 Towards transnational funding of Nuclear Physics Research Infrastructures and associated equipments GANIL-SPIRAL2 AGATA ISOLDE-ALTO JYVL-LNL-LNS- GANIL-SPIRAL1-GSI.

Slides:



Advertisements
Similar presentations
In contact Trans-national co-operation among NCPs for International Cooperation Coordinator: Greece WP 2 leader: Sweden Task 2.1 leader: South Africa.
Advertisements

ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) SP meeting Becici, 11 November 2010.
WBC-INCO.NET WP3 – Report on opportunities to access S&T Infrastructures Davor Kozmus, MHEST Steering Platform Meeting 29. October 2009, Zagreb.
Strengthening the Strategic Cooperation between the EU and Western Balkan Region in the field of ICT Research Input to panel discussion: Concrete actions.
The vision To build a staircase to European excellence in food safety research programming through trust and mutual understanding.
SAFEFOODERA WORKSHOP Food Safety Research Ideas Forum 30 th October 2006 Increasing the Impact of National Research Programmes through Transnational Cooperation.
Mutual accountability and aid transparency Mutual accountability and aid transparency Republic of Moldova 1IATI meeting, OECD Conference center.
March 2007 Overview. International Network on School Bullying and Violence The aim of the Network is to stimulate and support more effective measures.
Delivering as One UN Albania October 2009 – Kigali.
Towards transnational funding of Nuclear Physics Research Infrastructures and associated equipments GANIL-SPIRAL2 AGATA ISOLDE-SPES-ALTO JYVL-LNL-LNS-
Support for the coordination of activities ERA-NET - 1 Coordination of national and regional programmes Introduction to the ERA-NET scheme European Commission.
Extreme Light Infrastructure (ELI) 4 Pillars (2009): I. CZECH REPUBLIC: Secondary Sources 10PW II. HUNGARY: Short Pulses 10PW III. ROMANIA: Nuclear Physics.
Goal 1: acquire a mutual and better understanding of the Funding systems of nuclear physics infrastructures and associated equipments in Europe that is.
ERA-NET Cooperation and coordination of national research and innovation activities Last call 2005 Deadline September-October.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
Funding Opportunities in Europe A Personal View Gabriele-Elisabeth Körner.
Mr Neil Williams Head of the Physical and Engineering Sciences Unit Madrid: 31 May 2010.
NuPECC: Towards a New Long Range Plan for Nuclear Physics in Europe Guenther RosnerEuNPC Bochum 18/3/20091.
DRIVER & The Global Open Access Challenge University of Durham, 22nd March 07 Mary Robinson SHERPA European Development Officer University of Nottingham.
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
REALIZING BOSNIA AND HERZEGOVINAS EUROPEAN POTENTIAL: FROM POST-CONFLICT TO PRE-ACCESSION FROM DAYTON TO BRUSSELS - PROGRESS ON EU INTEGRATION - Mr. Adnan.
The Implementation Structure DG AGRI, October 2005
Luxembourg, 28/6/2011 Rossella CAFFO Project Manager Director of the Central Institute for the Union Catalogue Italian Ministry of Culture Member States.
January 15, 2007 RFID projects cluster meeting, Brussels1 Overview RFID Projects Cluster Meeting January 15, 2007 Brussels, Belgium ERA CO-ORDINATION STUDY.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
RegGov: Regional Governance of Sustainable Integrated Development of Deprived Urban Areas Improving the impact of territorial co-operation on local policies.
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
POLISH PRESIDENCY IN THE EU: COHESION POLICY AND EVALUATION-RELATED ACTIVITIES Presentation of Objectives and Programme Stanisław Bienias, Ministry of.
« HUMAN BIOMONITORING » Consultative Forum on Environment & Health 19th October 2005 in Luxembourg Update on developments.
Structural and Cohesion Funds – an Important Tool to Support Climate Protection Improving the climate resilience of Cohesion Policy Funding Programmes:
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
Follow-up. Poverty eradication: priority for Euro-African Cooperation Achieving the Millennium Development Goals Bringing Good Governance and Democracy.
Glasgow, , 1 W. Raskob (KIT) European Technology Platform on Preparedness for Nuclear and Radiological Emergency Response and Recovery NERIS-TP.
BS-ERA.NET project- state of the art Dr. Şerban PANAITESCU Project Coordinator International Learning Network (ILN) meeting on the implementation of International.
DC-NET overview Rossella Caffo, Sara Di Giorgio ICCU – Central Institute for the Union Catalogue Italian Ministry of Culture.
RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger
1 Supporting the cooperation and coordination of research activities carried out at national or regional level The “ERA-NET” Scheme
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
CREST OMC Working Group Internationalisation of R&D Brussels, 3rd April nd Phase of the CREST OMC Working Group “Internationalisation of S&T“ Final.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Networking with Southeast Europe SEE-ERA.NET Pilot Joint Call for Research Proposals Southeast European Era-Net.
Action of Contrast to Contrast to Hydraulic Hydraulic Emergency in Emergency in LOcal LOcal Urban Urban Site SiteACHELOUS.
The SEE-ERA.NET project - a brief overview on the interim project results.
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
 Towards transnational funding of Nuclear Physics Research Infrastructures GANIL-SPIRAL2 AGATA ISOLDE-ALTO JYVL-LNL-LNS- GANIL-SPIRAL1-GSI Eastern-Network.
SEE-ERA.NET Initiatives Pilot Joint Call for Research Proposals IGLO Open Session, Southeast European Era-Net Florian Gruber, Dissemination and.
Presentation WG 2 Managing EU Funds on the Regional Level Republic of Albania Ministry of European Integration (MEI) Regional Conference EU Perspectives.
Recognition: the national centre and the ENIC Network Seminar on the recognition of qualifications Baku, 22 April 2005 Gunnar Vaht Head of the Estonian.
International Bureau of the BMBF - Creating international research and education networks 1 Jörn Sonnenburg/ Martine Bonin Brussels 24 September 2009 ERA.Net.
1 ASTRONET Coordinating strategic planning for European Astronomy.
ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007.
 the creation of an "internal market" in research (free movement of knowledge, researchers and technology)  the restructuring of the European research.
3 rd WG F meeting: CRUE ERA-Net update Andreas Pichler CRUE ERA-Net dissemination officer.
ERA-Instruments Thomas Gübitz, Johannes Janssen, Christian Renner, Bonn, 4 Februar 2008 Infrastructure Funding in the Life Sciences.
Mindfuel at the heart of transport research Era-net inTransport How theCzech organisations may participate Mindfuel at the heart of transport research.
Strengthening the foundations of ERA
for the EURISOL Steering Committee
EU-Russia Cooperation in the Areas of Science, Research and Innovation
Spanish Presidency: Priorities in the field of Cohesion Policy
The ERA.Net instrument Aims and benefits
AMICI WP1 – Management, coordination and dissemination
SOCIAL DIALOGUE WITHIN EUPAN
ASTRONET Coordinating strategic planning for European Astronomy
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
WG Integrated Testing in Pilot River Basins
Presentation to European Flood Risk Management Policy Makers
DG Environment, Unit D.2 Marine Environment and Water Industry
Introduction of “Sustainable and Liveable Cities and Urban Areas” Programs Co-Sponsored by NSFC and JPI UE Yang Liexun Management Sciences Department(DMS)
Experience of the implementation of FP6; preparations towards FP7
Presentation transcript:

 Towards transnational funding of Nuclear Physics Research Infrastructures and associated equipments GANIL-SPIRAL2 AGATA ISOLDE-ALTO JYVL-LNL-LNS- GANIL-SPIRAL1-GSI Eastern-Network FAIR ALICE-LHC

ERA-NET for Research infrastructures Objectives  To step up the cooperation and coordination of national and/or regional programmes/activities towards their mutual opening and implementation of joint activities  To contribute to the development of the European Research Area by improving coherence across Europe of such programmes/activities  To help developing a European policy for research infrastructures Eligible partners are only program owners (National/region/ministries/governments or Research councils and funding agencies managing research programs)

Motivations for a Nuclear Physics ERANET- NUPNET In our field the challenge is to merge the national programs to create a stronger and more cohesive research activity which is truly European in scope Two conditions are required 1- Independent scientific assessment of the field: emerging areas,key developments, needed instruments, recommendations and scientific priorities. This is done by NuPECC and respected 2- Current funding procedures (separate funding agencies reflect separate priorities) has to be given a strategic direction to help to align some decisions on commonly agreed European research goals. This ERA-NET NUPNET proposal aims to meet this challenge

GOALS of NuPNET Mapping the science priorities (NuPECC) into a funding action plan Establish procedures and funding for trans-national common activities (variable geometry) Identification of joint activities to be implemented in the framework of NuPNET. Launching of a pilot joint activity Establish a sustainable action beyond this project 15 representatives of NP agencies, NuPECC delegation and EU officers met in PARIS to discuss the opportunity to launch a ERANET proposal called NuPNET All Participants unanimously agreed to built such proposal to be ready for the first FP7 ERANET call in May 2007 INITIATIVE PARIS June 2006

NuPNET Consortium meets for the first time at the kick-off meeting on 27 March 2008 in Paris NuPNET proposal was successful Budget : 1,3 M€ Start of the Project: 1 March 2008

List of NuPNET Partners (18 partners representing 14 countries) Partner no.CountryShort namePartner Partner 1FCNRS-IN2P3 Centre National de la Recherche Scientifique - Institut National de la Physique Nucléaire et de la Physique des Particules Partner 2DPTGSIGesellschaft für Schwerionenforschung Partner 3DBMBFBundesministerium für Bildung und Forschung Partner 4IINFNIstituto Nazionale di Fisica Nucleare Partner 5SPFECYTFundacion Espanola para la Ciencia y la Tecnologia Partner 6SPMICINN Ministerio de Ciencia y Innovac ion Partner 7BFNRSFonds National de la Recherche Scientifique Partner 8BFWO VFonds voor Wetenschappelijk Onderzoek-Vlanderen Partner 9BGINRNEInstitute of Nuclear Research and Nuclear Energy - Bulgarian Academy of Sciences Partner 10FCEACommissariat à l'Energie Atomique Partner 11CZNPI ASCRNuclear Physics Institute - Academy of Sciences of the Czech Republic Partner 12FIHIPHelsinki Institute of Physics Partner 13GRGSRTGeneral Secretariat for Research and Technology Partner 14HUNKTHNational Office for Research and Technology Partner 15NLRuGRijksuniversiteit Groningen Partner 16PLNCBiRNational Centre for Research and Development Partner 17ROIFIN-HHNational Institute of Physics and Nuclear Engineering Partner 18UKSTFCScience and Technology Facilities Council

The NuPNET strategy: Success through a stepwise approach Information exchange and Census of resources for Nuclear Physics Funding Bodies Agreement on an Action Plan for Infrastructures (Resource and financial Action plan of Agencies) Implementation of pilot projects of the Action plan participants are Funding agencies and ministries From 14 EU countries

The NuPNET strategy: a combined Management Structure

Appointed Leaders of NuPNET

List of deliverables

Actions since the kick-off in March 2008 Year 1 –the first half- (March – Sept 2008)  NuPNET Kick-off meeting on 27 March in Paris  Article on  Co-ordination Committee (CC) meets for the 1st time on May 19 in Frankfurt  The NUPNET Consortium approves the Consortium Agreement (mid-June)  Submission of Deliverable "Short Management Plan" (approved by EU)  First run of the WP2 Questionnaire (sent to CC members only)  Article in "Le Journal du CNRS"  Article in "Nuclear Physics News"  A Logo for NuPNET  Submission of Deliver. "Communication Plan & Logo" (approved by EU)  Article in "CNRS International Magazine"  The EU transmits the draft Grant Agreement (beg. July)  Official run of the WP2 Questionnaire (sent to NuPNET Consortium)

Year 1 –the second half- (Sept. 08 – Feb. 09)  1st NuPNET Open Days on 8 Sept. in Athens Greece,Roumania,CK,Hungary,Bulgaria  Announcements on Cordis Wire (EU) + NSCR + GSRT  1st Governing Council on 13 Oct. in Madrid  Information relayed on Cordis Wire (EU) + MICINN + FECYT  Interviews for the Spanish Scientific News Platform (video)  The EU signs the final Grant Agreement (14 Oct. 2008)  CC meets for the 2nd time on 30 Oct. in Darmstadt  2nd NuPNET Open Days on Oct. 08 in Darmstadt Germany,Belgium, NL,Finland  Announcements on Cordis Wire (EU) and GSI  Article in "CERN Courier" (on-line + magazine)  1st instalment of the pre-financing received at CNRS/IN2P3 (14 Nov. 2008)  All NuPNET members have signed the Forms A giving them an "Accession to the NuPNET Contract" (22 Jan.)  CC meets for the 3rd time on 11 Feb. in Paris  First run of the WP3 Questionnaire (sent to CC members only) Actions since Sept. 2008

Actions since March 2009 Year 2 –the first half- (March - Aug. 09)  Completed Questionnaires have all been received by WP2  A Web site for NuPNET:  Analysis of completed Questionnaires by WP2 (in progress)  CC meets for the 4th time on 18 March in Bochum  A Intranet for NuPNET  CC meets for the 5th time on 12 May in Milan  3rd NuPNET Open Days on May 09 in Milan France,Italy,Poland,Spain,UK  July Submission of Deliver. "Census of Funding“ see exemples On our time table  Fall Submission of Deliver. "1st Activity Report“  Feb 2010 WP3 questionnaire and list of Opportunities

WP2: Questionnaire - Structure and Schedule - Schedule Testrun in June /July 08 Quest. sent to Consortium Aug. 08 Final run in Dec Analysis Census on existing programs (D&M) by June 2009 General compilation of results (D) by May 2010

WP2 -Results – NuPNET members FUNDING of NP

WP2 - First Results – STAFF EMPLOYED

WP2 - First Results – SALARIES

WP2 - First Results – FP6- Support to NP

WP3-Definition of joint activities Identify opportunities for the Funding Agencies to pool resources Identify opportunities for the Funding Agencies to pool resources Find the best formal and legal framework for a trans-national cooperation Find the best formal and legal framework for a trans-national cooperation Propose a Funding Plan defining joint activities, that gathers the results of the precedent tasks Propose a Funding Plan defining joint activities, that gathers the results of the precedent tasks The 3 tasks of WP3 constitute an adequate way to achieve Goal 2 of NuPNET namely to have the main Funding Agencies in Europe discuss all together and agree on the identification of joint activities based on NuPECC LRP

From Next NuPECC long range plan and ESFRI roadmap to NuPNET List of opportunities for Transnational Funding °°°°°°°°°°°°°°°°°°°°°°°°°°°°°  I. European Gamma tracking Array AGATA  II. The next generation of Radioactive Ion beams facilities ISOL and in Flight Structure,reactions and Nuclear Astrophysics  III. Physics with high intensities stable beams (ECOS)  IV. Structure and dynamics of the nucleon and hadrons electromagnetic and hadronic probes  V. Phase of Nuclear Matter and High-energy Heavy ion collisions  VI. Nuclear theory  VII. Network of local and regional facilities,university groups  VIII Teaching NP in Europe (Network of Universities,EU Schools)  IX Interdisciplinary use of Nucl.Phys facilities biology,medicine, energy,art, environment, etc..) Nuclear data base (AIEA) The ERANET will be an instrument to define the European roadmap of upgrades needed for large infrastructures and instruments,but also for coordinating all others topics NUPNET Agenda

Priorities and possible extension of collaborations Q.6.9: Which of all these international collaborations are most important for your country? Please name not more than 5, if possible ordered by priority. the major international collaborations centre around the "big" existing user facilities (CERN, ECT*, GANIL,GSI, INFN; No. of international users > 100) and the "new" facilities FAIR and SPIRAL 2 as well as AGATA.

WP4-Work organisation: task leaders J. Benlliure Task 4.1: Use of existing co-operation tools task leader : INRNE ( Institute for Nuclear Research and Nuclear Energy, Bulgaria ) Chavdar STOYANOV Task 4.2: Selection of joint activities at transnational level task leader: MICINN ( Ministerio de Ciencia e Innovación, Spain) José BENLLIURE FECYT ( Fundación Española de Ciencia y Tecnología, Spain ) Manuela TURRION Task 4.3: Agreement on one or more pilot transnational activity task leader: MICINN/FECYT Task 4.4: Sustainable action beyond NuPNET task leader: NKTH ( National Office for Research and Technology, Hungary ) Istvan KOCSIS, Zsolt FULOP NuPNET 1 st Governing Council, Madrid 13/10/2008

Objectives Goal 1 of the NuPNET project - as set by the Consortium -  Acquire a mutual and better understanding of the Funding systems of nuclear physics infrastructures and associated equipments in Europe that is needed for future collaborations.  Intensify the communication between administrators in Europe to effectively develop infrastructures of a fully European scope.

Future Meetings 1.Next Co-ordination Committee meeting  CC6:  Date:0ct 12  Place:Frankfurt (NuPECC LRP meeting) 2.Envisaged Governing Council meeting  GC2:  Date:Jan 15  Place:Budapest

Thank you for your attention.

Additional documents

An ERA-Net for Research Infrastructures - Objectives  To step up the cooperation and coordination of national and/or regional programmes/activities towards their mutual opening and implementation of joint activities  To contribute to the development of the European Research Area by improving coherence across Europe of such programmes/activities  To help developing a European policy for research infrastructures Eligible partners are only program owners (National/region/ministries/governments or Research councils and funding agencies managing research programs)

NuPNET Work packages overview  WP1: Management, coordination and communication ( Fr -IN2P3/CNRS) -Overall Management &Coordination of NuPNET (IN2P3-CNRS) Communication and electronic tools (Romania)  WP2: Systematic exchange and networking(DE,GSI) - Systematic exchange of information on funding modalities and administrative procedures (Gr/D) Action Open days - Census of present European Nuclear physics resources (D/Gr/Ro) Action Questionnaire -Links with other bodies in nuclear physics (D) -Integration of new associates (Nl)

NuPNET Work packages overview WP3: Funding action plan (Italy, INFN) - Analysis of current funding of European nuclear research projects and identification of opportunities for NuPNET (I) -Investigation of formal and legal barriers for a future European cooperation (Pol) -Funding Action Plan: Establish common evaluation procedures and standards for common transnational projects for funding infrastructures of nuclear physics (CEA-Fr) WP4 Implementation of trans-national joint activities ( Spain, FECYT) Task 4.1: Use of existing agreements (Bu) Task 4.2: Mechanisms for joint activities at a trans-national level (E/UK) Task 4.3: Test implementation of a coordinated trans-national pilot activity (E)

ESFRI  Launched in April 2002 by Council of Research Ministers  Representatives from the 27 Member + 5 Associated States + one representative of the European Commission (EC) The European Strategy Forum on Research Infrastructures (ESFRI) has been set-up to help facing important challenges

Brussels, 19 October 2006 European Research Infrastructures – The ESFRI roadmap identifies 34 large-scale infrastructure projects