / Woodshop Mr. Weaver The Process of Making The Best.
Patch Testing. HYSWEEP ® Calibration of a Multibeam System Patch Testing Single and Dual Head Multibeam Systems. Patch Testing Single and Dual Head Multibeam.
N Element Array θ d.
Chapter 7 Transverse Shear
Data Collection Methods II
Journal of Vision. 2004;4(9):3. doi: /4.9.3 Figure Legend:
Data Collection Methods II
CE # 498 بســــم الله الرحمن الرحيـــم
Brier Terrace Middle School Mr. Sullivan
2015 TB analysis.
International Business
International Business
International Business
International Business
1. In many reinforced concrete structures and particularly in floor systems, a concrete slab is cast monolithically with and, connected to, rectangular.
Course administration (syllabus) Project Simple stuff first
الأستاذ المساعد بقسم المناهج وطرق التدريس
Follow-up question Factorize x2 + 2x – 15. Solution
این دوره شامل: تعریف مذاکره کلمات کلیدی ورودی ها انواع مذاکره
[INSERT TITLE OF PRESENTATION]
Percent Proportion.
LCLS Linac Injection Line
Chapter 7 Transverse Shear.
Gas cell apertures with dimensions (original)
Unit 1 Day 1 Key Features of Graphs
Relative Dating not your cousin.
Overview of the final test for CSC 2515
Objective: Learn to compare the values of the fractions.
Structure Analysis I Eng. Tamer Eshtawi.
Percent Proportion.
Trimmed Down so No One Panics Because There’s a Lot of That Stuff
Transverse Shear Objective:
Building pattern  Complete the following tables and write the rule 
Number of treatments ____________________________________________
Presentation transcript:

S-44 and USACE Standards Depth Stuff Only

USACE – Single Beam QA CROSS LINE PERFORMANCE TEST: Hard BottomSoft Bottom Max. Allowable Mean Bias<0.1’<0.2’ Resultant Depth Accuracy (95%): Depth < 15’0.5’ 15’ < Depth < 40’1.0’ Depth > 40’1.0’2.0’ Minimum # of Samples100 Note that in the 1 Jan 02 version of EM , it calls for the Resultant Elevation/Depth Accuracy. There is no way to compute this unless you have a lock chamber. We can computer the Resultant Repeatability, which is what most surveyors wind up using.

S-44 – Single Beam & Multibeam Formulae in meters: Special OrderOrder 1aOrder 1b Areas where under keel clearance is critical. Areas shallower than 100m where under keel clearance is less critical but features of concern to surface shipping may exist. Areas shallower than 100 where under keel clearance is not considered to be an issue for the type of surface shipping expected to transit the area. Maximum Allowable Total Vertical Uncertainty A = 0.25m B = A = 0.5m B = A = 0.5m B = TVU < [ A 2 + (B x Depth) 2 ].5

Some terms: Accuracy: How close is your measurement to the true value? Repeatability: How good are your chances of going out and measuring the same value? Uncertainty: The range about a depth measurement that should contain the true value at a certain confidence level (usually 95%). Confidence Level: The probability that the true value lies within a specified uncertainty from the measured value. Measured Depth = 25.0’ Uncertainty at a 95% Confidence Level = 1.0’ We have a 95% chance that the true sounding is between 24.0’ and 26.0’. The smaller the uncertainty, the more ‘confident’ you are that your measured value reflects the true value.

Uncertainty: How can you compute uncertainty: – Uncertainty can be based on either limitations of the measuring instruments (think TPU) or from statistical fluctuations in the quantity being measured. Limitations of the Measuring Instruments: By determining the measurement errors in each sensor and factoring how those errors propagate throughout the system, you may compute uncertainty values for your position and depth measurements. TVU = Total Vertical Uncertainty THU = Total Horizontal Uncertainty TPU = Total Propagated Uncertainty Statistical Fluctuations in the Quantity Being Measured. Determine the differences between your survey Z- values compared to: A known depth (Lock Chamber or Bar Check) A surveyed test area (Performance Test) A previously surveyed data set (Cross Check Statistics)

S-44 vs USACE: Some Numbers Depth (Ft)Depth (m)Special Order (m)Order 1A (m)Special Order (ft)Order 1A (ft) USACE Hard (ft) USACE Soft (ft)

Tests to Check Compliance Test:System Type:Testing for:What you need:Drawbacks Lock Chamber or Bar Single BeamAccuracyA lock chamber at a known depth. Hard reflective bottom does not reflect actual conditions. Lock Chamber or Bar MultibeamAccuracyA lock chamber at a known depth. Hard reflective bottom does not reflect actual conditions. Cross Check Statistics Single BeamRepeatabilitySurvey lines that intersect. Measures repeatability, not accuracy. Total Propagated Uncertainty MultibeamTheoretical Accuracy System parameters, sensor locations. In thoery, I can break 80 on a golf course. In practice, I cannot. Performance Test Single BeamRepeatabilityPerformance test area. Measures repeatability, between multibeam and single beam systems. Performance Test MultibeamRepeatabilityPerformance test area. Measures repeatability, not accuracy.

Lock Chamber Single Beam Make a note of the depth in the lock chamber (or the depth of the bar). SINGLE BEAM EDITOR: – Load your data file. – Edit spikes as you normally would. – Click ‘File – Offline Statistics’. – HYPACK 2012 will show the Average Z-value and the Std. Dev. for the Z- value.

Lock Chamber Single Beam Comments: – You have tested your accuracy at a single depth. – The acoustic properties over the concrete bottom of the lock chamber will be different than the same properties over a hard or soft bottom. – You have demonstrated how accurately you can determine the bottom of the lock chamber with your acoustic system. – I could argue you have not demonstrated the accuracy of your system over different types of bottom conditions.

Setup +/- Depth Gate: Soundings outside bar depth +/- the gate are ignored. +/- Angle Limit: Soundings with beam angle outside limits are ignored. Running The Test Run Bar Check from the Tools menu. Click “Reset Barcheck.txt” to clear the report.  Lower the bar and enter Bar Depth.  When Measured Depth stabilizes, click “Save Depth”.  Repeat for each bar depth. When done, click “Barcheck.txt” to view or print the report. Bar Check averages depths for three seconds then saves and graphs the result. Lock Chamber Multibeam: Bar Check Routine Lower a bar to a fixed depth, or use a lock chamber. Then run MBMAX

BarCheck.TXT Sample

Lock Chamber Multibeam: Bar Check Comments: – If you use a bar check, it’s damn hard to hit the bar with enough beams at a typical survey depth. Lower the bar to 10’, we get hits on beams +/- 60˚, but we’re going to be surveying at 30’. Lower the bar to 30’, we get occasional hits on beams +/- 20˚. – In a lock chamber: You may have to turn 90 degrees to keep the outside beams from hitting the walls of the chamber. Now you are assuming the lock chamber is level in that direction….. – For both: The acoustic conditions aren’t the same as the ‘real world’.

CROSS CHECK STATISTICS SINGLE BEAM Edit your data in SBMAX Run the CROSS CHECK STATISTICS program (Utilities Menu). Program Computes: Arithmetric Mean: (Average Difference) Difference Mean (Average of Abs. Value of Differences) Std. Deviation Minimum Diff. Maximum Diff.

CROSS CHECK STATISTICS Single Beam Depth Difference Abs. Val. Of Depth Average: St. Dev % Conf.1.07 Arithmetric Mean = Average of Difference Values. Difference Mean = Average of the Absolute Values of Difference Values 95% Confidence = 1.96 * St. Dev. (aw heck, just multiply by 2) Arithmetric Mean is close to 0’. Difference Mean is close to 0.1’. You are one tough surveyor! Arithmetric Mean is close to 0. Difference Mean is close to 2.0’. You probably need a heave-pitch-roll sensor. Arithmetric Mean is close to 0.5’ Difference Mean is close to 2.0’. Something is wrong.

CROSS CHECK STATISTICS Comments: – You should always run a couple cross check lines across your survey lines to allow you run CROSS CHECK STATISTICS. – This is not a measure of accuracy. It is a measure of repeatability. How confident are you that you can go out and get the same values time and time again. – You may find different results due to different weather conditions. Flat a pancake….. Light chop….. We probably shouldn’t be surveying today….. – Can it show what % of my intersections met each standard? Not yet, but we’re going to implement it in the next month or two. – Stay away from side slopes.

Total Propagated Uncertainty  Computes the ‘uncertainty’ for each measurement of the multibeam and single beam system.  Use as a planning tool or in real time.  Display the uncertainty versus survey requirements: – IHO Orders 1A, 1B & Special – USACE Hard & Soft  During data collection, certain estimates are replaced by actual values

Sample Graph  200 kHz Fansweep  Overall system (as defined only in this example) meets IHO Order 1 Positioning requirements out to 55° from nadir.  Depth Uncertainty = TVU  Position Uncertainty = THU

General Parameters Basic information concerning the multibeam system. Frequency Number of Beams Pulse Length Along/Across Track Beamwidth Maximum Ping Rate Estimated Depth of Bottom Important when planning a survey. Replaced by actual depth in real time. Survey Requirement Selection: IHO Order 1 and Special Order USACE Hard and Soft Bottom

Environment Tab  Contains items that describe the environment where the data will be collected. – Estimated Speed of Sound – Peak-to-Peak Swell – Maximum Depth that SV Measurement is Made. – Other Stuff

Sensor Info Tab Contains: Contains: Offset information for each sensor (read from HYSWEEP HARDWARE, if possible) Info on how accurately you measured each sensor position. Estimated accuracy of each sensor.

TPU Comments There are a lot of parameters in the TPU EDITOR. Most of you have no clue on what to enter for 50% of them. Surveyors just monkey with the parameters until they can justify using all their outside beams. Some of the parameters cause BIG changes to the computed TVU and THU: – Pulse Length – Water Level Uncertainty – Spatial Tide Prediction – Draft, Squat and Loading Uncertainties – Fixed Heave Uncertainty – GPS RMS Error Estimate IMHO: TPU is just one tool. I prefer the Performance Test which uses real world measurements to determine the repeatability of your system by beam angle.

Performance Testing Creating a Test Area To Make a Reference Surface: Pick a flat area. Small changes in position will not affect your overall repeatability. Set up a grid pattern to survey with your multibeam vessel. – 5 * Depth x 5 * Depth for up to 65 degre systems. – 7 * Depth x 7 * Depth for 65+ degree systems. Create a MTX file with 1’ (30cm) cells around the test area. Do a velocity cast immediately before survey, then collect your data set. In MBMAX: – Process it, using only beams out to 45 deg. – Going into Stage 3, use the MTX file you created. – Do a great job of editing. – Save out an XYZ file of average values for each cell where you have 3 or more samples.

Performance Testing Multibeam Run two lines through your test area. Edit the data in MBMAX, using all of the beam data. – The better your editing job, the better your results. – However, you just can’t delete all the outside beam data, as you won’t have enough samples to compute statistics on them. When finished editing in Phase 3, run the Beam Angle Test

Beam Angle Test Graph The ‘X’ markers show the bias (absolute value) between the Reference Surface and your check lines. The ‘O’ markers show the 95% confidence for each beam. Typically pretty flat out to 45˚….. ….starts sloping up between 45˚ and 60˚ … ….starts zooming up beyond 60˚.

Beam Angle Test: Details Tab Details Tab is Result at Specific Angle Histogram is the distribution. Max Outlier = Max difference. Mean Difference shows bias between reference and the check lines. 95% confidence = 2 * Standard Deviation. Hard BottomSoft Bottom Maximum Outlier 1.0’ Maximum Bin Size 1.0’ Maximum Allowable Mean Bias <0.1’<0.2’ Depth Accuracy (95% conf.) D<15’ = 0.5’ 15<D<40=1.0’ D>40 = 1.0’ D<15’ = 0.5’ 15<D<40=1.0’ D>40 = 2.0’

BeamAngle.TXT Report

Sample Beam Angle Test Results Which system do you have more confidence in?

Performance Test Single Beam Survey two single beam lines over the Performance Test area you created with your multibeam system. Edit the data in SBMAX and save the data to Edited ALL Format. Take the Edited ALL files into EXPORT and save them as a single XYZ file. Load the XYZ file into MBMAX. It will take you directly to Stage 3. Use the same MTX file you used when you created the Reference Surface. Select the Single Beam Test from the menu.

Performance Test Single Beam Running the Test Select Single Beam Test from the Tools menu in MBMAX. Open the Reference XYZ file. Results Once again using difference statistics = reference minus check. Histogram shows the distribution and bias. Max Outlier = Max Difference. Mean Difference = Bias. This is the main point of the test! Standard Deviation (Sigma): Spread of the difference distribution. 95% Confidence = 2*Sigma. 95% of the differences fall within 2*Sigma.

Performance Test Comments: Take a velocity cast immediately before you survey. Run the test at low tide. Chances are the velocity profile will remain constant during the test. Your inability to accurately measure the tide will be factored out. Run the test in the deepest part of the channel. Stay away from vertical changes in your test area. Sometimes, you get what you pay for…

The End