S.P. 8680-165 2011 MnROAD Reconstruction Pre-Letting Conference April 8, 2011.

Slides:



Advertisements
Similar presentations
Signing Plan Design - At Grade Intersections Sample Plan Set
Advertisements

Performance of Exposed Aggregate Surface of Composite Pavements at MnROAD Bernard Izevbekhai Alexandra Akkari Minnesota Department of Transportation International.
Office of Traffic, Safety, and Operations Sample Plan Set Signing Plan Design (At-Grade) June 20, 2012.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Simplify All mixed up Misc. AddingSubtract.
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation 2011 Conaway Conference Structures Update.

1 M-150 / Botts Rd Interchange MoDOT Project No. J4P2251 Pre-Bid Meeting June 24 th, 2010.
PROGRESS REPORT As of September 22, I.Project StatusProject Status II.S-CurveS-Curve III.Revised Construction ScheduleRevised Construction Schedule.
2013 C&MS Pavements Specification Updates Craig Landefeld, P.E. Construction Pavements Engineer.
Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
Univ of Wis - Platteville
Rapid Implementation of Warm Mix Asphalt in Minnesota Tim Clyne MnDOT 16th Annual TERRA Pavement Conference February 9, 2012.
MnDOT Experience with the Integration Process Tim Clyne January 24, 2012 AFK50(2) Subcommittee Meeting.
HB 1048 / SB 518 Adjustments for Local Programs May 13, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Tanya Nash State Materials Office 1.  Asphalt Overview  Asphalt CQC (Specs 334 and 337)  Miscellaneous Information, Specification Changes, and Research.
Construction and Testing of Construction Cycle 2 (CC2) Overlay Murphy Flynn FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center,
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
1 Bonded Concrete Overlay (BCO) Training Module TxDOT Research Project “Performance of Old Concrete Under Thin Overlays” Center for Transportation.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
PIPE CULVERT By CH. VENKATARAMAIAH.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
2013 Concrete Pavement Construction at MnROAD Tom Burnham, P.E. Minnesota Department of Transportation TRB AFD40 Monthly Seminar September 12 th, 2013.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
PAVEMENT REHABILITATION
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
1 PAVEMENT DATA ITEMS. 2 Climate_Shapes (4 LTPP zones) Soil_Shapes Metadata Estimates Section level data HPMS Pavement Data Summary level data.
Ornulv (Arnie) Sonsteby, PE Penn State / FAA Airport Conference 2007
MnDOT Road Research Update Maureen Jensen January 17, 2014.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
PCC Overlays of HMA Pavements
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Batching, Mixing, and Handling. Ordering or Specifying Concrete Alternative (1) Common: When the owner requires the concrete supplier to assume responsibility.
Conventional Pavement Structure inches Graded Aggregate Base inches Asphaltic Concrete Paving Prepared Subgrade stress.
Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
History of Construction Contracting Methods Used at MnROAD Benjamin Worel, MnDOT Tim Clyne, MnDOT 4 th International Conference on Accelerated Pavement.
SESSION 7 Joint Design This session discusses joint design for jointed plain concrete pavements. Historically this is an item that is often ignored or.
I. Advantages of Smooth Pavements: Longer Life Public Opinion Save Fuel Less Surface Maintenance II. Ways to Ensure Smooth Pavements Subgrade and Subbase.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Pavement Analysis and Design
Runway 16L-34R Overlay RFQ Presentation. AGENDA Review of the RFQ Process Overview of the 16L/34R Overlay Overview of Section 4 - Scope of Work Review.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Early Performance of Concrete Pavement Overlays in Minnesota Tom Burnham, P.E. Minnesota Department of Transportation 15 th Annual TERRA Pavement Conference.
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
Michigan Department of Transportation Pavement Demonstration Program Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis.
SESSION 4 Drainage Design Considerations. Objectives  Identify types of subsurface drainage  Determine need for subsurface drainage  Recognize importance.
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
AAR-410 January 14, FAA Airport Pavement Technology Program u National Airport Pavement Test Facility, FAA William J. Hughes Technical Center, Atlantic.
LLP HMA Reclaimed Asphalt Pavement ( RAP) Pre-Bid Meeting District 4 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement Division.
Emergency Landslide Correction Benefits of a Contract Joey Franzino, P.E. INDOT Geotechnical Operations Engineer September 23, 2015.
Full Depth Reclamation
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
Construction and Performance Evaluation of Roller Compacted Concrete under Accelerated Pavement Testing TRB Paper No: Moinul Mahdi Zhong Wu, PhD.,
Rongzong Wu, David Jones and John T. Harvey
Design and Control of Concrete Mixtures CHAPTER 2
General Road Construction Information
CONCRETE PAVEMENTS.
Batching, Mixing, and Handling
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Contract 60X10 Informational Meeting Weber I-55
NRRA Pavement Workshop 2019
2019 Pavement Workshop May 21-23, 2019
2019 Pavement Workshop May 21-23, 2019
ACEC Designer Training
Presentation transcript:

S.P MnROAD Reconstruction Pre-Letting Conference April 8, 2011

Low Volume Road Mainline (I-94) Stockpile Area Secured Area Roadway Closed to Traffic Cell & 6 Cell 63 & 96 Demo Slab (200’) XXXX XXXXX XX

Construction Timeline Construction will begin July 11, 2011 or 8 days after notice to proceed, whichever is later Construction Completion Date is September 1, 2011

Removals Existing Cells “ (2% cross slope) 4“ (2% cross slope) 2" ” 5" 1" PSAB 8" HMA 7.5" cracked '93 PCC (1.5% cross slope) 7.5" '93 PCC (1.5% cross slope) 6" Cl 1 Stab Agg 6" class 5 5+” 12*+” 4” * Subgrade will be excavated to 4% cross slopes.

Grading Work OGAB Special, subgrade cross slope 4%, top of base cross slope 2% –Base material to minimum 6” at centerline. OGAB Special will be continued and day lighted into ditches. Demonstration Slab (Demo Slab)= 6” OGAB Special " 6+" OGAB Special

Instrumentation Days needed for instrumentation (Mn/DOT) after - Excavation completion cell 6 (2 days) - Aggregate Base installed cell 6 (3 days) - Removal of concrete and PASSRC cell 5 (2 days) - Install geotextile fabric cell 5 (2 days)

Concrete Paving – 3 Mixes Cell 505 and 605 Pavement Mix Design shall comply with the following –CA-15 coarse aggregate gradation. Cell 306 Pavement Mix Design shall comply with the following: –CA-35 coarse aggregate gradation. Cell 406 Pavement Mix Design shall comply with the following: –Either a CA-15 or CA-35 coarse aggregate gradation. Cell 505, 605, 306, 406 shoulders, and Demonstration Slab: –Provide Roller Compacted Concrete (RCC) as per specifications.

Finished Textures Cell 306 and 406 – Longitudinal Tining Cell 505 and 605 – Transverse Broom Cell 63 and 96 – Traditional Grind

Demonstration Slab 1.Located in the stockpile area 2.200’ long 3.Same operations as shoulders on cell 6 * 4” RCC Concrete * 6” OGAB Special * Installed at 4% cross slope. 4.Goal for the demo slab * Experience with materials * Experience with RCC placement * Experience with OGAB Special. Demonstration Slab 200' long x 8' wide 4" RCC 6" OGAB Special

Shoulders Cell 505 and 605 –RCC Placed directly on existing materials. –Wick Drains to be installed prior to paving –Cell 505 shoulders will be jointed similarly to mainline –Cell 605 – no joints Cell 306 and 406 –RCC placed on OGAB Special –Cell 306 shoulders will be jointed similarly to mainline. –Cell 406 – no joints

Cell 63 and 96 4” x 5’ x 6’ misc. concrete panel repair in cell 63. Both cells 63 and 96 will receive a traditional concrete grind

Extra Research Quantities Demonstration Slab 4” RCC pavement 8’ x 200’ 6” OGAB special 10’ x 202’ Research Samples 1 cubic yard extra of each concrete mix (3 mixes total) 15 cubic yards extra of OGAB Special

Questions? Melissa K. Cole, P.E. MnROAD Forensic Engineer (651)