1 March 2007 NAEFS Upgrade Yuejian Zhu, Richard Wobus, Mozheng Wei, Bo Cui and Zoltan Toth Environmental Modeling Center NOAA/NWS/NCEP Acknowledgements:

Slides:



Advertisements
Similar presentations
How Well Forecast Were the 2004 and 2005 Atlantic and U. S
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Climate Prediction Applications Science Workshop
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
UNITED NATIONS Shipment Details Report – January 2006.
We need a common denominator to add these fractions.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Extended range forecasts at MeteoSwiss: User experience.
2. The WAM Model: Solves energy balance equation, including Snonlin
Slide 1The Wave Model - Last part Validation of wind & wave analysis using satellite & buoy. Altimeters onboard ERS-1/2, ENVISAT and Jason Quality is monitored.
Sub-seasonal to seasonal prediction David Anderson.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Measurements and Their Uncertainty 3.1
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
Negative Numbers What do you understand by this?.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
ABC Technology Project
NOAAs Atlantic Hurricane Season Outlooks By Dr. Gerry Bell Lead Seasonal Hurricane Forecaster Climate Prediction Center/ NOAA/NWS Hurricanes: Science and.
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
ISU Atmospheric Component Update – Part I Justin Glisan Iowa State University.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Investigating medium-range forecast uncertainty and large error cases along the East coast using ensemble and diagnostic tools  Minghua Zheng, Brian Colle,
The North American Monsoon System: Recent Evolution and Current Status Update prepared by Climate Prediction Center / NCEP 11 June 2012.
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Multiply Binomials (ax + b)(cx +d) (ax + by)(cx +dy)
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
Clock will move after 1 minute
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Select a time to count down from the clock above
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
A Regression Model for Ensemble Forecasts David Unger Climate Prediction Center.
UMAC data callpage 1 of 16Global Ensemble Forecast System - GEFS Global Ensemble Forecast System Yuejian Zhu Ensemble Team Leader, Environmental Modeling.
1 Ensemble Reforecasts Presented By: Yuejian Zhu (NWS/NCEP) Contributors:
1 Report of Inclusion of FNMOC Ensemble into NAEFS S. Lord (NCEP/EMC) Andre Methot (MSC) Yuejian Zhu, and Zoltan Toth (NOAA) Acknowledgements Bo Cui (EMC),
Modification of GFS Land Surface Model Parameters to Mitigate the Near- Surface Cold and Wet Bias in the Midwest CONUS: Analysis of Parallel Test Results.
1 Results from Winter Storm Reconnaissance Program 2008 Yucheng SongIMSG/EMC/NCEP Zoltan TothEMC/NCEP/NWS Sharan MajumdarUniv. of Miami Mark ShirleyNCO/NCEP/NWS.
1 Results from Winter Storm Reconnaissance Program 2007 Yucheng SongIMSG/EMC/NCEP Zoltan TothEMC/NCEP/NWS Sharan MajumdarUniv. of Miami Mark ShirleyNCO/NCEP/NWS.
Statistical Post Processing - Using Reforecast to Improve GEFS Forecast Yuejian Zhu Hong Guan and Bo Cui ECM/NCEP/NWS Dec. 3 rd 2013 Acknowledgements:
Presentation transcript:

1 March 2007 NAEFS Upgrade Yuejian Zhu, Richard Wobus, Mozheng Wei, Bo Cui and Zoltan Toth Environmental Modeling Center NOAA/NWS/NCEP Acknowledgements: Qingfu Liu, DingChen Hou, Mark Iredell and Stephen Lord EMC Luke Lin, David Michaud, Joey Carr and Brent Gordon NCO

2 Planned Changes - Summary 1.Increasing NAEFS (NCEP/GEFS) membership 80 perturbations in cycling (see schematic plot) Replaced operational 56 perturbations in cycling 20 perturbed long forecasts (16-d) in each cycle Replaced operational 14 long forecasts in each cycle 2.NAEFS (NCEP/GEFS) post-product Post-process 20 ensemble forecasts instead of operational 14 ensemble forecasts for: Bias correction Anomaly forecast

3 T00Z 56m T06Z 56m T18Z 56m T12Z 56m 6hrsNext T00Z Re-scaling Up to 16-d T00Z 80m 6hrs T06Z 80m T12Z 80m T18Z 80m Up to 16-d Re-scaling 6 hours breeding cycle Production 6 hours breeding cycle Planned Change Next T00Z Re-scaling

4 CurrentPlan Model GFSGFS (current) Initial uncertainty ETR Model uncertainty None Tropical storm Relocationsame Daily frequency 00,06,12 and 18UTCsame Hi-re control (GFS) T382L64 (d0-d7.5) T190L64 (d7.5-d16) same Low-re control (ensemble control) T126L28 (d0-d16) 00,0612 and 18UTC same Perturbed members 14 for each cycle20 for each cycle Forecast length16 days (384 hours)same ImplementationMay 30 th 2006March 27 th 2007 GEFS configurations

5 Early study indicated: (by Mozheng Wei) ET20/80 give most skillful probabilstic forecast when compared to 10m operation and 10m ET

6 Planned Changes 1 Increasing NAEFS (NCEP/GEFS) membership. –From current 14 increasing to 20 members per cycle. Tuning initial perturbations. Using 80 cold start initial perturbations (on Jan. 25) –From 24-h forecasts and many dates. –To have large spread of sampling –This change is intended to improve ensemble based probabilistic forecast over all and to support NAEFS (North American Ensemble Forecast System) project. –Results: Improving probabilistic skills. Not much improvement for ensemble mean (expected).

7 ENS_s – operation ENS_b – large sprd ENS_d – small sprd Doted lines – 1-day spread Day-5 PAC scores Doted lines-spread Cold start from 00UTC Nov Large initial spread has more skill

8 Different period-more runs for large initial spread (cold start) ENS_s – operation ENS_c – large sprd Cold start from 00UTC Nov. 7 th 2007 NH 500hPa ROC Tropical 500hPa ROC SH 500hPa ROC

9 20m has more prob skills than 14m ENS_s – operation ENS_b – large sprd ENS_d – small sprd NH 500hPa RPSS SH 500hPa ROC Tropical 500hPa ROC

10 Retrospective experiments/NCO real time parallel Retrospective experiments. –Summer period: August 22- September (Hurricane season). –Winter period: November 7-December –20 ensemble members. –Using current GFS. NCO real time parallel. –Starting since January Full evaluations (follow up above experiments). –Summer: –Winter: –NCO real time: Expect to implement (March ).

11 Summer 2006 Retrospective runs Winter 2006 Retrospective runs

12 Summer 2006 Retrospective runs Winter 2006 Retrospective runs

13 Summer 2006 Retrospective runs Winter 2006 Retrospective runs

14 Hurricane Track Errors (Period: 08/22-09/24/2006) Cases Hours ENSs-operational ensemble ENSx-retrospective runs Atlantic Basin Cases East Pacific Basin

15 NCO real time parallel NH 500hPa geopotential height NCO real time parallel NH 2 meter temperature

16 Conclusions of the 20m experiments Ensemble mean: –No significant different (do not expect). –No degradation (not worse – very important) Ensemble distribution (probabilistic forecast): –Significant improvement from 20 ensemble members. For ROC, EV, Reliability. Not for RPSS BSS. Initial perturbation for cold start: –Large cold start initial spread is (JIFed) From backup perturbation based on 24h forecasts in many dates. Giving sufficient spread in ET. Quickly scaling down to the expected level (1-2 days). Able to catch up large uncertainty cases. Degrading the skills a little for short lead-time in the first few cycles. –Small cold start initial spread is From backup perturbation based on 6h forecasts in one day. No degradation at early cycling. Not able to catch up large uncertainty system for longer lead-time. Because error grows very slowly.

17 Planned Changes 2 Details for Slide 2 NAEFS (NCEP/GEFS) Post Products –Bias corrected members of joint MSC-NCEP ensemble NCEP –Current: 14 (perturbed forecasts) + 1 (control forecast) = 15 forecasts at each cycle –Plan: 20 (perturbed forecasts) + 1 (control forecast) = 21 forecasts at each cycle MSC –Same: 16 (multi-model, multi-physics forecasts) + 1 (control forecast) = 17 forecasts at 00UTC and 12UTC cycle only 35 of NAEFS variables Bias correction against each center’s own operational analysis –Weights for each member for creating joint ensemble (equal weights right now) Weights don’t depend on the variables Weights depend on geographical location (low precision packing) Weights depend on the lead time –Climate anomaly percentiles for each member NCEP –Current: 14 (perturbed forecasts) + 1 (control forecast) = 15 forecasts at each cycle –Plan: 20 (perturbed forecasts) + 1 (control forecast) = 21 forecasts at each cycle MSC –Same: 16 (multi-model, multi-physics forecasts) + 1 (control forecast) = 17 forecast at 00UTC and 12UTC cycle only 19 of NAEFS variables

18 NH Mean Sea Level Pressure NH 2 Meter Temperature NH 500hPa Height NCO real time parallel: Accumulated bias (absolute values) for past one month Black – raw forecasts Red – bias corrected forecasts

19 Summary of Subjective Analysis CPC –We do not see any cause for concern that an increase in the ensemble will have any negative impact on the CPC operational products. Given that, we fully support this implementation to increase the ensemble size. HPC –There was little improvement over the standard GFS ensemble forecast. This subjective evaluation was noted on both mass fields and model QPF. –HOC recommends implementation OPC –Little difference noted between operational and parallel data sets. –OPC recommends implementation AWC –While AWC supports the idea to increase the number of members in the ensemble to represent better the envelope of possibilities for various forecast parameters, we are unable to provide a more rigorous assessment due to the lack of resources to ingest the data and routinely view the available fields