PROJECT COMPLETION REPORT JUNE 25, 2008 New Mexico Livestock Board Animal Identification Project.

Slides:



Advertisements
Similar presentations
Swine Identification Update
Advertisements

IDINFO EXPO 2006 Westin Crown Center, Kansas City, MO. National Animal Identification System Cattle Industry Work Group Report John Adams Gary Wilson Members.
Animal Tracking Component Private and State Animal Tracking Databases (ATD) Animal Trace Processing System (ATPS) National Animal Identification System.
Kuali Coeus Award Module Kuali.Colostate.edu
IS2210: Systems Analysis and Systems Design and Change
SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.
Lesson 4 Good Production Practice #4 Identify and Track All Treated Animals.
DoD’s FPDS-NG Training Day Project Overview and Status 20 April 2006 Business Transformation Agency.
Forest Service Incident Business Solutions Team Incident Business Processes for 2006 and Beyond June 1, 2006.
Business Intelligence for Global Accounts Payable in Procter & Gamble Brian Bennings Global Accounts Payable Product Group SAP Business Warehouse Project.
Managing the Information Technology Resource Jerry N. Luftman
Employee Central Presentation
GPS Tracking & Inventory Management GPS Tracking & Inventory Management Presented by: Product Activation Group.
SPAWAR HQ (General Fund) Navy ERP Implementation Lessons Learned – Comptroller View.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
1 Animal Disease Traceability (ADT) April Full Traceability (Pre-harvest) Birth Premises Slaughter Full Traceability All Production and Points.
Greater Yellowstone Area Brucellosis Situation Myles Watts Department of Agricultural Economics and Economics Montana State University November 14, 2008.
© 2013 MPS Partners. All rights reserved. Current Trends in SharePoint Adoption MPS Partners SharePoint Adoption Survey 2012/2013.
May 24, 2011 PeopleSoft Financials 9.0 Review Final Presentation.
Rutgers Integrated Administrative System RIAS Phase III – HRMS, Budgeting, and Enterprise Reporting Treasurer’s Luncheon December 2, 2008.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
© Mahindra Satyam 2009 Project Metrics QMS Training.
Model Bank Testing Accelerators “Ready-to-use” test scenarios to reduce effort, time and money.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
Security Management System for Department Sponsors Session #20244 March 15, 2006 Alliance 2006 Conference Nashville, Tennessee.
DAS: State Controller's Division1January 2010 Department of Administrative Services State Controller’s Division Updated January, 2010.
Instant Enrollment Business Decision. What is Instant Enrollment Instant Enrollment is a WebAdvisor process that allows students to register for continuing.
© 2014 Portland General Electric. All rights reserved. Meeting Consumer Expectations One Payment at a Time October 21 st 2014 Rick VanBeek Kaitlin Pomeroy.
CORE Executive Board March 31, 2010 Next CEB April 28, 2010.
 You may use your organization’s own PowerPoint template  Limit the number of slides to a total of 9  Use the following slides as a template for content.
IT Service Delivery And Support Week Eleven – Auditing Application Control IT Auditing and Cyber Security Spring 2014 Instructor: Liang Yao (MBA MS CIA.
DEPARTMENT OF HOME AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTE 6 MARCH 2012.
Purpose: These slides are for use with customers by the Microsoft Dynamics NAV sales force and partners. How to use: Add these slides to the core customer.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Finding Real World Solutions for Animal ID. NWPP Major Milestones March 2004: Cattle associations visit with Bill Hawks and Keith Collins of the USDA.
GIS Application for the Delaware Radiological Emergency Preparedness Program Dan Rose – Delaware Emergency Management Agency Steve Stasolla – SRC Consulting.
Project Life Cycle.
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
Overview & High Level Plan Date: Team: Todd Kaywood, Alex Wiechers, Andy Idema.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
MRAM November 8, 2012 Financial Systems Update Jeanne Marie Isola, UW-IT Information Management.
TEAM Enhancements 2003 Project Work Plan. Application Enhancements Ten application enhancements were selected as the most critical for completion in FY.
UCSF HR: HUMAN RESOURCES AND ACADEMIC SYSTEMS REPORT TO CBT June 8, 2012.
Presented by Team B Overview of Inventory System for Chocolate Café By John Leonard, Jamal Matthews, Sandra McMahon.
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
11 i Upgrade: Is an Assessment Useful for Your Company? By: Bernard Doyle, Applications Software Technology Corp. Marie Klein, Information Resources Inc.
Safeguarding Animal Health 1 USDA APHIS Authorities and Activities Under the National Animal Identification System Advisory Committee on Biotechnology.
th Annual PABUG Conference Driving Revenue and Efficiency Through Automated Procure to Pay Stephen G. Mack, CPSM, C.P.M. Associate Vice President.
An end-to-end eProcurement system providing powerful automation and workflow functionality to help you reduce costs and increase value.
Incident Based Automation Project Update Logistics Meeting March 16, 2005.
Project Management Processes for a Project
BUDGET PRESENTATION TO THE PORTFOLIO COMMITTEE ON HOME AFFAIRS 09 March 2010.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
MyFloridaMarketPlace Quality Improvement Plan. Page 2 MFMP Quality Improvement Plan  The MFMP team has developed a quality improvement plan that addresses.
HIPAA Yesterday, Today and Tomorrow? Dianne S. Faup Office of HIPAA Standards Centers for Medicare & Medicaid Services.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Cut down on the time it takes employees to process invoices using Square 9’s SmartSearch integration with Microsoft Dynamics GP. SmartSearch allows invoice.
4.4 Monitor and Control Project Work
City-wide LED Street Light Conversion Program
Wide Area Workflow (WAWF) Overview
Adopting a patient pre-registration process
Claire McKinley, PMP, CCRP
Certification Phase: Closeout Agency Head: Maggie Toulouse Oliver
Adopting a patient pre-registration process
Department of Licensing HP 3000 Replatforming Project Closeout Report
Presentation to Project Certification Committee, DoIT August 24, 2008
September 27, 2017 Initiation Request
Executive Sponsor: Tom Church, Cabinet Secretary
Office of the New Mexico Secretary of State Business Filing System – Project Closeout Presented to the DoIT Project Certification Committee November.
Presentation transcript:

PROJECT COMPLETION REPORT JUNE 25, 2008 New Mexico Livestock Board Animal Identification Project

New Mexico Livestock Board: Project Team Myles Culbertson Sam Wilson Dorothy Martinez Ron Hofius Julie Gauman

Project Objectives Replace paper system for inspecting livestock transactions. Provide capability to trace livestock source, movement, and herd intermingling for prevention of disease spread. Meet USDA requirements for Premises Registration and individual animal ID, including electronic (RFID). Automate integration between billing/collections activity and back-end accounting systems.

Project Scope Automate the livestock inspections performed by approximately 70 inspectors distributed over the entire state of New Mexico. Develop a data repository for interface with USDA and other partners, and to integrate with SHARE.

Budget vs. Actual Overall project budget: $ Overall Project Actual: $899,557 Overall Holdback: $(31,246)

Performance against Objectives System is in place. Paper systems have been replaced by electronic system populating an in-house data repository. Integration with SHARE is in place. Daily SHARE queries are imported into system. System outputs SHARE Journal Entry information. Livestock movement data is captured at the herd/brand level including GPS coordinate information. This lays a strong foundation for animal traceback. Additional in-house efforts continue toward this objective. Premises registration, disease testing (including individual animal RFID information), and the development of a USDA certified Animal Tracking Database are ongoing in-house efforts now at the NMLB, and integrate with and rely upon this project.

Impact on DoIT Infrastructure Users work locally on their Toughbooks and sync small amounts of text-based data, mostly in the evenings from home. NMLB has hired two FTE to support and continue the development of related systems. NMLB has its own data center housing these systems, but may request services from DoIT to provide off site data backup.

Challenges / Lessons Learned Initial project was planned without I.T. staff. Given the scope, we should have anticipated the need for I.T. Personnel from the beginning. Vendor went out of business before a final set of features / bug-fixes could be implemented. Completed key features in-house, particularly integration with SHARE and our preexisting in-house brand database. Project began prior to NMLB being incorporated in to state vouchering system. Vendor relationship was strained when our procurement rules changed and we had difficulty paying them or moving forward with planned enhancements. This was solved by increased use of in-house personnel and Save Smart vendors.

New Mexico Livestock Board Thank You