1 E-waste International Context Presentation ProblemProblem SolutionSolution Basel Convention ResponseBasel Convention Response –MPPI –Declaración Ministerial.

Slides:



Advertisements
Similar presentations
Moving the ethical hiring of health workers forward
Advertisements

A Guide to Localizing the Hyogo Framework for Action
1 1 David Piper, UNEP DTIE Chemicals Branch 2nd Global Forum on ASGM Lima, Peru 3 to 5 September 2013 ASGM IN THE MINAMATA CONVENTION ON MERCURY …to protect.
Special Multilateral Fund of the Inter-American Council for Integral Development – FEMCIDI Inter-American Committee of Education - CIE.
PRESENTATION AT THE WORKSHOP ON LDC PRIORITY NEEDS FOR TECHNICAL AND FINANCIAL COOPERATION 29 OCTOBER 2009 GENEVA Sari Laaksonen Coordinator, Integrated.
1 The new ESF Investing in your Future -
The Implementation Structure DG AGRI, October 2005
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
1 Measuring ICT4D: ITUs Focus on Household and Individual Market, Economics & Finance Unit Telecommunication Development Bureau.
United Nations Environment Programme (UNEP) Secretariat of the Basel Convention (SBC) POPs wastes related projects and capacity building activities coordinated.
Resource Mobilization Capacity Building OEWG – SIDE EVENT 7 April, 2006.
Inaugural Discussions on the Global Programme on Sustainable Ship Recycling Dhaka, Bangladesh – 12 January 2008 Donata Rugarabamu Secretariat of the Basel.
Overview of the Basel Convention and Basel Protocol: History and Goals Ms. Donata Rugarabamu Senior Legal Officer Secretariat of the Basel Convention Regional.
Introduction to the Global Programme Concept Susan Wingfield Consultant to SBC 13 th January, Dhaka.
Preparatory Discussions on Promoting Ship Recycling through the Global Programme Dhaka, 13 January 2008 Developments in Europe: The European Commissions.
Secretariat of the Basel Convention Side event COP 2 Stockholm Convention : Implementation of projects related to POPs wastes through the Basel Convention.
Overview of the Basel Convention and Basel Protocol: History and Goals Laura Thompson Legal Expert Secretariat of the Basel Convention Regional Workshop.
Global Digital Solidarity Funds Reuse and e-waste Programs by Cissé KANE Projects Manager, Head, E-waste and Reuse Programs, DSF E-waste Africa project.
Programme Priorities of the Basel Convention Secretariat Basel Convention Resource Mobilization Workshop Nairobi, 3 – 7 December 2006 Andreas Arlt Secretariat.
INDONESIAN-SWISS CLIExpanded Bureau of the Basel Convention, 24 June 2009 First Meeting of the First Meeting of the Indonesian-Swiss Country-led Initiative.
FOENSwiss Federal Office for the Environment Regional Workshop aimed at Identifying the problems faced by countries in the Central and Eastern European.
United Nations Environment Programme (UNEP) Secretariat of the Basel Convention (SBC) Enhancing cooperation between the Basel Convention and the Stockholm.
Project design, preparation and approval Basel Convention Resource Mobilization Workshop Nairobi, 3 – 7 December 2006 Andreas Arlt Secretariat of the Basel.
Project Proposal Summary
IDENTIFYING CRITICAL ISSUES Session B1. 2. Party responsibilities w.r.t. Basel Establish appropriate institutional & legal framework; Prepare appropriate.
The Basel Convention as an instrument for moving towards Zero Waste? Dr. Katharina Kummer Peiry Executive Secretary Secretariat of the Basel Convention/UNEP.
The Basel Convention and its application to ship recycling
THE BASEL, ROTTERDAM AND STOCKHOLM CONVENTIONS Geneva, 30 September 2009 Basel ConventionRotterdam ConventionStockholm Convention.
1 Partnerships Mobile Phone Partnership Initiative Example Partnerships Mobile Phone Partnership Initiative Example PresentationBackground MPPI Partners.
Basel Convention Regional Centres Handbook By Nelson Sabogal.
THE TECHNICAL GUIDELINES FOR ESM OF E-WASTE UNDER BCRC-SEA D. W ARDHANA H ASANUDDIN S URAADININGRAT Former Senior Technical Advisor, BCRC-SEA Side Event,
Ross Bartley Environmental & Technical Director Bureau of International Recycling (BIR)
1 WSSD Global Partnership for Capacity Building to Implement the Globally Harmonized System of Chemical Classification and Labelling Objectives, Targets.
E Waste Management – Uganda’s Journey
European Clearing-House Mechanism Portal Toolkit Expert Group Meeting
DRAFT DECISIONS. Governance and Strenghtening of the Forum Disseminate broadly the decisions adopted by the Forum of Ministers, in the relevant instances.
A Presentation by UNEP At the UNFCCC Workshop on the Adaptation Fund Fairmont Hotel Macdonald Edmonton, Alberta, Canada 3—5 May 2006.
The way we work – Issues and Options. SUSTAINABILITY: PRACTICE CHANGE EVIDENCE UNDERSTAND PROBLEMS AND OPPORTUNITIES TOOLS GUIDANCE (RULES) INCENTIVES.
P ROF. M OSTAFA H. K AMEL Director, BCRC-Egypt (BCRC-Egypt) Regional Centre for Training and Technology Transfer for Arab States in.
UNEP’s Training resources on E-waste
TRP Chapter Chapter 1.1 Introduction. TRP Chapter Why raise hazardous waste management standards? To reduce risks of inadequate controls on.
Kampala, Uganda, 23 June 2014 E-Waste Management in Uganda Michael Ocero, Acting Commissioner – IT Dept. Ministry of ICT ITU Regional.
E-Waste Management Policy and Strategy in Uganda
Session 5: How to turn an E-Waste Challenge into an Opportunity: Guidance Developed under the Basel Convention ITU Workshop on Moving to a Green Economy.
Overview of UNITAR/ILO GHS Capacity Building Programme in ASEAN UNITAR/ILO Global GHS Capacity Building Programme.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
E-waste and the Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and their Disposal ITU Symposium on ICTs, the Environment.
What is the NEPAD? It is a vision and strategic framework for Africa’s renewal. It has eight sectoral priorities, namely:  Infrastructure (ICTs, Energy,
ENHANCING SYNERGIES AMONG THE BASEL, ROTTERDAM AND STOCKHOLM CONVENTIONS Tirana, Albania, June 2010 Basel ConventionRotterdam ConventionStockholm.
1 Jordan Institution for Standards and Metrology Our Vision A pioneer and distinguished institution nationally, regionally, and internationally in the.
1 Basel Convention on the Control of Transboundary Movement of Hazardous Wastes and Their Disposal Brief background The Convention Implementation actors.
1 Strategic Approach to International Chemicals Management (SAICM) SAICM Secretariat.
WIPO Patent Landscapes and the E-Waste Recycling Report Geneva 11 May 2015 Irene Kitsara IP Information Officer, Access to Information and Knowledge Division.
Mercury Waste: Synergies with the Basel Convention Ibrahim Shafii Secretariat of the Basel Convention.
5 th ITU Green Standards Week Nassau, The Bahamas December 2015 Standards, Guidelines and Best Practices Applicable to the Environmentally Sound.
1 Stockholm Convention on Persistent Organic Pollutants Clearing-house Mechanism for Information on POPs. Role of Regional Centres.
Guidelines for the development of national waste management strategies Supporting the implementation of Basel and Stockholm Conventions: update on waste.
WHERE DOES AFRICA STAND ON THE GLOBAL E-WASTE ISSUE? Side event at Basel/COP Regional Centers Fair Organized by BCCC-Africa/BCRCs in Egypt, Senegal and.
Towards building effective partnerships for sustainable management of E-waste WSIS forum 2016 Francesca Cenni Programme Officer Secretariat of the Basel,
Secretariat of the Stockholm Convention Getting ready for COP-4.
ASSESSING POSSIBLE INCENTIVES TO ENCOURAGE THE PRIVATE SECTOR TO INVEST IN ENVIRONMENTALLY SOUND MANAGEMENT Dr. Leila Devia, BCRC Argentina Ross Bartley,
Preparing a National Profile to Assess the National Infrastructure for Management of Chemicals Chemicals and Waste Management Programme United Nations.
Workshop on E-waste Recycling and Refurbishing: Environmentally Sound Management Practices Guidance Supporting Environmentally Sound Management (ESM)
Social Protection Global Technical Team Retreat,
BCRC –EGYPT: ROLE AND ACHIEVEMENT
Mobile Phone Partnership Initiative (MPPI)
Basel Convention: Projects and Activities Related to E-waste
ESM of Biomedical and Infectious Wastes Under the Basel Convention
Experiences of the projects on used oils
The Basel Convention as an instrument for moving towards Zero Waste?
Presentation transcript:

1 E-waste International Context Presentation ProblemProblem SolutionSolution Basel Convention ResponseBasel Convention Response –MPPI –Declaración Ministerial de Basilea –PACE Miguel Araujo Co-chair PACE Project Group 4.1 Director of BCRC-CAM Interactive Facilitation Meeting on E-waste WSIS Forum May 11, 2010, Geneva, Switzerland

2 E-waste International Context I Problem Electronic waste is the fastest growing portion of the municipal solid waste stream.Electronic waste is the fastest growing portion of the municipal solid waste stream. Volume of obsolete PCs generated in developing regions will exceed that of developed regions by 2016 – 2018.Volume of obsolete PCs generated in developing regions will exceed that of developed regions by 2016 – E-waste contains hazardous substances as well as precious materials.E-waste contains hazardous substances as well as precious materials. Absence of infrastructure and facilities for ESM, hence use of crude management methods.Absence of infrastructure and facilities for ESM, hence use of crude management methods. WSIS Forum May

3 E-waste International Context I Problem (continued) No effective take back schemes for end of life EEE.No effective take back schemes for end of life EEE. Uncontrolled dumping of obsolete e-products and material recovery processes without protective measures in the informal sector has caused:Uncontrolled dumping of obsolete e-products and material recovery processes without protective measures in the informal sector has caused: environmental pollution environmental pollution millions of people exposed to toxins, such as dioxins and brominated flame retardants in plastics. millions of people exposed to toxins, such as dioxins and brominated flame retardants in plastics. WSIS Forum May

4 E-waste International Context II Solution The technology for environmentally sound dismantling and disposal of e-waste exists, but:The technology for environmentally sound dismantling and disposal of e-waste exists, but: it needs to be transferred to developing countries. it needs to be transferred to developing countries. it has to be linked to the product life-cycle to become economically viable. it has to be linked to the product life-cycle to become economically viable. Efforts to bridge the digital divide need to follow the life-cycle approach to avoid problems for the health of workers and the general public, as well to the environment.Efforts to bridge the digital divide need to follow the life-cycle approach to avoid problems for the health of workers and the general public, as well to the environment. WSIS Forum May

5 E-waste International Context III The Basel Convention Response: MPPI E-waste raised as a key issue at COP6 in 2002E-waste raised as a key issue at COP6 in 2002 In 2002 Mobile Phone Partnership Initiative (MPPI) was established for the environmentally sound management of used and end-of-life mobile telephones (12 manufacturers + later three telecom operators).In 2002 Mobile Phone Partnership Initiative (MPPI) was established for the environmentally sound management of used and end-of-life mobile telephones (12 manufacturers + later three telecom operators). Five technical guidelines were prepared and tested:Five technical guidelines were prepared and tested: awareness raising on design considerations; awareness raising on design considerations; collection of used and end-of life mobile phones; collection of used and end-of life mobile phones; transboundary movement of collected mobile phones; transboundary movement of collected mobile phones; refurbishment of used mobile phones; refurbishment of used mobile phones; material recovery/recycling of end-of-life mobile phones material recovery/recycling of end-of-life mobile phones Overall Guidance document approved at COP 9.Overall Guidance document approved at COP 9. WSIS Forum May

6 E-waste International Context III The Basel Convention Response: The Nairobi Declaration Nairobi Declaration at COP8 in 2006 declared that the Basel Convention is the main global instrument for guiding the environmentally sound management of hazardous e- waste and highlighted the importance of partnership with the private sector and non governmental organizations.Nairobi Declaration at COP8 in 2006 declared that the Basel Convention is the main global instrument for guiding the environmentally sound management of hazardous e- waste and highlighted the importance of partnership with the private sector and non governmental organizations. SBC launched pilot projects and partnerships in cooperation with Parties, BCRCs and other partners.SBC launched pilot projects and partnerships in cooperation with Parties, BCRCs and other partners. WSIS Forum May

7 E-waste International Context III The Basel Convention Response: PACE At COP 9 Partnership for Action on Computing Equipment (PACE) was launched, animated by the success of MPPI but aware of its shortcomings. At COP 9 Partnership for Action on Computing Equipment (PACE) was launched, animated by the success of MPPI but aware of its shortcomings. WSIS Forum May

8PACE Mission Statement To increase environmentally sound management of used and end-of- life computing equipment,, taking into account social responsibility, the concept of sustainable development and promoting information sharing on life cycle thinking. Scope The scope of the partnership will cover: Personal Computers (PCs) and associated displays, printers and peripherals* * Personal desk top computer, including the central processing unit and all other parts contained in the computer. Personal notebook and laptop computer, including the docking station, central processing unit and all other parts contained in the computer. Computer monitor, including the following types of computer monitor:(a) cathode ray tube;(b) liquid crystal display;(c) plasma. Computer keyboard, mouse, and cables. Computer printer:(a) including the following types of computer printer:(i) dot matrix;(ii) ink jet; (iii) laser;(iv) thermal; and (b) including any computer printer with scanning or facsimile capabilities, or both. WSIS Forum May

9PACE Working Principles In addition, PACE agreed to the following three working principles: 1.Promote dialogue amongst governments, industries, NGOs and academia on initiatives that could be carried out in different UN regions. 2.Seek innovative solutions, showing concrete and practical results consistent with the Basel Convention, and make recommendations. 3.Coordination and cooperation, as appropriate, with other bodies involved in e-waste activities. WSIS Forum May

10PACE Activities Develop tools (inter alia guidelines) and activities on environmentally sound refurbishment/repair, including criteria for testing, certification, and labelling. Develop tools (inter alia guidelines) and activities on environmentally sound recycling and material recovery, including facility certification. Develop and promote pilot schemes for environmentally sound management of used and end-of-life computing equipment towards the attainment of Millennium Development Goals. Develop awareness raising and training program activities. WSIS Forum May

PACE Membership 11  27 Parties and Signatories to the Basel Convention.  9 Basel Convention Regional Centres for Training and Technology Transfer (BCRCs).  5 Research and Academic Institutions, and other UN Bodies.  16 NGOs, Industry, and Industry Associations. WSIS Forum May

PACE - Working Structure 12 OEWG PACE Working Group Ad Interim Project Group on ESM Criteria Project Group 1.1 Project Group 2.1 Project Group 3.1 Report with Recommen- dations on ESM Criteria Guideline on Repair and Refurbishment of Used Computing Equipment Guideline on Material Recovery and Recycling of End-of-Life Computing Equipment Pilot Schemes on Collection and Management of Computing Equipment from Informal Sectors Level 1 Group Level 2 Groups Project Group 4.1 Awareness Raising and Training Products WSIS Forum May

Working Group Tasks Operational: Operational: –oversee the execution of the Work Plan for PACE; –set priorities based on the work programme; –oversee activities of project groups, and plays an active role in conflict resolution; –review and approve work products and reports prepared by project groups. Administrative: Administrative: –ensure timely implementation of the work plan by project groups; –coordinate activities within the Partnership; –liaise with the Secretariat; –receive and consider requests for membership in the Partnership. Financial: Financial: –prepare appropriate and sustainable financial arrangements for the Partnership; –prepare documents on memberships, contributions, and sliding scales; –liaise with the Secretariat to provide financial reports. 13WSIS Forum May

Future Plans 14 Guidelines Guidelines Report on ESM Criteria recommendations are to be implemented. Report on ESM Criteria recommendations are to be implemented. Two Guidelines (repair and refurbishment; and material recovery and recycling) to be approved and adopted by the PACE Working Group. Two Guidelines (repair and refurbishment; and material recovery and recycling) to be approved and adopted by the PACE Working Group. Guidelines to be evaluated in the facility type environment. Guidelines to be evaluated in the facility type environment. Overall Guidance Document will be prepared for COP 10: Overall Guidance Document will be prepared for COP 10:  Executive summaries from all guidelines and report on ESM criteria.  Recommendations from all guidelines and report on ESM criteria. Implementation by BCRCs, Parties, Signatories, Industry and NGOs Implementation by BCRCs, Parties, Signatories, Industry and NGOs Pilot Projects Pilot Projects Waste surveys, based on 9 high ranked proposals, in all regions implemented, as per TOR. Waste surveys, based on 9 high ranked proposals, in all regions implemented, as per TOR. Project Management Teams (PMTs) to be established, as per TOR. Project Management Teams (PMTs) to be established, as per TOR. Based on survey results, 2-4 countries to be selected for pilot projects, as per TOR. Based on survey results, 2-4 countries to be selected for pilot projects, as per TOR. Recommendations from pilot projects to be implemented in other centers in the country and regions. Recommendations from pilot projects to be implemented in other centers in the country and regions. WSIS Forum May

Future Plans (cont.) Awareness Raising & Training Awareness raising products on PACE developed for the COP 10 meeting. Awareness raising products on PACE developed for the COP 10 meeting. High priority awareness raising and training products implemented. High priority awareness raising and training products implemented. At least one workshop on PACE in each UN region organized by BCRCs. At least one workshop on PACE in each UN region organized by BCRCs. CD/DVD with training material. CD/DVD with training material. E-learning course on technical guidelines E-learning course on technical guidelines Identity logo for PACE developed. Identity logo for PACE developed. Resource Mobilization and Financial Sustainability Sub-group under Project Group 3.1 established. Sub-group under Project Group 3.1 established. Develop macro funding for projects in developing countries and countries with economies in transition beyond the pilot project stage. Develop macro funding for projects in developing countries and countries with economies in transition beyond the pilot project stage. Develop strategy for long term financial sustainability of projects under Project Group 3.1. Develop strategy for long term financial sustainability of projects under Project Group 3.1. Identify public and private fund raising initiatives, and provide guidance to the Project Group 3.1 and Project Management Teams (PMTs) on financial issues. Identify public and private fund raising initiatives, and provide guidance to the Project Group 3.1 and Project Management Teams (PMTs) on financial issues. WSIS Forum May

FOR MORE INFORMATION ON PACE Please visit the Secretariat of the Basel Convention (SBC) Website at: Please visit the Secretariat of the Basel Convention (SBC) Website at: OEWG 7 Side Event: May 10, 2010