Brodie Consulting Ltd. 1 RECLAMATION SECURITY ESTIMATES MANDATE: MANDATE: Estimate the cost of reclamation assuming that it becomes necessary for the government.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Proposed Amendments to Chapter 32, Article V, Solid Waste Management Ordinance Case No. PH-ORD-041 Presented by the Orange County Environmental Protection.
1 "Isky Enviroearth System presentsIsky Enviroearth The Future of energy.
Workshop on Inventories and Projections of Greenhouse Gas Emissions from Waste under WG 1 and 2 of the Climate Change Committee Overview of methods and.
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
The Committee and Research – Where are we and where might we be going?
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Project Appraisal Module 5 Session 6.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
ODOT's Environmental Site Assessment Process
DustScan Ltd Planning Consent for Mineral Works Oliver Puddle 25 September 2013.
Planning best practice tailings disposal, management and rehabilitation strategies Presented by Mike Gowan.
ppt Tularosa Basin National Desalination Research Center Feasibility Study Presented by Mike Hightower, Sandia National Laboratories Tom Jennings,
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
Seymour Capilano Filtration Project Seymour Capilano Twin Tunnels
CON MINE CLOSURE & RECLAMATION PLAN OVERVIEW February 22 nd, 2007.
Fultz Landfill Site Remediation Ohio by Simon Taylor.
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
+ Waste Management Obj- Discuss sources and types of waste.
HATCH ACRES MEADOWBANK GOLD PROJECT REVIEW OF CUMBERLAND’S FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) Submission to Nunavut Impact Review Board (NIRB)
Zambia Copper belt lead contamination
Summitville Gold Mine Disaster
TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October Team Members: –EBA.
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
ENVIRONMENTAL MANAGEMENT. BE: Civil & Environmental Engineering: Ireland & France MSc: Environmental Management: Imperial College Experience: Certified.
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
Monday, 10/12/2007, SERBIA Prevention of Contamination from Mining & Metallurgical Industries in Serbia Strategic Plan for Prevention of Contamination.
Li-ion batteries: primary ingredients are Cobalt and Lithium Cobalt: mined from metallic minerals, often found with other metals like copper used in many.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
IAEA International Atomic Energy Agency Roger Seitz Addressing Future Human Actions for Safety Assessment Summary from CSM on Human Action And Intrusion.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
EnE 301: ENVIRONMENTAL ENGINEERING
CCR Rule: Consultant’s Perspective 2015 Air & Waste Management Association Meeting Callaway Gardens, GA Presented by: Randy Sullivan, Principal & Senior.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Review of Interventions Received after May14 th by Various Stakeholders.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
TERRAMIN AUSTRALIA Limited
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
Minerals as Non-Renewable Resources in BC
1 Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs Eastern Basin 28 June 2011.
MINING Review notes from fossil fuels - coal. MINING Diamond mine, Siberia Largest hole Diamond mine, South Africa Largest hand-dug hole.
1 Risk Factors Let choose a person-induced hazard first. The following are risk factors for an airplane crash:  A study completed by the International.
EU INITIATIVES ON MINING WASTE. Why an initiative on Mining Waste ? Key environmental issues: l Potential environmental risks during disposal m Safety.
Mining Overview. The General Mining Act (GMA, 1872) Signed by President Ulysses S. Grant. Allowed miners who claimed minerals on federal public land to.
Mineral Mining. Take a ride inside a mine video – Warm Up Video.
Mine Waste Management Presented by Cam Scott, SRK Consulting
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Tailings Dam Stability
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
TRANS-SIBERIAN GOLD PLC Annual General Meeting
Practitioner Exchange Tim Toohey, Sept 17, 2015 Corvias Solutions.
Upland Landfill Waste Discharge Application 7295 Gold River Highway
TSCHUDI COPPER MINE.
Average person produces 1700 lbs of MSW per year
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
MINING.
Mining and quarrying activities and waste generation
Addressing Future Human Actions for Safety Assessment
Presentation transcript:

Brodie Consulting Ltd. 1 RECLAMATION SECURITY ESTIMATES MANDATE: MANDATE: Estimate the cost of reclamation assuming that it becomes necessary for the government to carry out the work

Brodie Consulting Ltd. 2 Philosophy Consistent methodology & approach for all mines Consistent methodology & approach for all mines Estimate only as per the mandate: Estimate only as per the mandate: More is not better (this is contrary to common industry approach)More is not better (this is contrary to common industry approach) Do not aim high with expectation of being negotiated/arbitrated downDo not aim high with expectation of being negotiated/arbitrated down There is no benefit to a security requirement which is greater than might actually be required.There is no benefit to a security requirement which is greater than might actually be required.

Brodie Consulting Ltd. 3 Approach Evaluation of site condition – review of available information, including site inspection Evaluation of site condition – review of available information, including site inspection Evaluate closure plan Evaluate closure plan  These steps do not constitute an audit.  There is limited verification  Need to rely upon information presented in the closure plan  INAC & BCL do not do reclamation engineering for any deficiencies

Brodie Consulting Ltd. 4 Approach Identify a scope of work (tasks & quantities) which are likely to meet reclamation objectives, considering the site condition Identify a scope of work (tasks & quantities) which are likely to meet reclamation objectives, considering the site condition Identify appropriate unit costs for each task Identify appropriate unit costs for each task

Brodie Consulting Ltd. 5 COSTING ISSUES 1. Tasks not included in cost estimate 2. Optimistic performance expectations 3. Optimistic unit costs 4. Inadequate consideration of uncertainty

Brodie Consulting Ltd. 6 Uncertainty What is the likelihood that the actual cost will vary from the estimated cost ? What is the likelihood that the actual cost will vary from the estimated cost ? Uncertainty concerns fit into 3 broad groups: Uncertainty concerns fit into 3 broad groups: 1.Mine plan – shape, quantity, geochem., hydrogeology 2.Reclamation plan – how well will the reclamation measures work 3.Cost of reclamation work

Brodie Consulting Ltd. 7 Pine Point Pilot Project Many technical details are lacking: Many technical details are lacking: The few engineering drawings are basicThe few engineering drawings are basic Geochemistry of the expected rock typesGeochemistry of the expected rock types Volume and chemistry of water to be drained from within the freeze fence.Volume and chemistry of water to be drained from within the freeze fence. Process plant mass balanceProcess plant mass balance Mining sequence and schedule of backfillingMining sequence and schedule of backfilling Ore handling, tailings &DMS reject stockpiling on surfaceOre handling, tailings &DMS reject stockpiling on surface

Brodie Consulting Ltd. 8 Pine Point Pilot Project Tailings Management Tailings Management 42% of ore is to be returned U/G as paste backfill 42% of ore is to be returned U/G as paste backfill No information is presented as to where the other 58% will go No information is presented as to where the other 58% will go Let’s look at this from 3 viewpoints Let’s look at this from 3 viewpoints

Brodie Consulting Ltd. 9 Quantities of Ore/Concentrate/Tailings Ore is 5.49% Pb and 11.16% Zn Ore is 5.49% Pb and 11.16% Zn Allowing for conversion of galena & sphalerite and assuming 95% recovery and 90% purity of concentrate  31% of ore is removed as concentrate Allowing for conversion of galena & sphalerite and assuming 95% recovery and 90% purity of concentrate  31% of ore is removed as concentrate Therefore 69% of ore becomes tailings Therefore 69% of ore becomes tailings Due to volume expansion from crushing, this % of tailings cannot be returned into the mine Due to volume expansion from crushing, this % of tailings cannot be returned into the mine

Brodie Consulting Ltd. 10 Delay Until First Backfilling Stopes must be mined out before backfilling commences Stopes must be mined out before backfilling commences Mines develop multiple stopes and produce continuously from each one to provide a steady feed to the mill and smooth the cycles of mining (drill/blast/mucking) Mines develop multiple stopes and produce continuously from each one to provide a steady feed to the mill and smooth the cycles of mining (drill/blast/mucking) It could easily be 3 months of production until first stope is backfilled It could easily be 3 months of production until first stope is backfilled This represents ¼ of mine production which will be stockpiled on surface This represents ¼ of mine production which will be stockpiled on surface

Brodie Consulting Ltd. 11 Backfilling Secondary Stopes Once primary stopes are backfilled, secondary stopes can be mined Once primary stopes are backfilled, secondary stopes can be mined After ore is removed there is no incentive to backfill secondary stopes (cost of thickening, pumping, bulkheads, labor) After ore is removed there is no incentive to backfill secondary stopes (cost of thickening, pumping, bulkheads, labor)

Brodie Consulting Ltd. 12 Tailings Management Summary Tailings management is not addressed in the PPPP Project Description, other than to suggest U/G disposal Tailings management is not addressed in the PPPP Project Description, other than to suggest U/G disposal There is no supporting evaluation to indicate that all tailings can be placed U/G There is no supporting evaluation to indicate that all tailings can be placed U/G When considered from 3 different viewpoints, significant on-land tailings seems certain, potentially in the range of 115,000 m3 to 255,000 m3 When considered from 3 different viewpoints, significant on-land tailings seems certain, potentially in the range of 115,000 m3 to 255,000 m3

Brodie Consulting Ltd. 13 PPPP – Key Assumptions In Reclamation Security The company abandons the mine. The company abandons the mine. Tailings & waste rock have ARD/ML issues Tailings & waste rock have ARD/ML issues All ARD/ML material is to be placed U/G All ARD/ML material is to be placed U/G The settling pond is not a permanent tailings facility The settling pond is not a permanent tailings facility The mine workings flood and the perimeter freeze fence thaws. The mine workings flood and the perimeter freeze fence thaws. The freeze contractor has left the site and removed the refrigeration plant The freeze contractor has left the site and removed the refrigeration plant Reclamation activities include: Reclamation activities include: Remobilization and operation of the refrigeration plantRemobilization and operation of the refrigeration plant Dewatering of the mineDewatering of the mine

Brodie Consulting Ltd. 14 PPPP – Key Assumptions In Reclamation Security Slurry and pumping of the tailings into the mine Slurry and pumping of the tailings into the mine Excavate and dispose surplus tailings in historic open pit Excavate and dispose surplus tailings in historic open pit Excavation and disposal of waste rock in the shaft and raise-bore with surplus to open pits Excavation and disposal of waste rock in the shaft and raise-bore with surplus to open pits Construction of concrete cap for the shaft and raise bore Construction of concrete cap for the shaft and raise bore Flushing of the freeze fence piping system and off-site disposal of the brine Flushing of the freeze fence piping system and off-site disposal of the brine

Brodie Consulting Ltd. 15 PPPP – Key Assumptions In Reclamation Security Cut-off top of 600 pipes and remove brine circulation pipes Cut-off top of 600 pipes and remove brine circulation pipes Removal of hazardous materials from buildings and disposal off-site Removal of hazardous materials from buildings and disposal off-site Demolish buildings and dispose in Hay River landfill, tipping fee required Demolish buildings and dispose in Hay River landfill, tipping fee required Remove contaminated soil from ROM stockpile area, concentrate load-out area and railhead stockpile area Remove contaminated soil from ROM stockpile area, concentrate load-out area and railhead stockpile area Fold in settling pond liner and doze settling pond dike to bury liner and restore drainage. Fold in settling pond liner and doze settling pond dike to bury liner and restore drainage. Remove railhead buildings to Hay River landfill Remove railhead buildings to Hay River landfill

Brodie Consulting Ltd. 16 SUMMARY The Tamerlane PPPP Project Description is lacking many technical details and is inadequate with respect to tailings management The Tamerlane PPPP Project Description is lacking many technical details and is inadequate with respect to tailings management On land tailings disposal is certain to occur On land tailings disposal is certain to occur Closure planning and security is required to mitigate potential environmental effects Closure planning and security is required to mitigate potential environmental effects Reclamation security is preliminarily estimated to be in the order of $5 million, of which about 30% is water-related Reclamation security is preliminarily estimated to be in the order of $5 million, of which about 30% is water-related