Sponsored by : Organised by Hosted by : Dr Wolfgang Feist UK Passivhaus Tour 2012 30th June - 3rd July 2012.

Slides:



Advertisements
Similar presentations
Laurent Deletombe Master CEE 16/11/10. #) Introduction: Presentation of the problem #) Statement of the global situation: - Energy and environment - French.
Advertisements

London housing © bere: architects. Pelsmakers Sofie © bere: architects.
Sustainability Fire AJ 100 London and South East Practice of the Year 2009 FX Interior Design Practice of the Year 2008.
Private Secondary School Klasika By 9th B Form students 2012/2013 School Year.
Passive house. Definition A Passive house is a buildings with good comfort conditions during winter and summer, without traditional space heating systems.
Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts.
© British Gas Trading Limited 2011 British Gas - ECO Update South East CAN Kelly Greer 5 th September 2012.
THE GREEN DEAL Alan Lupton. THE STORY SO FAR 1996 Introduction of the Home Energy Conservation Act (HECA) – local authorities to report annually on the.
1 Making buildings better Building Tight Chris Knights.
Traditional Construction Locally established actions of construction project organizations.
St. Joseph’s Building Project. Introduction This power point will let you know what is happening with the building project. It goes from the beginning.
Institute of Energy & Sustainable Development De Montfort University
Green Hotel Concepts September 2010.
Building Energy Rating
SECAN,3 rd November What is WARMER STREETS? Green Deal Communities retrofit project delivered by E3 on behalf of the Warmer Streets Partnership.
Tom Dollard Head of Sustainability Pollard SME Builder’s Book Consultation.
Passive Schools Air Temperature
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
A Blood Tribe “Economic Initiative” 100% Owned, Operated and Managed by its’ Members.
Engert, Scheriau, Wimmer SS 2010 Energy and sustainable development, Prof. Schleicher.
What You Need to Know About EPA’s ENERGY STAR Certified Homes Program Learn more at energystar.gov 1.
MODEL HOME 2020_PAA/December2010 SERVICECENTER. MODEL HOME 2020_PAA/December2010 MODEL HOME 2020 VELUX has launched the project Model Home It is.
Sustainable architecture : Green buildings What are they ? ENERGYENVIRONMENT Use renewable energy Prevent loss of energy Use less energy Minimize impact.
Anouchka Poloubinski-Blandin Anastasija Krivonosova Anthony Baptista Luis Fernandes Plains-Wanderer N° 9.
[16469] Low Energy Building Design
EU POLICIES ON ENERGY PERFORMANCE OF BUILDINGS: the role of air tightness and ventilation Users & Stakeholders TightVent Meeting, Brussels 24 MARCH 2011.
NEW HARMONY APARTMENTS DAVIS, CA. NEW HARMONY APARTMENTS OWNER: MUTUAL HOUSING CALIFORNIA TEAM: KUCHMAN ARCHITECTS PC - ARCHITECT BARRISH PELHAM & ASSOCIATES,
Presentation to: COMPANY NAME January 2010 Green Merseyside Sustainability Event Presentation for:
PASSIVE HOUSING By Serena Mehta Passive housing or Passivhaus  “A Passivhaus is a building, for which thermal comfort can be achieved solely by.
The Climate Challenge Matt Dobson Regional Director, Royal Institute of British Architects Opportunities for UK business.
Passive House Seminar for Professionals from the Building Sector
Assignment Current Status Handbook Change proposals – Technical – Installation – Behavioural – Research Project Legal aspects Contents.
Forgebank – Environmental cohousing project Jan Maskell Director of Process Lancaster Cohousing.
DEFECTS PROCEDURE 1 – 5 Robertson Place Yewlands Close Banstead SM7 3DB.
Ben Craig, Operations Director 25 April 2013 DECC Fuel Poverty Project The Delivery Experience.
DER – Before, During and After: A Homeowner’s Perspective.
Passive House Seminar for Professionals from the Building Sector.
Constructing Architect. Water and heating Building Service (BSE) Team 1, A2010.
Science Project Advice on how to reduce energy losses.
1 UK GOVERNMENT’S TIMBER PROCUREMENT POLICY Bob Andrew Department for Environment, Food and Rural Affairs July 2007.
Green Digital Charter Study Tour Welcome to Birmingham November 20, 2015 Heike Schuster-James Program Manager1.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
High Performance Buildings Past, Present and Future Chris Mattock
A STEP TOWARDS A CARBON-NEUTRAL FUTURE
Abdullah Massrhi and Wenyong xiao. Future house Smart house.
Lauren Stencel Chapter 16
What is Passivhaus? by Piers Sadler. EnerPHit Passivhaus Criteria 50Pa 1 ACH EnerPHit Comfort Surface temperature (windows) >17.
Event jointly staged by Sian Pipe Tower Hamlets. TACKLING HARD TO HEAT BUILDINGS BY IMPROVING AIRTIGHTNESS l TOWER HAMLETS l THE ENERGY SAVERS.
Global construction consultants SPENDING WISELY Laurence Brett Partner Davis Langdon LLP.
My Energy Efficient Home. Agenda Planning and design – Site, climate, form and layout Building envelope and element performance – Thermal resistance –
Payback time! 1. Lesson objectives  understand methods to reduce energy loss from the home.  understand how these methods work (the keyfacts).  understand.
By Katrin Klingenberg & Mike Kernagis (Home Power #138)
Case Study – Plummerswood Wayne Butler Gaia Group.
Feedback and post-occupancy data on 20 near Passivhaus retrofits Marion Baeli.
Loft Conversions Bringing you the latest in sprayfoam insulation technology.
WORLD ACCREDITATION DAY PRESENTATION GLOBALIZATION AND THE CONSTRUCTION INDUSTRY IN KENYA Dr. Eng. Siphila W. Mumenya th June 2017.
The Design Team Carl James.
AN-NAJAH NATIONAL UNIVERSITY BUILDING DEPARTMENT
RIBA Plan of Work 2013.
The first certified Passive House in Norway
Pre-Contract Cost Control
Pre-contract Planning and Practice
The Beehive House, Castledine Street, Loughborough
Back Ground Information
SOLAR PANELS SAVING IN YOUR HOME!
The European Union’s programme for India
Passive houses.
BELGIUM COND’OR Batilook.
The Form of Procurement for the EcoHome Project
RIBA Plan of Work 2013.
Presentation transcript:

Sponsored by : Organised by Hosted by : Dr Wolfgang Feist UK Passivhaus Tour th June - 3rd July 2012

Sponsored by : Organised by Hosted by : building & living in a passivhaus Graham Drummond, passivhaus associates Ronnie Hair, tenant

Sponsored by : Organised by Hosted by : 2 bedroom detached bungalow 81 m 2 treated floor area completed October 2011

Sponsored by : Organised by Hosted by : why?

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by : traditional procurement route

Sponsored by : Organised by Hosted by : project team client Graham Drummond, Geum Ltd passivhaus research; phpp; contract & site supervision Graham Drummond, Passivhaus Associates architect & certified passive house designer Chris Morgan, Locate Architects & Passivhaus Associates main contractor W H Brown Construction (Dundee) Ltd

Sponsored by : Organised by Hosted by : quantity surveyor John Duguid Partnership structural engineer Morgan Associates passive house certifier Peter Warm ventilation design Green Building Store project team

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by : biggest challenges insulation windows & doors airtightness mvhr

Sponsored by : Organised by Hosted by : more design details and at tender stage

Sponsored by : Organised by Hosted by : fitting insulation - no gaps!!

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by : windows & doors

Sponsored by : Organised by Hosted by : airtightness

Sponsored by : Organised by Hosted by : pressure test

Sponsored by : Organised by Hosted by : mvhr

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by : stringent, rigorous, demanding attention to detail quality assurance processes quality components but it’s worth the effort…… quality end product

Sponsored by : Organised by Hosted by :

Sponsored by : Organised by Hosted by : …..the lack of draughts is a real bonus: “It’s very comfortable. I think it’s the constancy of the temperature, it just doesn’t vary very much because it is so well insulated.” “You don’t really have to think about it, so it’s really easy to live in.” The Courier & Advertiser 23 May 2012 living in a passivhaus Ronnie Hair, tenant

Sponsored by : Organised by Hosted by : “The thought of living in a house with no heating was a bit unusual to begin with but you soon get used to it. It really shows how good the technology is – and the design.” mid Feb – mid June 2012 (4 month period) 1000kWh all 13.0p per kWh = £ (space heating, hot water, lighting, and all the rest)

thank you