ANNUAL REPORT 2010 Inuit Land Use Licence Number: KVL308C09 INAC Land Use Permit Number: N2008C0026 Submitted to: KIA, INAC, NIRB Prepared by:

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

The Fall Messier Marathon Guide
Water Quality in the Caddo Lake Watershed Caddo Lake Water Quality Cypress Creek Clean Rivers Program.
Jack Jedwab Association for Canadian Studies September 27 th, 2008 Canadian Post Olympic Survey.
Números.
Symantec 2010 Windows 7 Migration Global Results.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
ALAK ROY. Assistant Professor Dept. of CSE NIT Agartala
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Reinforcement Learning
Sequential Logic Design
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
Addition and Subtraction Equations
1 When you see… Find the zeros You think…. 2 To find the zeros...
Western Public Lands Grazing: The Real Costs Explore, enjoy and protect the planet Forest Guardians Jonathan Proctor.
NTDB ® Annual Report 2010 © American College of Surgeons All Rights Reserved Worldwide National Trauma Data Bank 2010 Annual Report.
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Summative Math Test Algebra (28%) Geometry (29%)
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
1 A B C
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
1 IMDS Tutorial Integrated Microarray Database System.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
2.5 Using Linear Models   Month Temp º F 70 º F 75 º F 78 º F.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Select a time to count down from the clock above
WARNING This CD is protected by Copyright Laws. FOR HOME USE ONLY. Unauthorised copying, adaptation, rental, lending, distribution, extraction, charging.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
Presented to: By: Date: Federal Aviation Administration FAA Safety Team FAASafety.gov AMT Awards Program Sun ‘n Fun Bryan Neville, FAASTeam April 21, 2009.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

ANNUAL REPORT 2010 Inuit Land Use Licence Number: KVL308C09 INAC Land Use Permit Number: N2008C0026 Submitted to: KIA, INAC, NIRB Prepared by: Andrew Berry, Vice President of Operations Kivalliq Energy Corporation Submitted on: March 14, TABLE OF CONTENTS Section Page Property Description and Location 4 Corporate Background and Project Description 7 Work Completed To Date 2010 Program 9 Baseline Studies 19 Environmental Considerations 23 Mitigation Measures 27 Waste Management 28 Fuel Inventory 31 Flight Summary 31 Reclamation 33 Socio-Economic Benefits 33 Community Consultation 34 Archaeology and Traditional Knowledge 34 3 Section Page Tables Table 1: 2010 Land Use Permits and Licences 4 Table 2: Wildlife Sightings Summary 24 Table 3: Water Use Summary 26 Table 4: Incineration Summary 29 Table 5: Fuel Cache 30 Table 6: Helicopter Touchdown Summary 32 Figures Figure 1: Angilak Project Location 5 Figure 2: Angilak Project, Land Tenure 6 Figure 3: 2010 Drill Target Locations 13 Figure 4: General Camp Layout 15 Figure 5: Cat Train Route 17 Figure 6: Bio-Physical Baseline Studies 21 Figure 7: Wildlife Monitoring Study Area 22 Appendices 35 Appendix A: 2010 Cat Train Route Coordinates Appendix B: 2010 Water Use Appendix C: 2010 Helicopter Touchdowns Appendix D: 2010 Drill Hole Locations and Drill Site Photos Appendix E: 2010 Contractor Services Appendix F: 2010 Community Consultation Log 4 PROPERTY DESCRIPTION AND LOCATION The Angilak Project property consists of 90 active mineral claims and Inuit Owned Land Parcel RI-30 (IOL), comprising a total area of 90,930 hectares (224,686 acres) in the Kivalliq region of southern Nunavut Territory. The property is located 350 kilometres west of Rankin Inlet and 225 kilometres southsouthwest of Baker Lake (Figure 1), and currently measures 65 kilometres in an east-west direction and approximately 30 kilometres north-south. As indicated on Figure 2, all mineral claims and the IOL are contiguous and extend north, south, east and west between latitudes 62° 26’ and 62°43’ North and longitudes 98° 21’ and 99°24’ West in NTS map areas 65 J/06, 65 J/09, 65 J/10 and 65 J/11 (UTM coordinates: N to N and E to E, NAD83, Zone 14). Land use permits, enabling exploration work to be conducted over the entire property area, have been issued, renewed and amended by the Kivalliq Inuit Association (KIA) for parts of the property covering Inuit Owned Lands (IOL) and by Indian and Northern Affairs Canada (INAC) for Crown lands. Kivalliq Energy Corporation (Kivalliq Energy) also operates under the terms and conditions of a Nunavut Water Board (NWB) licence, covering activities on IOL and Crown Lands was the third year that Kivalliq Energy operated on the lands described in this report and the second year with drill operations. See Table 1 for a list of active permits and licences issued for lands that comprise the Angilak Project. Table / 2011 Land Use Permits and Licences Issuing/Screening Agency Date Issued File Number KIA August 1, 2008 KVL308C09 NIRB July 31, EN052 INAC August 8, 2008 N2008C0026 NWB August 6, BE-ANG0813 FIGURE 1: PROPERTY LOCATION 5 FIGURE 2: LAND TENURE 6 7 CORPORATE BACKGROUND AND GENERAL INFORMATION Following the establishment of a uranium policy by Nunavut Tunngavik Inc. (NTI) in September 2007, Kaminak Corporation (a predecessor to Kivalliq Energy Corporation,“Kivalliq”) signed an exploration agreement with NTI on May 8, 2008 that granted uranium rights to Kaminak on 18,000 acres of Inuit Owned Land (IOL RI-30), located in the Kivalliq District of Nunavut. In discussions with NTI, it was decided cooperatively that Kaminak spin-out all of its uranium interests in Nunavut into a new, uranium exploration and development company called Kivalliq Energy Corporation (KIV: TSX-V). Kivalliq Energy Corporation was specifically formed to focus on projects in Nunavut. Management has extensive background working in Canada’s north. John Robins is Chairman of the Company’s board of directors, Jim Paterson is the Chief Executive Office and Jeff Ward serves as President. Mr. Chris Twells is Chief Financial Officer and Mr. Andrew Berry is Vice President, Operations. Dr. Robert Carpenter, Jim Dawson and Garth Kirkham serve as directors. The group is committed to the social and economic development of the north while maintaining a level of excellence in minimizing environmental impacts. Kivalliq looks forward to conducting a third community tour this year to meet with community members and increase awareness about the company and its projects. Kivalliq was the first company in Canada to have a comprehensive agreement to explore on Inuit Owned Land for uranium. As part of this landmark partnership, NTI receives shares in Kivalliq and can elect to have a participating interest in the project, or collect royalties at a later date. Kivalliq also makes advance royalty payments to NTI annually and commits to specific work programs until The agreement not only applies to privately-held Inuit Owned Land, but also extends to 90 Crown issued claims. The Angilak property totals 225,000 acres in all. Since 1979, the property and surrounding area has been called various names (i.e. LGT, Yathkyed, Lac Cinquante); however going forward, Kivalliq collectively refers to all land holdings as the “Angilak Property”. The Angilak claims and IOL RI-30 are host to over 150 mineral showings and in particular the high-grade Lac Cinquante uranium deposit, On February 7, 2011 the Company received a summary report for Lac Cinquante that describes an Inferred Mineral Resource Estimate of 810,000 tonnes grading 0.79% U 3 O 8, totalling million lbs U 3 O 8 (17.5 lbs U 3 O 8 /tonne) at a 0.2%U 3 O 8 cut-off grade. The Mineral Resource estimate was prepared under the direction of Robert Sim P.Geo., of SIM Geological Inc. A resource model was generated using drill sample assay results from Kivalliq’s 2009 and 2010 field seasons (up to October 31, 2010), and interpretation of a geological model relating to spatial distribution of uranium. For evaluation purposes, three additional metals: silver (g/t), molybdenum (%) and copper (%) were also estimated within the resource 8 model. Lac Cinquante is considered to be an early stage project, therefore little is known about its potential mining or metallurgical characteristics. However, the resource is considered to exhibit reasonable prospects for economic extraction, and the base case cut-off threshold of 0.2% U 3 O 8 is considered appropriate based on its location and other assumptions derived from deposits of similar type and scale. This first compliant mineral resource estimate for the Lac Cinquante uranium deposit represents a major milestone and provides the Company with a strong base from which to build additional uranium resources in WORK COMPLETED TO DATE 2010 Program Exploration work in 2010 included the establishment of the Nutaaq Camp, diamond drilling, prospecting, environmental baseline studies and re-logging/resampling selected core from the historic core storage. Drilling Kivalliq Energy Corporation contracted Major Drilling Group International Inc. to perform diamond drilling on the Angilak Property in Under this contract Kivalliq completed 16,606 metres of diamond drilling in 107 holes from April 24 to October 16, Of these four drill holes tested exploration targets and three holes were lost due to poor drilling conditions. The work was undertaken using two Boyles diamond drill rigs. The first, a Boyles 37 fly rig, was staged on the property from drilling undertaken by Major Drilling in The second, a Boyles 17 fly rig, was mobilized to the property in late July and commenced operations at the beginning of August. A total of 100 drill holes (Figure 3) evaluated the Lac Cinquante uranium deposit in Each of these intersected the stratigraphic graphitic/sulphidic tuff quartz/carbonate vein unit that hosts the mineralized zone referred to as the Lac Cinquante main zone. Anomalous radiation associated with the main zone unit was intersected in 86 of these drill holes. The remaining 14 drill holes were barren of radiation within the main zone stratigraphy. Intersected grades ranged to a maximum of 6.86% U3O8 over a core length of 1.13 metres in DDH 10-LC The widest mineralized intersection was metres grading 0.70% U3O8 in DDH 10-LC-003. Holes were drilled on a 50 metre grid oriented at 26 degrees and targeted to intersect the Lac Cinquante main zone at vertical intervals of approximately 50 metres. Hole inclination angles ranged from -45 degrees to -90 degrees. Down hole termination depths ranged from 47 metres to 302 metres. The Lac Drill rig at 10-NE Cinquante zone was drilled along a strike length of 1350 metres. As a general rule drill holes were terminated approximately 10 metres after intercepting main zone mineralization. Using Portland cement all main zone intercepts running in excess of 0.05% U3O8 were cemented for a distance of at least 10m above and below the radioactive intercept. All drill holes were cemented for a distance of 35 metres from the overburden / bedrock interface. Major Drilling Group designed and installed a drill cuttings containment / collection circuit for Kivalliq Energy. The system utilized a sump pump and a series of four 150 gallon, inline settling tanks. To capture cuttings a small sump area was dug beneath the rig adjacent to the cuttings discharge from the drill casing. It was lined with an impervious liner. A sump pump placed within the sump removed all drill effluents from beneath the rig. The cuttings were pumped into tank one, the first of the four in-line tanks. Overflow from tank one is collected in tank two, from tank two to tank three and from tank three to tank four. A majority of the drill cuttings precipitate were contained in tank one. Incrementally lesser volumes of cuttings precipitated in tanks two and three respectively. Discharge from tank four was essentially clear water. From tank four, clear water can be circulated back through the rig or discharged. All four tanks had a 3” value at their base. Nonradioactive cuttings were released as a slurry from the bottom of each tank through a flexible 3” hose into 1 tonne fibrene bulk bags suspended at ground level from a jig. Excess water was allowed to weep through the weave of the bag material. After approximately 24 hours the dewatered bulk bags with cuttings were flown to a naturally occurring depression/sump where they were deposited. Major Drilling’s Boyles 36 Diamond drill rig and drill cuttings containment circuit. 11 Four (4) inline settling tanks are used to capture and contain all drill cuttings from the drilling process. Drill cuttings from the settling tanks are collected in 1 tonne bulk bags. Kivalliq isolates and collects radioactive cuttings using the cuttings collection circuit described above. The spatial occurrence of radioactive mineralization associated with the Lac Cinquante uranium deposit is predictable. Drilling has indicated that the Lac Cinquante main zone tuff strikes and dips coherently from hole to hole and between drill hole cross sections. Kivalliq geologists notify drill crews of the predicted intercept depth for the Lac Cinquante main zone lithologies when drill holes are spotted and collared. Drilling is temporarily suspended approximately 15 metres above the predicted intercept depth. The cuttings containment circuit is cleaned and all non- radioactive cuttings are 12 removed and collected in bulk bags. Drilling then proceeds to core through the target main zone mineralization. As a rule drill holes are terminated approximately 10 metres below mineralized Lac Cinquante main zone intercepts. Cuttings are provided a settling period while the drill hole is being surveyed and cemented and rods and casing are removed. Clear water is discharged. Radioactive cuttings are collected in 205 litre steel drums and sealed. The sealed drums are temporarily staged on a flat dry outcropping ridge on the east side of the Lac Cinquante drill area at E N Nad 83 z14. Radioactive cuttings contained in seales 205 litre steel drums. Temporarily staged on an outcrop. Drums are flown to the temporary staging area with a vertical drum lifter. Prospecting During the 2010 summer field season, Kivalliq contracted prospectors from Taiga Consultants Ltd. from Calgary, Alberta and Discovery Consultants from Vernon, British Columbia. to undertake a prospecting program targeting historical uranium showings on the Angilak Property. The helicopter‐supported program consisted of four persons and was operational from early July to mid August. A three‐week follow‐up program was conducted during September 2010 with a two man crew. Prospecting crews examined more than 38 mineral showings during the course of the 2010 field season. These have been grouped and narrowed to 9 distinct areas that are considered to hold significant potential for subsurface uranium mineralization. A total of 291 rock samples were collected from outcropping bedrock and boulder exposures during the course of the program. Samples were shipped to SRC in Saskatoon for geochemical analysis. FIGURE 3: 2010 DRILL TARGET LOCATIONS Infrastructure An amendment for the establishment of a new camp on the Angilak property to facilitate easier logistical support and closer access to the Lac Cinquante work area was approved by INAC and NIRB in May 2009 and by NWB in January The new camp, constructed in 2010, is located at m E, mN Nad 83 Z14, see Figure 4 for the general layout of the camp. The general area offers several flat topped gravel deposits formed in association with a large trunk esker trending south approximately 2 kilometres west of the proposed site. The location itself was selected due to several favourable natural attributes amenable to the efficient operation of an aircraft supported exploration facility. The site sits close to water on a dry, flat topped gravel deposit that lies elevated above the surrounding tundra. An adjacent flat topped feature situated immediately north trends several hundred metres and will accommodate ancillary facilities, specifically helicopter landing sites, core racks and fuel storage. A larger flat topped gravel deposit approximately 1.5 kilometres west of the camp site and proximal to the trunk esker serves as an airstrip for light aircraft. The entire camp area is situated directly north of a 1.5 kilometre x 4.1 kilometre long east–west trending lake which can easily accommodate both ski equipped and float equipped aircraft. The lake is currently used as the camp water source. In the future, should the project warrant, the lake is sufficiently long to allow the establishment of an ice strip to accommodate large aircraft. Aircraft commenced shuttling camp equipment and materials to the location of the new camp site on March 21, A four-man camp construction crew contracted from Discovery Mining Services out of Yellowknife NT was mobilized to site on April 4 and began building the camp infrastructure. By the time crews arrived on site commence drilling operations on April 21 the camp comprised twelve individual structures; 1-16’x32’ kitchen, 1-16’x32’ wash tent, 1- 14’x16’ toilet shack, 1-14’x16’ Level II First Aid facility, a 10’x12’ generator shed, 1- 14’X16’ office, 2-14’x16’ core and 4-14’x16’ vinyl Weatherport sleepers. Three additional Weatherport sleepers and a 14’X16’ kitchen overflow were added to the camp in June to support an increase in staff for the summer program. The camp remained open from April through to October. Exploration activities ceased on October 18 and all work crews vacated the camp. A three man crew from Discovery Mining Services was brought to site to winterize the camp and close it for the season. All canvas tent covers were removed from wooden tent frames. All Weatherport vinyl tents were left standing. The camp was shut down on October 27, Cat Train The exploration program was primarily supported by aircraft in During the month of April, as snow conditions allowed, a cat train comprising of two snow cats and eight sleds was utilised to transport bulk cargo from Baker Lake. The route coordinates that the Cat train followed can be found in Appendix A. This is also illustrated in Figure 5. FIGURE 4: 2010 NUTAAQ CAMP LAYOUT Nutaaq Camp constructed in 2010 FIGURE 5: CAT TRAIN ROUTE Cat Train used to haul supplies overland from Baker Lake to Nutaaq Camp. 19 Baseline Studies 2010 In 2010 Kivalliq Energy contracted Hemmera Envirochem Inc. to design and implement baseline studies that corresponded with the stage of current exploration. The studies in 2010 included: Hydrology, Water Quality, Air Quality, and Non-invasive, Observational Wildlife Monitoring. Hydrology The 2010 hydrological work consisted of a desktop study and the establishment of field sites. The goal was to characterize the hydrologic regime of the project area. Watersheds were characterized using digital elevation model (DEM) imagery within the study area. Eight sites were identified for manual measurements (Figure 6). Instantaneous water level and period peak water level were recorded every two weeks from the end of June until the seasonal camp closure in October. This information will for a base for future hydrology studies as the project advances. Water Quality The 2010 water quality program focuses on assessing and quantifying existing water quality conditions across the study area. Twenty sites were sampled (Figure 6) once in August. Water was analyzed for hardness, metals, pH, total suspended solids, ammonia, nitrate, cyanide and alkalinity. Temperature, pH and conductivity were also measured at each of the twenty (20) sites in August and September using a handheld meter. Meteorology On-site meteorological data was collected by a fully automated Onset Hobo Weather Station and an OTT Pluvio Rain Gauge. The weather station was installed in June 2010 (Figure 6). Parameters recorded include; air temperature, relative humidity, total precipitation, barometric pressure, wind speed and direction. Data has been collected since July 2, While camp was operational, manual weather information was also collected to ensure the weather station was functioning properly. Air Quality In the latter part of June 2010, four dust fall stations were established (Figure 6). Dust fall canisters were replaced every thirty (30) days, sealed and sent to the lab for analyses. A total of three rounds of samples were collected. Wildlife The goal of the 2010 wildlife program was to establish an overview of the wildlife species present, and general use of the area. The study area was defined as five (5) kilometre buffer around existing and proposed activity areas. The total 20 area encompassed approximately 169 km2 (Figure 7). Data was collected during two site visits by Hemmera personnel; June 27 to July 3, and August 16 to 21. During the initial visit, Kivalliq Energy staff were trained in documenting wildlife observations. Wildlife data was collected during non-invasive focal behavioural observations and incidental observations. #7 p XW # & G WQ9 WQ8 WQ7 WQ6 WQ5 WQ4 WQ3 WQ2 WQ1 WQ20 WQ18 WQ19 WQ17 WQ16 WQ15 WQ14 WQ13 WQ12 WQ11 WQ10 W4 W3 W2 W1 S1 N2 N1 C1 DF4 DF3 DF2 DF ± Kms 1:45,000 March 2011 Early Stage Bio-Physical Baseline Studies Angilak Project Kivalliq Region, Nunavut N u n a v u t Site Location Legend G Dust Fall Station & Climate Station # Water level station XW Water Quality Station Study Area p Airstrip #7 Nutaaq Camp Approx Drilling Area Watershed Wetland Lake Streams Height Values Yathkyed Lake Nutaaq Lake Kazan River Calpine Lake Big Gash Lake No Gash Lake Siuraq Creek Little Gash Lake Molson Lake Lac Cinquante Figure 6 ! #7 p kj ") !( ! !( &: HOL-C HOL-W HOL-ML1 HOL-ML ± Kms 1:45,000 March 2011 Angilak 2010 Wildlife Program Study Areas, HOL Survey Locations & Carnivore Dens Angilak Project Kivalliq Region, Nunavut N u n a v u t Site Location Nutaaq Lake Kazan R iver Calpine Lake Big Gash Lake No Gash Lake Siuraq Creek Little Gash Lake Molson Lake Lac Cinquante Legend ! Height of Land - Camp !( Height of Land - Molson Lake 1 !( Height of Land - Molson Lake 2 !( Height of Land - Weather &: Grizzly Bear - Spring resting area ") Fox Den kj Inactive Wolf den p Airstrip #7 Nutaaq Camp Approx Drilling Area Wetland Lake Watershed Streams Study Area ! ! Potential Carnivore Denning Habitat Height Values Yathkyed Lake Figure 7 Observed Caribou Migration Direction 23 ENVIRONMENTAL CONSIDERATIONS All employees and contractors working for Kivalliq Energy Corp. are made aware of the company’s internal policies and procedures and are made familiar with the Terms and Conditions of the project’s licences and permits. Every person arriving at the Angilak Project undergoes an orientation which includes information on health, safety and environmental responsibilities and stewardship. The orientation and training includes, but is not be limited to: spill response, bear safety, environmental policies (including waste management), wildlife mitigation measures and the caribou protection measures. Employees, contractors and visitors are asked to review printed materials from the orientation and to sign-off that they have received the orientation, reviewed the information materials and that they understand their individual responsibilities. Wildlife sightings are recorded in the field and at camp. See Table 2 for a summary of these sightings. Sightings are compiled for reporting in each annual report. All employees and contractors are required to populate the wildlife sightings sheets. Wildlife incidents will be reported immediately to the KIA and to the GN Wildlife Biologists. Contact information for emergency situations are hung on the wall of the office and provided on page 5 of the Wildlife Management and Mitigation Plan. Water and aquatic life will be protected. Waterlines for drilling and domestic use are properly placed to minimize disturbance to the shoreline and substrate and will be screened in accordance with the “Freshwater Intake End-of-Pipe Screen Guideline” prepared by the Department of Fisheries and Oceans. A copy of this guideline document is kept at the head office in Vancouver and at the field office at the project. No wastes enter any water bodies. This includes discharge from the camp and seepage from the drill and grey water sumps. The grey water sump will be inspected daily. Drill sumps will be inspected prior to the drill being moved and the area being reclaimed. Daily inspections will be conducted around the camp and a record of these inspections is kept in the office for review by the Inspector upon request while at the camp. Water use was recorded for both the domestic camp water and the water used at the drill. A summary of the water use by month is shown in Table 3. The complete water use data can be found in Appendix B. 24 Table 2. Wildlfe Sightings Summary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able 2. Continued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able 3. Water Use Summary !"#$% &"'()*+), !"#$% &&'(( !"#$% )*+,% -&.'/ 0,1 &2'(/ !34#,5467,1.('8 9:;4 &&'.< 0,1 )*+,% <=8'/ 9:%1./'88 !34#,5467,1 /='/ !:5:>+ /.'(? 9:;4 )*+,% !34#,5467,1 -('? CD+*B4# -&'/= 9:%1 )*+,% 222'2 !34#,54E7,$%1 ('=2 !34#,5467,1.-'. -./.+0"$1' & + )*+,% &?.?'= !34#,5467,1 )*+,% &8.-'. !34#,5467,1 8&'& CD+*B4# )*+,% =.&'? !34#,5467,1 88'/ /&'? ?&?/'/ -./.+0"$1' -(&(E7,$%1E!34#,54 2($113+41)5+61$*7+89* :#; 7<''+?7";71)+61$*7+89*+ 27 Secondary containment and spill kits were established at the main camp fuel cache, all fuelling locations (camp generator, helicopter pad and drill sites) and at every drum behind tents. Regulatory Inspections and Reporting Three regulatory inspections were conducted during the 2010 April to October work program at Angilak: June 24, 2010 WSCC Engineer/Mines Inspector July 18, 2010 INAC Water Resource Officer & District Geologist August 24, 2010 KIA Land Use Inspector There were no deficiencies noted during either of the land use inspections. MITIGATION MEASURES Caribou A one kilometre buffer will be used as a measure of a safe distance for working in areas where caribou are present. If caribou come within one kilometre of any work site, work activities will cease until the caribou have moved safely beyond buffer area. Helicopter flights will maintain a 300 metre altitude whenever possible. In areas where wildlife are observed the helicopter will maintain a minimum of 610 metre altitude. Absolutely no landings will be allowed in areas where caribou are present. Helicopter and aircraft pilots will be instructed that they are not to fly over the caribou calving grounds on their way to or from the project area. Crossings – Between May 15 and September 1, no fuel cache will be established, and no blasting is to occur within 10 kilometres of a “designated caribou crossing”. As well, no drilling is to be conducted within 5 kilometres. Absolutely no activities will act as a block or in any way cause a diversion to migration of caribou. Airborne Geophysical Surveys – Prior to conducting any low-level airborne geophysical surveys the Kivalliq Inuit Association will be contacted and the following information will be provided; dates of surveys, location of surveys, how long the surveys will take to complete. As well, the locally hired wildlife monitors will be required to conduct a survey of the area to ensure that there is no wildlife present and will monitor for wildlife during the survey. If caribou and/or muskox are seen in the area, the geophysical survey will not be flown until they have moved a safe distance (at least 1 km) from the area to be surveyed. A copy of the Caribou Protection Measures is included in Kivalliq’s Wildlife Management and Mitigation Plan. 28 Bear and other Carnivores Known dens will be avoided. Any new dens discovered will be reported to the regional wildlife biologist and the KIA and avoided. I f bears are present in the area, work will cease until the bears have moved safely out of the area. All human-bear interactions will be reported immediately. Breeding and Nesting Birds No eggs or nests are to be disturbed by any activities. If any employee or contractor comes across any active nests, they are to cease all activities immediately to ensure that the nest is not disturbed. Coordinates are to be recorded on the wildlife sighting sheets and these coordinates are to be reported to Environment Canada. Moving or disturbing the nest of a migratory bird is in contravention of the Migratory Birds Convention Act. The peregrine falcon has been identified as species of Special Concern by COSEWIC. If any nests are found, a buffer must be maintained. A 1.5 kilometre buffer is recommended for the peregrine falcon. Any nests discovered will be recorded and the GPS coordinates provided to the applicable regulatory authorities and interested parties. WASTE MANAGEMENT The Nutaaq camp has a Bernadette diesel / electric incinerator installed at the south end of the camp compound, 25 metres south of the camp generator shed. All combustible waste including food waste was incinerated daily. Incinerator ash was collected 205 litre steel drums with locking lids. Filled ash drum are staged at the incinerator until removed from site. All food waste was stored such that it was not accessible to any wildlife prior to incineration. Recyclable plastics and cans were separated as produced and stored in bulk bags for removal from site. Kivalliq Energy has developed a waste management plan for the site which includes incineration guidelines. These guidelines were posted in the generator shed by the incinerator for operator reference. Noncombustible waste was collected in bulk bags for removal from site. To handle sewage waste at the Nutaaq camp, Kivalliq Energy has installed 4 Storburn propane toilets in a latrine building located adjacent to the dry / shower facility. The units employ a boiling process that renders waste to a sterile ash. A vacuum system installed on the exterior of the building is used to remove ash from the units following the incineration cycle. Ash is collected in sealed plastic 205 litre drum staged outside of the building. Total sewage ash volume generated during the course of the 2010 program was approximately 115 litres. Kivalliq Energy is aware that disposal sites in Nunavut communities that service the Angilak project are in regulatory non-compliance and that waste disposal within these communities landfills cannot be authorized. In accordance, all wastes generated by the project including incinerator ash, non- combustible wastes and 29 recyclables produced during the 2010 program on the Angilak property, were airlifted on a regular basis to Yellowknife, Northwest Territories for authorized disposal. This practice will continue until authorized waste disposal in Nunavut communities can be resumed. Kivalliq Energy is registered in Nunavut and has a waste generator number (NUG100036). All waste materials shipped from site are disposed of by KBL Environmental, an authorized disposal service based in Yellowknife. Table 4. Incineration Summary !"#$% &"'()*+,-.* /'01*( !"#$% &$'()*+,-./0*1, 2#$% //839(#4" 6 :4;"3<35*+*#4% 6 =4> &$'()*+ 2#$%3.451 AB 7//839(#4",B DE+* &$'()*+ A6./0*1 FB 2#$%3.451 A 7//839(#4" C :4;"3<35*+*#4%,6 DE%> &$'()*+ 2#$%3.451,B 7//839(#4", :4;"3<35*+*#4% B !E5E1' &$'()*+ GC./0*1,6? 2#$%3.451,C :4;"3<35*+*#4% BF 9*"'*;H*# &$'()*+,,6./0*1 6 2#$%3.451 A 7//839(#4" 6 :4;"3<35*+*#4% A I('/H*# &$'()*+ A,./0*1 6 2#$%3.451 C 7//839(#4" 6 :4;"3<35*+*#4% B J/'4%1 CFF 2#$%3.451 ?6 7//839(#4" B6 :4;"3<35*+*#4% G? /'$ #):#*(2$"(4;<*4 &'002(- 30 FUEL INVENTORY Kivalliq is permitted to cache 200 drums of fuel on the Angilak Property. To accommodate this capacity the company installed a 15’ x 60’ x 18” fuel manufactured by Raymac Industries in British Columbia. The berm is located on the glaciofluvial gravel deposit directly adjacent to the Nutaaq camp. The site offers an ideal smooth, sand covered, flat surface with no hazardous rocks or vegetation to perforate the berm membrane. The berm was lined with Spilfyter RailMat, a 3 ply hydrocarbon absorbent fabric from Pygmalion Environmental. Lengths of dimensional lumber were laid down upon the RailMat liner in a manner to support 4 rows of rolling fuel drums. Within the berm, drums were positioned with bungs at 3 o’clock and 9 o’clock in two rows of two running the full 60’ length of the unit and positioned so that bungs are visible for inspection at all times. To protect the berm from precipitation the entire unit was fitted with a two- piece overlapping sliding cover. The cover slides on and off from either side, over the length of the berm, and is opened as required when drums are inserted or removed. Empty fuel drums are removed from site regularly as backhaul cargo on the Turbo Otter. Empties are returned to Aviation Fuel Enterprises in Baker Lake, an authorized drum distributor, where they are cached to be reused for diesel fuel. On April 23, empties from the 2009 program were loaded onto a Cat Train contracted from SK construction in Baker Lake and returned to Aviation Fuel Enterprises. At commencement of the 2010 program, fuel was cached at two locations on the Angilak property. At the decommissioned Yat camp were 4 drums of jet fuel, 13 drums of diesel, lb propane cylinders and 0.5 drums of low lead gas. At the Nutaaq airstrip were 7 drums of jet fuel. A total of 618 drums of jet fuel, 422 drums of diesel fuel, 7 drums of low lead gasoline and 79 propane cylinders were used over the course of the program 2010 program. At the end of the 2010 program the Nutaaq Camp fuel cache contained 33 drums of jet fuel, 21 drums of diesel and lb propane cylinders. All empties from the 2010 season have been removed from the property. Table 5. Fuel Cache Inventory – Close of Camp October Nutaaq Fuel Cache - Closing Inventory Type Drums /Cylinders Jet B 33 Diesel 21 Propane 11 Coordinates 62 34' 22" N Lat., 98 27' 31" W Long. 31 Raymac 15’ x 60’ Fuel Berm. RailMat 3 Ply hydrocarbon absorbent liner and lumber drum supports. Raymac 15’ x 60’ Fuel Berm with 2 piece sliding cover. FLIGHT SUMMARY Exploration at Angilak relies upon aircraft support. The 2010 program was facilitated by two primary aircraft charter services. Ookpik Aviation Ltd based out of Baker Lake, Nunavut utilizing a Turbo Otter provided regular fixed wing flights from Baker Lake into the Nutaaq camp. With 296 flights from Baker Lake into the Nutaaq camp over the course of the program, the Ookpik Turbo Otter ferried employees, food, supplies, equipment and fuel into site. Between March 21 and June , Ookpik’s Turbo Otter had 75 flights that landed at 62 34’ 10” N. Lat ’ 30” W. Long., on the lake ice approximately 200 metres southwest of the Nutaaq camp facility. Fixed wing schedules into camp were temporarily Secondary containment is used to house the fuel stored on site. 32 suspended for a short break-up period in June. Utilizing the Nutaaq airstrip 1.5 kilometres west of the Nutaaq camp at 62 34' 20" N Lat., 98 29' 10" W Long. fixed wing service to site resumed on June 21. The Ookpik Turbo Otter made an additional 221 flights into camp over course of the program. On occasion Twin Otter aircraft were chartered from Air Tindi Ltd. and Arctic Sunwest Ltd. from Yellowknife, Northwest Territories. These flights were used for logistical support during certain times when increased fixed wing capacity was required to facilitate the program. Specifically Air Tindi provided a Twin Otter to shuttle camp building materials to site during a March 25 to March 28 camp mobilization period. A Twin Otter from Yellowknife was used to airlift fuel from Baker Lake to Nutaaq from May 22 to May 24. A total of 24 flights landed on the lake ice at Nutaaq during during the spring work period. During the period of July 25 to July 27 an Air Tindi Twin Otter on floats landing on lake south of camp was used to shuttle a 2 nd diamond drill from Baker Lake into site. A total of 7 Twin Otter flights on floats landed on the lake at this time. A Bell L4 Long Ranger helicopter contracted from Great Slave Helicopters out of Yellowknife Northwest Territories was used to support Kivalliq’s 2010 exploration program. The helicopter arrived on April 12 and remained on site to the program completion on October 25. The L4 flew a total of hours. A second helicopter an MD 550D was active on site during July and August. This machine flew a total of 95.8 hours. The helicopters flew primarily between three points: the Nutaaq camp, the Lac Cinquante drill site the gravel airstrip, see Table 6. A summary of the helicopter touchdown locations can be found in Appendix C. Table 6. Helicopter Touch Down Summary !"#"$%&'()*+,&-$.*/)01*234$5/ *3,0 :/,77;$<76+ =(-4,-(+ >-(''4 C=.$<76+ B&-D/4*3$E7?& F7?&-$E7?& 9&D7G7D$5(,&4 H&7,0&-$5,7,(*3 H7,&-$576+'(3D$5(,&4$ >/4,I7''$5(,&4 >&3$5/-J&8 K,0&- !"#$% &' ' (( ) ' * ' + ' ' ' ' ',-./ )01 ' )'( ) ' ' + ' + ' ' ' ' 2345/ 67 +* *( * ' ' ' ' + ' ' ' ' 23%./ 0)* & * 0* ' ' ' ' + + ) ) !3839: +7' &' )*6 ++ 0* ' ) ) ' 0 )' ) 0 ) ;5":5<=5#/ +1) (6 )7' 01 0( ' ) ' 7 ' ' ' ' )*( 1) )'0 ' ' ' ' ' )+ ' ( ' ' )+60 00& 6(' &( )'1 * * )& + * ) 33 RECLAMATION Kivalliq Energy Corp. has a policy of progressive reclamation. As work is completed at one site, the area will be cleaned and reclaimed as needed before moving to the next site. Photos will be taken of all sites requiring reclamation and will be submitted to the KIA and INAC in the annual report, see Appendix D. Drill sites will be reclaimed at the completion of each hole, unless due to bad weather or other extenuating circumstances this is not possible. When immediate reclamation is not possible, these sites will be recorded and re-visited later that same field season year or the following year. Kivalliq Energy Corp. will work closely with the KIA, INAC and the NWB to develop alternative and acceptable measures of handling drill cuttings that have a greater than 0.05% uranium concentration. The water licence and land use permit both state that these cuttings are to be placed back down the drill hole. This is not practical given the permafrost conditions in Nunavut. A significant amount of salt would be required to keep these holes open and even then there is no guarantee that this would be sufficient to achieve the intent behind this condition. In the interim, a cutting retrieval system will be used during drill operations. Benign cuttings will be captured and stored in a natural depression as permitted. If uranium concentrations are greater than 0.05%, drill cuttings will be contained and stored in a well-marked location, similar to uranium core storage. SOCIO-ECONOMIC IMPACTS AND BENEFITS Kivalliq Energy Corp. is in the early stages of exploration and evaluation. The company and its management have demonstrated a strong commitment to Nunavut by creating a new company whose focus is to explore the Angilak Project in partnership with the Inuit. By entering into a uranium exploration agreement with NTI, Kivalliq Energy Corp. provides benefits to the Inuit as shareholders in the company, as well as NTI having the option to participate directly in the project at a later date. Kivalliq’s agreement with NTI not only covers Inuit Owned Land, but extends the same benefits to a total 225,000 acres that includes Crown claims held by Kivalliq. Kivalliq Energy Corp. will hire locally whenever possible and will utilize northern businesses and services wherever available. A list of contractors whose services were utilized in 2010 is provided in Appendix E. 34 COMMUNITY CONSULTATION Kivalliq Energy is committed to the north and to northerners. Each year representatives from the company travel to the communities to provide updates and to discuss upcoming programs. The community consultation log is provided in Appendix F. ARCHAEOLOGICAL, TRADITIONAL KNOWLEDGE In 2010 archaeological sites were discovered and reported to the Government of Nunavut and to the KIA. These sites are not in an area of exploration or activity. They will be protected and avoided. In 2011, Kivalliq Energy will work with Points West Heritage Consulting Ltd. to conduct archaeology surveys in areas of planned activity. During all activities, all personnel and contractors are made aware that if any archaeological sites are discovered they are not to be disturbed, the GPS coordinates will be recorded and reported to the Government of Nunavut and the KIA. These sightings will also be reported in the annual report submitted to the KIA and INAC. This is discussed in greater detail in the Wildlife Management and Mitigation Plan that has been previously submitted with the original applications to conduct work. During upcoming community visits, Kivalliq Energy will meet with elders to discuss the work plan and proposed areas of interest. Any information that is shared regarding sites of historical significance, etc., will be incorporated in to the design of the program to ensure that these sites are protected for future generations. 35 APPENDICES Appendix A: 2010 Cat Train Route Coordinates Appendix B: 2010 Water Use Appendix C: 2010 Helicopter Touchdowns Appendix D: 2010 Drill Site Photos Appendix E: 2010 Contractor Services Appendix F: 2010 Community Consultation Log APPENDIX A CAT TRAIN ROUTE COORDINATES Baker Lake to Nutaaq Cat Train Route Coordinates Latitude Longitude Latitude Longitude Decimal Degrees Nad APPENDIX B WATER USE: CAMP & DRILLING Date Time Volume (gal) Volume m3 Employee 16-Apr 10: Discovery 17-Apr 12: Byron 18-Apr 12: Byron 19-Apr 13: Byron 20-Apr 10: Byron 21-Apr 12: Byron 22-Apr 12: Byron 23-Apr 17: Byron 24-Apr 12: Byron 25-Apr 13: Byron 26-Apr 20: Byron 16-Apr 15: Byron 28-Apr 16: Byron 29-Apr 17: Byron 30-Apr 17: Byron 1-May 17: Byron 3-May 16: Byron 4-May 17: Byron 6-May 17: Byron 7-May 16: Byron 9-May 19: Byron 10-May 18: Byron 11-May 20: Byron 13-May 11: Byron 14-May 10: Byron 15-May 14: Byron 16-May 16: Byron 17-May 17: Byron 18-May 14: Byron 19-May 13: Byron 20-May 16: Byron 21-May 15: Byron 22-May 14: Byron 23-May 18: Byron 24-May 18: Byron 25-May 16: Byron 26-May 17: Byron 28-May 14: Byron 30-May 9: Woody 1-Jun 11: Woody 3-Jun 13: Woody 5-Jun 14: Woody 8-Jun 14: Woody 10-Jun 14: Woody 15-Jun 14: Woody 17-Jun 14: Woody 19-Jun 14: Woody 22-Jun 10: Woody 23-Jun 12: Woody 24-Jun 14: Woody 25-Jun 15: Woody 26-Jun 16: Woody 27-Jun 20: Woody Nutaaq Camp Water Use Record Date Time Volume (gal) Volume m3 Employee 28-Jun 10: Woody 29-Jun 9: Woody 30-Jun 9: Woody 1-Jul 9: Woody 1-Jul 19: Woody 2-Jul 8: Woody 2-Jul 17: Woody 3-Jul 8: Woody 3-Jul 16: Woody 4-Jul 8: Woody 4-Jul 19: Woody 5-Jul 13: Woody 6-Jul 9: Woody 6-Jul 19: Woody 7-Jul 12: Woody 8-Jul 13: Woody 9-Jul 17: KM 10-Jul 17: KM 11-Jul 15: KM 12-Jul 17: KM 13-Jul 11: KM 14-Jul 9: KM 14-Jul 20: KM 15-Jul 9: KM 16-Jul 10: KM 17-Jul 10: KM 18-Jul 9: KM 19-Jul 15: KM 20-Jul 17: KM 21-Jul 11: KM 22-Jul 9: Woody 23-Jul 10: Woody 23-Jul 19: Woody 24-Jul 8: Woody 24-Jul 18: Woody 25-Jul 9: Woody 25-Jul 16: Woody 26-Jul 8: Woody 26-Jul 19: Woody 27-Jul 8: Woody 27-Jul 19: Woody 28-Jul 9: Woody 28-Jul 20: Woody 29-Jul 9: Woody 29-Jul 18: Woody 30-Jul 8: Woody 30-Jul 19: Woody 31-Jul 8: Woody 1-Aug 8: Woody 1-Aug 18: Woody 2-Aug 9: Woody 2-Aug 19: Woody 3-Aug 8: Woody 3-Aug 19: Woody Date Time Volume (gal) Volume m3 Employee 4-Aug 7: Woody 4-Aug 19: Woody 5-Aug 8: Woody 5-Aug 19: Woody 6-Aug 18: Woody 7-Aug 7: Woody 8-Aug 7: Woody 9-Aug 13: Woody 10-Aug 16: Woody 11-Aug 16: Woody 12-Aug 17: Woody 13-Aug 14: Woody 14-Aug 16: Woody 15-Aug 9: Woody 15-Aug 17: Woody 16-Aug 16: Woody 17-Aug 18: Woody 18-Aug 18: Woody 19-Aug 17: Woody 20-Aug 17: Woody 21-Aug 17: Woody 22-Aug 18: Woody 23-Aug 18: Woody 24-Aug 8: Woody 24-Aug 18: Woody 25-Aug 8: Woody 25-Aug 18: Woody 26-Aug 17: Woody 27-Aug 18: Woody 28-Aug 8: Woody 28-Aug 18: Woody 29-Aug 16: Woody 30-Aug 16: K. Osmond 31-Aug 14: K. Osmond 1-Sep 10: K. Osmond 2-Sep 9: K. Osmond 3-Sep 8: K. Osmond 4-Sep 9: K. Osmond 5-Sep 8: K. Osmond 6-Sep 10: K. Osmond 7-Sep 7: K. Osmond 8-Sep 8: K. Osmond 9-Sep 7: K. Osmond 10-Sep 9: K. Osmond 11-Sep 8: K. Osmond 12-Sep 9: K. Osmond 13-Sep 10: K. Osmond 14-Sep 8: K. Osmond 15-Sep 9: K. Osmond 16-Sep 8: K. Osmond 17-Sep 12: K. Osmond 18-Sep 9: K. Osmond 19-Sep 8: K. Osmond 20-Sep 10: K. Osmond Date Time Volume (gal) Volume m3 Employee 21-Sep 9: K. Osmond 22-Sep 13: K. Osmond 23-Sep 8: K. Osmond 24-Sep 9: K. Osmond 25-Sep 10: K. Osmond 26-Sep 10: K. Osmond 27-Sep 10: K. Osmond 28-Sep 9: K. Osmond 29-Sep 8: K. Osmond 30-Sep 9: K. Osmond 1-Oct 8: K. Osmond 2-Oct 8: K. Osmond 3-Oct 7: K. Osmond 4-Oct 8: K. Osmond 5-Oct 7: K. Osmond 6-Oct 9: K. Osmond 7-Oct 8: K. Osmond 8-Oct 9: K. Osmond 9-Oct 9: K. Osmond 10-Oct 8: K. Osmond 11-Oct 9: K. Osmond 12-Oct 9: Chad 13-Oct 8: Chad 14-Oct 9: Chad 15-Oct 8: Chad 16-Oct 8: Chad 17-Oct 7: Chad 18-Oct 8: Chad 19-Oct 9: Chad 20-Oct 8: Chad 21-Oct 8: Chad Date Rig 1201 Rig 1224 TOTAL m3/day m3/day m3/day 24-Apr Jun Apr Jun Apr Jun Apr Jun Apr Jun Apr Jun Apr Jun May Jun May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul May Jul Jul Jul Jul Jul Jul nd Rig Starts Jul Jul Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug BREAK UP PERIOD - DRILL SHUT DOWN Angilak Drill Program - Water Use Record Date Rig 1201 Rig 1224 TOTAL m3/day m3/day m3/day 20-Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Aug Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Oct Oct Oct Oct Oct Oct Oct Oct Oct Oct Oct Oct Oct Oct Oct PROGRAM CLOSURE - DRILL RIGS SHUT DOWN APPENDIX C HELICOPTER LOG Date Camp Airstrip Drills Historic Core Shack (Tupiq) Field (prospectors) Other 12-Apr 1 13-Apr 5 14-Apr Apr Apr YAT Camp 17-Apr Apr Apr Apr Apr Apr Apr YAT Camp 24-Apr Apr Baker Lake 26-Apr Apr Apr Apr Apr May May May May Ferguson Lake 5-May Ferguson Lake 6-May May May May May Helicopter Up/Down Log Touchdowns Date Camp Airstrip Drills Historic Core Shack (Tupiq) Field (prospectors) Other 2010 Helicopter Up/Down Log Touchdowns 11-May May May May May May May May May May May May May May May May May May 29-May 30-May 31-May Megabag Sites 1-Jun 2-Jun 3-Jun Jun Jun 6-Jun 7-Jun 8-Jun Date Camp Airstrip Drills Historic Core Shack (Tupiq) Field (prospectors) Other 2010 Helicopter Up/Down Log Touchdowns 9-Jun 10-Jun 11-Jun Megabags 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun Jun Jun Jun Jun Jun Jun Jun Jun Jun Jun Jun Jul Jul Weather station, dustfall stations, dens 3-Jul Weather station, water stations 4-Jul Water stations 5-Jul Jul Jul Date Camp Airstrip Drills Historic Core Shack (Tupiq) Field (prospectors) Other 2010 Helicopter Up/Down Log Touchdowns 8-Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Jul Aug Aug Aug Aug Aug Date Camp Airstrip Drills Historic Core Shack (Tupiq) Field (prospectors) Other 2010 Helicopter Up/Down Log Touchdowns 6-Aug Aug Aug Aug Ferguson Lake 10-Aug Aug Aug Aug Aug Water Stations, 1 - Check out old camp from '70's 15-Aug Aug Aug Weather Station, Dust stations and den search 18-Aug Weather Station, 3 - Water Sampling 19-Aug Weather Station, 3 - Den surveys 20-Aug Aug Aug Baker Lake 23-Aug Aug Aug Aug Aug Aug Aug Aug Aug Sep Sep Sep Date Camp Airstrip Drills Historic Core Shack (Tupiq) Field (prospectors) Other 2010 Helicopter Up/Down Log Touchdowns 4-Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Sep Megabags 18-Sep Sep Sep Sep Sep Sep Megabags 24-Sep Sep Sep Sep Ferguson Lake 28-Sep Sep Sep Oct Oct Water Stations Date Camp Airstrip Drills Historic Core Shack (Tupiq) Field (prospectors) Other 2010 Helicopter Up/Down Log Touchdowns 3-Oct Oct Oct Oct Oct Megabags 8-Oct Oct Oct Oct Oct Megabags 13-Oct Oct Oct Oct Oct Megabags 18-Oct Oct Oct Oct 2 2 APPENDIX D DRILL HOLE LOCATIONS AND DRILL SITE PHOTOS DDH Easting Northing Elev. AZ DIP EOH (m) Section Level Start Finish Surveyed 10-LC E 150m 24-Apr Apr-10 Yes 10-LC E 100m 27-Apr Apr-10 Yes 10-LC E 75m 29-Apr-10 1-May-10 Yes 10-LC E 50m 1-May-10 4-May-10 Yes 10-LC E 50m 5-May-10 7-May-10 Yes 10-LC E 25m 8-May May-10 Yes 10-LC E 75m 10-May May-10 Yes 10-LC E 50m 13-May May-10 Yes 10-LC E 0m 15-May May-10 Yes 10-LC E 50m 18-May May-10 Yes 10-LC E 75m 20-May May-10 Yes 10-LC E 110m 22-May May-10 Yes 10-LC E 125m 24-May May-10 Yes 10-LC E 100m 22-Jun Jun-10 Yes 10-LC E 195m 25-Jun Jun-10 No 10-LC E 195m 27-Jun Jun-10 No 10-LC E 185m 29-Jun-10 2-Jul-10 Yes 10-LC E 150m 2-Jul-10 4-Jul-10 Yes 10-LC E 100m 4-Jul-10 5-Jul-10 Yes 10-LC E 100m 5-Jul-10 6-Jul-10 Yes 10-LC E 50m 7-Jul-10 8-Jul-10 Yes 10-LC E 0m 8-Jul Jul-10 Yes 10-LC E 100m 11-Jul Jul-10 Yes 10-LC E 50m 12-Jul Jul-10 Yes 10-LC E 0m 15-Jul Jul-10 Yes 10-LC E 150m 18-Jul Jul-10 Yes 10-LC E 125m 18-Jul Jul-10 Yes 10-LC E 75m 19-Jul Jul-10 Yes 10-LC E 150m 20-Jul Jul-10 Yes 10-LC E 150m 22-Jul Jul-10 Yes 10-LC E 100m 24-Jul Jul-10 Yes 10-LC E 50m 26-Jul Jul-10 Yes 10-LC E 25m 27-Jul Jul-10 Yes 10-LC E 150m 30-Jul-10 1-Aug-10 Yes 10-LC E 100m 1-Aug-10 3-Aug-10 Yes 10-LC E 70m 3-Aug-10 7-Aug-10 Yes 10-LC E 150m 7-Aug-10 8-Aug-10 Yes 10-LC E 100m 9-Aug Aug-10 Yes 10-LC E 60m 10-Aug Aug-10 Yes 10-LC E 40m 16-Aug Aug-10 Yes 10-LC E 170m 20-Aug Aug-10 Yes 10-LC E 60m 21-Aug Aug-10 Yes 10-LC E 160m 22-Aug Aug-10 Yes 10-LC E 95m 23-Aug Aug-10 Yes 10-LC E 175m 25-Aug Aug-10 Yes 10-LC E 125m 26-Aug Aug-10 Yes 10-LC E 85m 28-Aug Aug-10 Yes 10-LC E 175m 30-Aug Aug-10 Yes 10-LC E 125m 31-Aug-10 1-Sep-10 Yes 10-LC E 175m 30-Jul-10 1-Aug-10 Yes 10-LC E 125m 1-Aug-10 2-Aug-10 Yes 10-LC E 175m 3-Aug-10 4-Aug-10 Yes 10-LC E 150m 4-Aug-10 6-Aug-10 Yes 10-LC E 175m 6-Aug-10 7-Aug-10 Yes 10-LC E 150m 7-Aug-10 8-Aug-10 Yes 10-LC E 75m 8-Aug Aug-10 Yes 10-LC E 50m 10-Aug Aug-10 Yes 10-LC E 100m 13-Aug Aug-10 Yes 10-LC E 100m 16-Aug Aug-10 Yes 2010 Angilak Drill Hole Collar Data and Coordinates (Nad 83 z14) DDH Easting Northing Elev. AZ DIP EOH Section Level Start Finish Surveyed 10-LC E 125m 20-Aug Aug-10 Yes 10-LC E 50m 22-Aug Aug-10 Yes 10-LC E 175m 26-Aug Aug-10 Yes 10-LC E 150m 27-Aug Aug-10 Yes 10-LC E 125m 28-Aug Aug-10 Yes 10-LC E 150m 29-Aug Aug-10 Yes 10-LC E 75m 30-Aug-10 1-Sep-10 Yes 10-LC E 100m 1-Sep-10 2-Sep-10 Yes 10-LC E 50m 3-Sep-10 5-Sep-10 Yes 10-LC E 100m 5-Sep-10 8-Sep-10 Yes 10-LC E 160m 8-Sep-10 9-Sep-10 No 10-LC E 100m 9-Sep Sep-10 No 10-LC E 050m 11-Sep Sep-10 No 10-LC E -050m 14-Sep Sep-10 Yes 10-LC E 192m 17-Sep Sep-10 No 10-LC E 153m 18-Sep Sep-10 No 10-LC E 175m 19-Sep Sep-10 No 10-LC E 075m 20-Sep Sep-10 No 10-LC E 025m 23-Sep Sep-10 No 10-LC E -025m 25-Sep Sep-10 No 10-LC E -035m 30-Sep-10 3-Oct-10 No 10-LC E 170m 2-Sep-10 3-Sep-10 Yes 10-LC E 130m 3-Sep-10 4-Sep-10 Yes 10-LC E 170m 5-Sep-10 6-Sep-10 Yes 10-LC E 125m 6-Sep-10 7-Sep-10 Yes 10-LC E 150m 7-Sep-10 8-Sep-10 Yes 10-LC E 100m 8-Sep-10 9-Sep-10 Yes 10-LC E 150m 10-Sep Sep-10 Yes 10-LC E 100m 11-Sep Sep-10 Yes 10-LC E 050m 12-Sep Sep-10 No 10-LC E 175m 14-Sep Sep-10 No 10-LC E 125m 15-Sep Sep-10 Yes 10-LC E 100m 17-Sep Sep-10 No 10-LC E 50m 19-Sep Sep-10 No 10-LC E LOST 21-Sep Sep-10 No 10-LC E 0m 22-Sep Sep-10 No 10-LC E 025m 25-Sep Sep-10 No 10-LC E LOST 27-Sep Sep-10 No 10-LC E -050m 29-Sep-10 2-Oct-10 No 10-LC E 050m 3-Oct-10 4-Oct-10 No 10-LC E 0m 5-Oct-10 7-Oct-10 No 10-LC E 75m 8-Oct Oct-10 No 10-LC E 25m 10-Oct Oct-10 No 10-LC E 050m 4-Oct-10 6-Oct-10 No 10-LC E 0m 6-Oct-10 9-Oct-10 No 10-LC E -050m 9-Oct Oct-10 No 10-NE N/A N/A 13-Oct Oct-10 No 10-L N/A N/A 13-Oct Oct-10 No Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC-001 UTM 14Z E N April to 26 April LC LC-003 UTM 14Z E N 10-LC-002: April to April LC-003: April to May LC LC-005 UTM 14Z E N 10-LC-004: May to May LC-005: May to May LC LC-007 UTM 14Z E N 10-LC-006: May to May LC-007: May to May Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC-009 UTM 14Z E N 10-LC-008: May to May LC-009: May to May LC LC LC-012 UTM 14Z E N 10-LC-010: May to May LC-011: May to May LC-012: May to May LC LC-014 UTM 14Z E N 10-LC-013: May to May LC-014: June to June LC LC-016 UTM 14Z E N 10-LC-015: June to June LC-016: June to June Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC LC-019 UTM 14Z E N 10-LC-017: June to July LC-018: July to July LC-019: July to July LC LC LC-022 UTM 14Z E N 10-LC-020: July to July LC-021: July to July LC-022: July to July LC LC LC-025 UTM 14Z E N 10-LC-023: July to July LC-024: July to July LC-025: July to July LC LC LC LC-029 UTM 14Z LC-026: July to July LC-027: July to July LC-028: July to July LC-029: July to July Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC LC LC-033 UTM 14Z LC-030: July to July LC-031: July to July LC-032: July to July LC-033: July to July LC LC LC-036 UTM 14Z LC-034: July to August LC-035: August to August LC-036: August to August LC LC LC-039 UTM 14Z LC-037: August to August LC-038: August to August LC-039: August to August LC-040 UTM 14Z August to August Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC LC LC-044 UTM 14Z LC-041: August to August LC-042: August to August LC-043: August to August LC-044: August to August LC LC LC-047 UTM 14Z LC-045: August to August LC-046: August to August LC-047: August to August LC LC-049 UTM 14Z LC-048: August to August LC-049: August to September LC LC LC-050: July to August LC-051: August to August Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC LC-052: August to August LC-053: August to August LC LC-055 UTM 14Z LC-054: August to August LC-055: August to August LC LC-057 UTM 14Z LC-056: August to August LC-057: August to August LC-058 UTM 14Z August to August Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC LC-061 UTM 14Z LC-059: August to August LC-060: August to August LC-061: August to August LC LC LC-064 UTM 14Z LC-062: August to August LC-063: August to August LC-064: August to August LC LC LC-067 UTM 14Z LC-065: August to August LC-066: August to September LC-067: September to September LC LC-069 UTM 14Z LC-068: September to September LC-069: September to September Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC LC LC-073 UTM LC-070: September to September LC-071: September to September LC-072: September to September LC-073: September to September LC LC LC-076 UTM 14Z LC-074: September to September LC-075: September to September LC-076: September to September LC LC LC LC-080 UTM 14Z LC-077: September to September LC-078: September to September LC-079: September to September LC-080: September to October LC LC-082 UTM 14Z LC-081: September to September LC-082: September to September LC LC-084 UTM 14Z LC-083: September to September LC-084: September to September LC LC-086 UTM 14Z LC-085: September to September LC-086: September to September Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC LC-089 UTM 14Z LC-087: September to September LC-088: September to September LC-089: September to September LC LC-091 UTM 14Z LC-090: September to September LC-091: September to September LC LC LC LC-095 UTM 14Z LC-092: September to September LC-093: September to September LC-094: September , Lost September LC-095: September to September LC LC LC-098 UTM 14Z LC-096: September to September LC-097: September , Lost September LC-098: September to October LC LC-100 UTM 14Z LC-099: October to October LC-100: October to October Lac Cinquante 2010 Drill Sites After Drilling Photos 10-LC LC-102 UTM 14Z LC-101: October to October LC-102: October to October LC LC-111 UTM 14Z LC-110: October to October LC-111: October to October LC-112 UTM 14Z October to October NE-001 UTM 14Z October to October L UTM 14Z October to October APPENDIX E CONTRACTOR SERVICES Contractor Services 2010 Baker Lake NU Ookpik Aviation Ltd. Aviation Fuel Enterprises Nunamuit Lodge Northwest Company Inc SK Construction Ltd. BLCS Development Ltd Sanavik Co-op Association Inc. Baker Lake Lodge Arviat NU Padlei Inn Nunavut Arctic College – 5 Graduate hires The Cake Shop I qaluit NU Unaalik Aviation Rankin Inlet NU Kissarvik Co-op Inns M&T Yellowknife NT Discovery/Nunavut Mining Services Air Tindi Great Slave Helicopters/Kivalliq Aviation Aurora Geosciences Medic North Arctic Sunwest Northern Communications Canadian North KBL Environmental ALS Laboratory Group Sub-Arctic Surveys Ltd. Force One Ron’s Auto Service and Equipment Rentals Fuel Flow Logistics Superior Propane Weatherby Trucking Weaver and Devore Trading Ltd True Value Hardware Crother’s Home Building Centre Canadian Tire Staples Business Depot Ltd. BC 1984 Enterprises Inc. Raymac Environmental Services Inc. Sim Geological Inc. Acme Analytical Laboratories Black Mountain Mapping Blender Media Hemmera Envirochem Inc. JDS Energy and Mining Inc. Lockett Consultation Services Inc. J Stritychuk and Associates Western Industrial Distributors Alberta Apex Geoscience Ltd Alara Consultants Grimshaw Trucking Discovery Consultants Taiga Consultants Ltd. InfoSat Communications Globetrotter Travel and Cruise Centre Saskatchewan SRC Geoanalytical Laboratories Manitoba Calm Air Major Drilling Group International Ltd Four Points Sheraton Hotels Ontario Pigmalion Environmental Services Group SGS Canada Inc Mineral Services InfoSat Communications Ranger Survey Systems Quebec First Air APPENDIX F COMMUNITY CONSULTATION LOG