ASAS-TN ASAS-TN - what’s in it for easyJet? presented by graeme clark - strategic projects manager, easyJet 29 April 2003.

Slides:



Advertisements
Similar presentations
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Advertisements

UNITED NATIONS Shipment Details Report – January 2006.
Safety Oversight System in India 20 TH SCM of COSCAP-SA 05 April 2011.
1 Introduction to Transportation Systems. 2 PART I: CONTEXT, CONCEPTS AND CHARACTERIZATI ON.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
What is valorisation ? Growth €
SIP/2012/ASBU/Nairobi-WP/19
ICAO AVIATION SAFETY PROGRAMMES
Global ATM Operational Concept
By: Michael A. Cirillo, Vice President, Air Traffic Organization, System Operations Services Date:March 27, 2007 Federal Aviation Administration Performance.
Presentation to the ICAO IVATF Montréal, 27 th – 30 th July 2010 EUROCONTROL/CFMU VOLCANIC ASH CRISIS REPORT European Organisation for the Safety of Air.
Overview of the interoperability Regulation
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
An Airline Perspective on the implementation of new systems SEMINAR ON THE IMPLEMENTATION OF DATALINK AND SATCOM COMMUNICATIONS Bangkok Thailand,
1 Practical Work and Experience With Performance Management ICAO Performance Management Symposium John Crichton, President and CEO NAV CANADA March 28,
Status of the ICAO Universal Safety Oversight Audit Programme Audits completed 179 * Interim reports178 Action plans173 Summary reports169 Audit follow-ups52.
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
System of Systems (DRAFT) To be approved by the ICAO Council
ICAO State Safety Programme (SSP) Implementation Course
Module N° 6 – SMS regulation
The Single European Sky ATM Research (SESAR) initiative
Economic Impact Of ATC Jeff Poole, March Air transport is critical to the global economy We are a US$450 billion industry We support US$2.9 trillion.
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
1 NEXTOR Monitoring and Modeling NAS Performance at the Daily Level Mark Hansen Performance Metrics TIM May 2002.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
1 Performance indicators, targets, steering Technical Interchange meeting Toulouse, May 2002 Xavier FRON Head Performance Review Unit.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 ENAC Air Transport Data AIR TRANSPORT DATA École Nationale de l Aviation Civile.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
B2B Solutions Study Summary Charts June – September 2013.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S.A.F. 1 Commodity Councils 101 NAME (S) SAF/AQCDATE.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Journey Management Nigel DAth Journey Manager Bay of Plenty RTIM Seminar 18 March 2014.
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
1 Auckland Airport Martin Fryer Sustainability Advisor.
2 |SharePoint Saturday New York City
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Page 1 The ONESKY (Single-Sky) project and what it means for ASAS.
VOORBLAD.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
ASAS-TN - Rome, 2003 ASAS Thematic Network 1 st Workshop Rome April 28-30, 2003 AN OPERATOR’S POINT OF VIEW.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
© 2012 National Heart Foundation of Australia. Slide 2.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
25 seconds left…...
European Helicopter Safety Team (EHEST) July 2014 Prepared by Michel MASSON, EASA, EHEST Secretary.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
©2008 Prentice Hall Business Publishing, Auditing 12/e, Arens/Beasley/Elder The Impact of Information Technology on the Audit Process Chapter 12.
PSSA Preparation.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
Datalink Future Now! (in 15 minutes) graeme clark operations information manager easyJet.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Directorate-General Energy and Transport
Presentation transcript:

ASAS-TN ASAS-TN - what’s in it for easyJet? presented by graeme clark - strategic projects manager, easyJet 29 April 2003

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 1 low-cost domestic regional charter international traditional scheduled Passengers 365m 435m 600m 2% 7% 15% 23% 21% 19% 33% 32% 30% 17% 16% 25% 23% 20% delivering airline growth in Europe Source: McKinsey Quarterly, 2002, UK-CAA, ERA, Airline Business, AEA,

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 2 the low cost impact - scheduled intra-European traffic 2002… LufthansaBritish Airways SASIberiaAir FranceAlitaliaeasyJetRyanair Passenger Millions Source: Respective published accounts and reports: Geographical distribution of domestic and European scheduled passenger traffic except for Iberia which reports traffic short and medium haul.

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide LufthansaBritish Airways RyanaireasyJetSASIberiaAir FranceAlitalia Passenger Millions Source: Respective published accounts and reports: Geographical distribution of domestic and European scheduled passenger traffic except for Iberia which reports traffic short and medium haul. the low cost impact - scheduled intra-European traffic 2003…

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 4 current plan is too little, too late e.g. en-route… Source: EU DG TREN ‘Datalink Roadmap’ Application Assesment P v2.0 30Oct2002

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 5 our European responsibility… STEP CHANGE  to make a STEP CHANGE in the implementation of a 21 st century air traffic system through:  leadership – deliver SES objectives by 2008 (STAR 21 report has this spirit)  effective application of funds by joining up the various EU programmes e.g TEN-T/MIP, FP6, environment etc  compelling value proposition ensuring operational implementation by airlines & general aviation  result is a significant start in the delivery of the aviation system we need…

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 6 parallel worlds show us a way…  safety - maritime; Automatic Identification System (AIS)  July 2002 – mandate regulation start… Dec 2004 – large ship completion  70,000 ships in 2 ½ years…  safety - general aviation; Capstone/UAT  1995 – study… ‘IFR’

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 7 practical world approach…  research to feasible level – (‘done’)  operational large-scale trials via C-ATM/SEAP  create operationally based database for validation  non-critical applications e.g AOC, ADS-B/tracking, D- ATIS, PDC etc first, introduce CDTI  ATM applications asap eg DAP, CAP, ADS-B in & out  complete technical standards – (‘advanced’)  rewrite operational procedures  progressive addition of high benefit ATM applications

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 8 the interoperability red herring...  Europe frequently cites global interoperability as a basic criteria for selection of ASAS enablers but the fact is:  USA is ‘doing it’s own thing’ e.g UAT, VDL3 & delaying VDL2 CPDLC…  so while Europe is in (quote) ‘air traffic crisis’ it delays the best technology & cites lack of spectrum as a typical reason in the name of ‘global interoperability’…

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 9 our European unilateral approach – mode S…  mandate of mode S is village thinking applied to an industry that has many airlines struggling to survive…  HOW MANY AIRPORTS OR ANSP’S HAVE FAILED COMPARED TO AIRLINES?  regulators and ANSP’s have failed Europe in the timely delivery of proper capacity with significant safety gains – we are at least five years behind schedule…  focus should be on WHAT surveillence data to provide not HOW to provide i.e. an open data standard…

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 10 Our European unilateral approach – short term, not inclusive…  mode S & 1090ES no real commercial benefit to airlines  Just like the mandate of TCAS, GPWS/EGPWS do nothing beyond reaction to an immediate problem (ADS- B can replace these two… = simplification = lower cost!)  i.e a short term solution for a long term need…  general aviation ‘ignored’ as usual e.g. neither ADS-B via Mode S or UAT (in Europe) a real option  but on this issue, like maritime safety, ‘all’ users must be included in order to meet our ‘duty of care’…

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 11 Enabler comparison…

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 12 Effective way forward…  Accelerate SEAP within FP6 C-ATM SEAP = Large Scale South European ADS Pre-Implementation Programme  optimised flight supply chain; collaborative decision making  SEAP; serious ASAS  SEAP is the most significant mechanism to deliver operational capacity, flight efficiency and safety we have at hand…  maximum European effort i.e. political, financial & industrial, must be applied to translate the R & D investment into operational reality…  …by 2008 – no excuses!

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 13 Summary i.e. package 2/3 !  ASAS needs to focus primarily on maximum benefit applications first i.e. package 2/3 !  ASAS only delivers serious value with:  ADS-B in & out  Cockpit Display of Traffic Information  political, financial & regulatory leadership essential if aviation is to deliver needed capacity, flight efficency & safety in Europe  airlines will lead industry change when shown the value proposition to their business  …note: supply chain = customer=> airline=> airport=> ansp=> regulator…

“ASAS Operational Improvements: Dream or Reality?”… ASAS Thematic Network Workshop #1 Rome April 2003 Slide 14 End thoughts…  airlines, airports and ansp’s hoping to use Collaborative Decision Making without a universal, seamless datalink will be like an office full of personal computers without a LAN  p.s. who is going to pay if a bit-charge enabler is used?  ATN system of the future must be driven by aircraft-derived parameters… ANSP’s will then undergo a quantum shift in safe, productive, cost efficient delivery to benefit of all…