MSP and Scoring Rubric T ITLE II, P ART B M ATHEMATICS AND S CIENCE P ARTNERSHIPS (MSP) P ROGRAM M ATHEMATICS S CIENCE T ITLE II, P ART B MSP P ARTNERSHIPS.

Slides:



Advertisements
Similar presentations
Rigorous Science Content and Instructional Practice Ms. Katrina Slone, Knott County Public Schools Dr. Kent Price, Morehead State University GEAR UP Alliance.
Advertisements

[Imagine School at North Port] Oral Exit Report Quality Assurance Review Team School Accreditation.
Consensus Building Infrastructure Developing Implementation Doing & Refining Guiding Principles of RtI Provide working knowledge & understanding of: -
A Guide to Implementation
Implementation of the PA Core Standards. Effective Communication Guiding Principle 1 Design and establish systems of effective communication among stakeholders.
Welcome to College and Career Ready Standards Quarterly Meeting # 1.
U.S. Department of the Interior Bureau of Indian Education Elementary and Secondary Education Act (ESEA) Flexibility Request: Summary of Key Provisions.
The Need To Improve STEM Learning Successful K-12 STEM is essential for scientific discovery, economic growth and functioning democracy Too.
World’s Largest Educational Community
Research and Impact The WaterBotics ® evaluation and research studies include two synergistic, but distinct, domains: educational impact and scale-up/sustainability.
Goals of Title II, Part D of No Child Left Behind The primary goal of this part of NCLB is to improve student academic achievement through the use of technology.
WEBINAR 2 Defining Scientific Research Based Intervention.
Title I Schoolwide Providing the Tools for Change Presented by Education Service Center Region XI February 2008.
COMPREHENSIVE SCHOOL REFORM PROGRAM (Obey-Porter) CSR Program Overview January 2002.
Building & Using an Effective Leadership Team Kathi Cooper Aida Molina Bette Harrison Sandy Lam.
Proposal Writing Workshop Features of Effective Proposals: Fellowship Track Washington, DC January 9, 2014.
Mathematics and Science Partnership Grant Title IIB Information Session April 10, 2006.
Carl D. Perkins Career and Technical Education Improvement Act of 2006.
INSTRUCTIONAL LEADERSHIP FOR DIVERSE LEARNERS Susan Brody Hasazi Katharine S. Furney National Institute of Leadership, Disability, and Students Placed.
1 Professional Development Planning and Needs Assessment Regional Trainings Spring 2006.
TEXAS REGIONAL COLLABORATIVES FOR EXCELLENCE IN SCIENCE AND MATHEMATICS TEACHING MATHEMATICS PROJECT DIRECTORS MEETING February 12, 2008 Debbie Junk-TRC.
Developing School-Based Systems of Support: Ohio’s Integrated Systems Model Y.S.U. March 30, 2006.
Meeting SB 290 District Evaluation Requirements
Aerospace Education Services Project (AESP) William S. Carlsen, Director Pennsylvania State University.
Mathematics/Science Partnerships U.S. Department of Education: New Program Grantees.
ACADEMIC PERFORMANCE AUDIT
New England Regional Colloquium Series “Systems of State Support” B. Keith Speers January 24, 2007.
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
1 Curriculum and Instruction Report Pocantico Hills School February 28, 2005.
Iowa’s Teacher Quality Program. Intent of the General Assembly To create a student achievement and teacher quality program that acknowledges that outstanding.
Title II, Part B Mathematics and Science Partnerships Equitable Services to Private Schools: Program Specifics.
PRESENTED BY THERESA RICHARDS OREGON DEPARTMENT OF EDUCATION AUGUST 2012 Overview of the Oregon Framework for Teacher and Administrator Evaluation and.
Research Indicators for Sustaining and Institutionalizing Change CaMSP Network Meeting April 4 & 5, 2011 Sacramento, CA Mikala L. Rahn, PhD Public Works,
Basic Workshop For Reviewers NQAAC Recognize the developmental engagements Ensure that they operate smoothly and effectively” Ensure that all team members.
Teacher Algebra Network: Our Model for Professional Development in Three Rural North Carolina Counties Presented by Katie J. Mawhinney and Tracie McLemore.
The Improving Teacher Quality State Grants Program California Postsecondary Education Commission California Mathematics & Science Partnership 2011 Spring.
Mathematics and Science Partnerships, Title II, Part B, NCLB.
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
Oregon’s Future Starts Here Superintendents’ vision for turning our good schools into great schools.
After lunch - Mix it up! Arrange your tables so that everyone else seated at your table represents another district. 1.
WHO Global Standards. 5 Key Areas for Global Standards Program graduates Program graduates Program development and revision Program development and revision.
Marjorie Hall Haley, PhD - GMU1 NO CHILD LEFT BEHIND The reauthorized elementary and secondary education act.
Scientifically-Based Research What is scientifically-based research? How do evaluate it?
Distinguished Educator Initiative. 2 Mission Statement The Mission of the Distinguished Educator is to build capacity in school districts to enable students.
Dr. Nancy S. Grasmick July 26,2012.  Maryland is proud to be the top-ranked state in U.S. growth as reported in this study, and judged by Education Week.
Mathematics and Science Partnerships program U.S. Department of Education Regional Conferences February - March, 2006.
1. Administrators will gain a deeper understanding of the connection between arts, engagement, student success, and college and career readiness. 2. Administrators.
Selecting Evidence Based Practices Oregon’s initial attempts to derive a process Implementation Conversations 11/10.
Utilizing Federal IDEA Special Education Funds Permissively to Serve At-Risk Students in General Education The Fiscal Mechanics of RTI and PBS.
Student Growth within the Teacher Professional Growth and Effectiveness System (TPGES) Overview 1.
Evaluating Impacts of MSP Grants Ellen Bobronnikov January 6, 2009 Common Issues and Potential Solutions.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
Course, Curriculum, and Laboratory Improvement (CCLI) Transforming Undergraduate Education in Science, Technology, Engineering and Mathematics PROGRAM.
Single Plan for Student Achievement Cycle Traci Albee, Administrator of State and Federal Programs December 2013.
Professional Development
Mathematics and Science Partnerships Grant RFP Informational Session April 5, 2010.
1 NO CHILD LEFT BEHIND The reauthorized elementary and secondary education act.
ESEA on Teacher Quality Pros Requires licensure, BA/BS, subject area knowledge Provides funding to states for PD Requires annual, measurable objectives.
The Georgia Department of Juvenile Justice Board of Education Presentation May 26, 2011.
UPDATE ON EDUCATOR EVALUATIONS IN MICHIGAN Directors and Representatives of Teacher Education Programs April 22, 2016.
Outcomes for the ESA 6 Regional In-Service “What Works in Schools” Gain an understanding of … Dr. Marzano’s, “What Works in Schools.” the eleven factors.
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction California Mathematics and Science Partnership (CaMSP) Grant.
MSP Summary of First Year Annual Report FY 2004 Projects.
Stimulating Research and Innovation for Preservice Education of STEM Teachers in High-Need Schools W. James Lewis Deputy Assistant Director, Education.
Phyllis Lynch, PhD Director, Instruction, Assessment and Curriculum
English Learners Coordinators Meeting September 12, 2016
ACCJC Standards Adopted june 2014.
Assessing Academic Programs at IPFW
Campus Improvement Planning
NC Mathematics and Science Partnership Program
Presentation transcript:

MSP and Scoring Rubric T ITLE II, P ART B M ATHEMATICS AND S CIENCE P ARTNERSHIPS (MSP) P ROGRAM M ATHEMATICS S CIENCE T ITLE II, P ART B MSP P ARTNERSHIPS P ROGRAM

Program Overview  The Mathematics and Science Partnership (MSP) projects (authorized in ESEA: Title II, Part B [Section ] are intended to enhance the capacity of local teachers to enact curricula reforms that produce higher student achievement in mathematics and science.  A partnership must be composed of a local school district and the science, technology, engineering, and mathematics faculty at a 4 year institution of higher education.

1. To provide activities that are supported by scientifically based research and designed to deepen mathematics and science teachers’ content knowledge and knowledge of how students learn a particular content; 2. To improve the quality and coherence of the learning experiences for teachers through high-quality professional development; 3. To link teachers’ opportunity to learn with opportunity to implement classroom instruction; 4. To promote sustainable relationships between institutions of higher education and K-12 schools that strengthen reform efforts in K-12 education.

5. To focus on the education of mathematics and science teachers as a process that continuously stimulates teachers’ intellectual growth and upgrades teachers’ knowledge and skills. 6. To bring mathematics and science teachers in schools together with scientists, mathematicians, and engineers to increase the subject matter knowledge of those teachers and improve such teachers’ teaching skills through the use of sophisticated tools and work space, computing facilities, libraries, and other resources that institutions of higher education are better able to provide than the K-12 schools.

There are twelve areas in which points are awarded: 1. Abstract (10 points) 2. Comprehensive Needs Assessment (10 points) 3. Evidence-based Research (10 points) 4. Plan of Work (10 points) 5. Alignment with ND Mathematics Content Standards and ND Science Content and Achievement Standards (20 points) 6. Management Capability (10 points) 7. Sustainability (10 points) 8. Partners Contributions and Commitments (10 points) 9. Research, Accountability and Evaluation (10 points) 10. Measurable Goals (20 points) 11. Reporting (10 points) 12. Proposed Budget (20 points) Total Points Possible: 150

The abstract must include a description of: 1. the project’s vision; 2. measurable goals and activities, and key features of the project; and 3. the desired outcome(s)

The needs assessment must include: 1. Evidence of the utilization of the North Dakota State Assessment data. Other data should also be utilized with the NDSA.  This information should contain aggregated and disaggregated information from the specific LEA’s involved in the partnership.

Aggregated data Disaggregated Data

2. The applicant clearly outlined the prioritized needs of the assessment.

 Proposal provided a detailed plan of working inclusive of:  Timeline  Resources utilized  Duration of summer institutes and project  Number of participants involved  Responsibilities of those involved

 There must be a definable link between proposed professional development and applicable state academic standard(s) P ROFESSIONAL D EVELOPMENT S TATE A CADEMIC S TANDARDS

 Grade  Grade  Grade

 Science

 The Next Generation Science Standards were developed through a collaborative, state-led process. These standards emphasize critical thinking and communication skills.  North Dakota has assembled a team of K-12 educators to evaluate the current standards and the possible adoption of the Next Generation Science Standards. For this reason, the NGSS were included in the RFP as a possible source of standards to address in the proposal. These standards can be found at standards-dci. standards-dci

 The proposal clearly demonstrates the team’s capability of managing the project, organizing the work and meeting a deadline.

 The proposal should provide clear evidence on how the project can be sustained beyond the grant period.  How will the impact on teacher content knowledge be sustained?  How will the leadership that is developed through the grant cycle be sustained after the grant has ended?  How does the proposal ensure that the impact on student achievement will be sustained after the grant cycle?

 Documentation of partner agreements are included.  Agreements identify the specific roles of each partner.

 Application provided an evaluation and accountability plan for activities of the project that included specific measurable goals in order to assess the impact of activities.  The proposal demonstrated specific measurable goals focused on increasing the number of STEM teachers who participate in content-based professional development activities.

Evidence-Based Research: Section 9101(37) of ESEA, as amended by NCLB, defines scientifically based research as “research that involves the application of rigorous, systematic, and objective procedures to obtain reliable and valid knowledge relevant to education activities and programs.”

Evidence Based-Research:  Employs systematic, empirical methods that draw on observation or experiment;  Involves rigorous data analyses that are adequate to test the stated hypotheses and justify the general conclusions drawn;  Relies on measurements or observational methods that provide reliable and valid data across evaluators and observers, across multiple measurements and observations, and across studies by the same or different investigators;  Is evaluated using experimental or quasi-experimental designs in which individuals, entities, programs, or activities are assigned to different conditions and with appropriate controls to evaluate the effects of the condition of interest, with a preference for random-assignment experiments, or other designs to the extent that those designs contain within-condition or across-condition controls;

 Ensures that experimental studies are presented in sufficient detail and clarity to allow for replication or, at a minimum, offer the opportunity to build systematically on their findings; and  Has been accepted by a peer-reviewed journal or approved by a panel of independent experts through a comparably rigorous, objective, and scientific review. (Note: practitioner journals or education magazines are not the same as peer-reviewed academic journals).

 Proposal demonstrated specific measurable goals focused on improved student academic achievement.

5 Components of a Measurable Goal 1. Specific – What do you want to measure? 2. Measurable – How will the goal be measured? 3. Attainable – Is it a reachable goal? 4. Results-orientated – How will the goal look when it is reached 5. Time-Bound – what is the timeline for reaching the goal?

 There must be assurances included in the proposal that quarterly financial reports will be made.  There must be assurances that report quarterly on progress related to meeting the specific goals of the project are made.  There must be an assurance that the applicant will provide annual reports to State and DOE

 The estimated funding for all grants combined is $939,071.00

 A detailed budget must be included and must list:  Direct costs  Indirect costs  In-kind contributions  Funding sources  Salaries  Other justifiable program administration costs  Other justifiable items include:  Tuition and book fee waivers  Graduate credits  Registration payments  Per diems  Other justifiable program administration costs

Thank You