EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7.

Slides:



Advertisements
Similar presentations
GPS and EGNOS in the EUR-SAM CORRIDOR
Advertisements

Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Amortized Analysis Some of the slides are from Prof. Leong Hon Wais resources at National University of Singapore Prof. Muhammad Saeed.
1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
INTERREG III C: Past experiences and future expectations on Interregional Co-operation Brussels, Thomas Wobben Verbindungsbüro des Landes Sachsen-Anhalt.
GALILEO and EGNOS Fotis Karamitsos, European Commission
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
Aviation System Block Upgrades and NAV CANADA Planning 17 November 2012 Pre-AN-Conf/12 Workshop.
The European Organisation for the Safety of Air Navigation WG-I #16 Meeting SESAR Security Tasks SpeakerLiviu POPESCU on behalf of Boleslaw GASZTYCH.
System of Systems (DRAFT) To be approved by the ICAO Council
ICAO Safety Management Systems (SMS) Course
LINK update Datalink Implementation EC Regulation 29/2009
IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSVÖTN European Organisation for the Safety of Air Navigation Žarko SIVČEV EUROCONTROL.
The ADQ Adventures of LFV by Roger Li, Group Manager AIM 28th of May, Brussels.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
1 Milk Market Situation Brussels, 23 February 2012.
1 June 2014Page 1 The ICAO EUR Regional Aviation Safety Team (IE-REST) FSFI International Workshop, 14 May 2013 Nicolas Rallo Regional Officer, Safety.
Lebanese Energy Statistics: A Decade in Review Dr. Joseph Al Assad.
Break Time Remaining 10:00.
Presentation of the proposed Annex 19 – Safety Management
Annex 19 Safety Management 1st edition
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
COMPASS® ReportsCOMPASS® Reports Customized List Report Placement Summary Report KDE:OAA:js & pp:2/6/20121
Milk Market Situation Brussels, 19 January Market Situation – 19 January !!! Data from some Member States are confidential and are NOT included.
Ozone Season Summary 2012 Sunil Kumar ACPAC September 10, Item #4.
EGNOS Services and LPV Implementation IWG #25 St Petersburg, June IWG #25.
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
Javier Perez Diestro Air Navigation International Director
EGNOS: a satellite navigation system for Europe, and an opportunity for Africa! Michel Bosco Head, Galileo and EGNOS Applications and International Cooperation.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
15. Oktober Oktober Oktober 2012.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Runway Safety: a pan regional view for EUR/NAT States Amsterdam, 8 March 2012 Nicolas Rallo Regional Officer,
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Further.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
: 3 00.
5 minutes.
Clock will move after 1 minute
Vorstand FB Tarif industriAll-Europe, Basic Metals Committee, Luxembourg, Collective Agreements of the European Steel Industry.
Milk Market Situation Brussels, 20 September 2012.
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Weekly Attendance by Class w/e 6 th September 2013.
Pan regional ICD for AIDC structure and status (SP/09)
Selecting Multiple Commodity Codes. 30/03/ Click on STATISTICS, then BUILD YOUR OWN TABLES from the drop-down menu. 2. Click on Data by Commodity.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
EGNOS Evolution Program Update D
EGNOS Exploitation Program Status
Wide Area Augmentation System (WAAS) E. Douglas Aguilar CAPT, USAF.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”
The CaBilAvi Project Presentation for members of ITRE Committee of the European Parliament, Prague, 4th of November, 2015.
Letové prevádzkové služby Slovenskej republiky, štátny podnikwww.lps.sk INAIR 2015 Amsterdam 13th November, 2015 Miroslav Bartoš CEO, LPS SR, š. p. Chairman,
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
EGNOS Performance and Operational Implementation status
EGNOS Implementation status in Europe
Workshop on preparations for ANConf/12 − ASBU methodology
EGNOS Service Provision Status
Presentation transcript:

EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July /07/20121ICAO PBN TF7

TABLE OF CONTENT EGNOS System & Services Status EGNOS SoL Service issues EGNOS Services Roadmap EGNOS SoL Service introduction Status 02/07/20122ICAO PBN TF7

TABLE OF CONTENT EGNOS System & Services Status EGNOS SoL Service issues EGNOS Services Roadmap EGNOS SoL Service introduction Status 02/07/20123ICAO PBN TF7

EGNOS System & Services Status 02/07/20124ICAO PBN TF7

EGNOS Services EGNOS Safety-of-Life (SoL) Service –Service Declaration: 2 nd March 2011 – EGNOS Open Service (OS) –Service Declaration: 1 st October 2009 – EGNOS Data Access Service (EDAS) –EDAS Service provided by ESSP since 2009 –Service evolutions under development by ESSP –Service Declaration planned for July /07/2012ICAO PBN TF7

EGNOS Performance Reporting − Real-Time Performance Monitoring: –EGNOS User Support Website : – Monthly Performance Reports : – Yearly Performance Reports : 02/07/20126ICAO PBN TF7

EGNOS Latest Improvements (I/II)  Increased service area and improved service robustness in border areas 02/07/20127ICAO PBN TF7 New EGNOS System Release V2.3.1p was deployed in February-March 2012 with: –GEO Swap (22/3/12): INMARSAT satellite 4F2 (PRN 126) replaced ARTEMIS satellite (PRN 124), thus improving the visibility over the North ECAC area –New reference stations: La Palma (Spain) and Alexandria (Egypt). Athens (Greece) to be deployed in the short term –Improvement in EGNOS functions (iono monitoring) –MT9/MT17 coherency guaranteed –More GPS satellites used by EGNOS (GPS block IIF)

 Actual performance obtained on a typical day… 02/07/20128ICAO PBN TF7 EGNOS Latest Improvements (II/II)

GEO Swap (I/II) The visibility in the North is improved with the inclusion of PRN126: Visibility circles on the 26/10/2011. Solid line = 0° elevation, dotted line =5° elevation INMARSAT satellite 4F2 (PRN 126)ARTEMIS satellite (PRN 124) 02/07/20129ICAO PBN TF7

3 EGNOS Geostationary Satellites PRN120 Inmarsat AOR-EPRN124 ESA ArtemisPRN126 Inmarsat IOR-W EGNOS OPS: PRN120 and PRN126 broadcast EGNOS messages to provide the SIS that is actually used by the EGNOS aviation user EGNOS TEST: PRN124 is used by industry for EGNOS System Releases tests and operators training and qualification GEO SWAP: PRN124 replaced by PRN126 in OPS end of March /07/201210ICAO PBN TF7 GEO Swap (II/II)

ESR V2.3.1i: Summer –The Industry is working in the development of a new EGNOS system release more robust to ionospheric disturbances. –It is expected that this new release will be deployed in Summer ESR V2.3.2 and V2.4.x: –Improvement of Ionospheric monitoring –LPV-200 service –Addition of new RIMS (up to 40) –Next generation infrastructure (New GEOs, improved comm network, etc.) APV I target Service Area in 2014… EGNOS future improvements 02/07/201211ICAO PBN TF7 APV-I target service area 2014

TABLE OF CONTENT EGNOS System & Services Status EGNOS SoL Service issues EGNOS Services Roadmap EGNOS SoL Service introduction Status 02/07/201212ICAO PBN TF7

TABLE OF CONTENT EGNOS System & Services Status EGNOS SoL Service issues EGNOS Services Roadmap EGNOS SoL Service introduction Status 02/07/201213ICAO PBN TF7

EGNOS SoL Service Issues 02/07/201214ICAO PBN TF7

EGNOS SoL Service (I/III) EGNOS SoL Service Definition Document (SDD) describing the characteristics and conditions of access to the service. Published on the 2 nd March 2011 New version of SoL SDD planned for summer EGNOS Service Notices generated whenever there is any complementary information to be provided to users that could affect the any SDD contents. 02/07/201215ICAO PBN TF7

 A new SoL SDD will be published this summer 02/07/201216ICAO PBN TF7 EGNOS SoL Service (II/III)

Service Notices are available at ESSP website: Service Notices published so far: Service Notice #1: MT9-MT17 Status (NOT APPLICABLE after deployment of ESR2.3.1P) Service Notice #2: Status of EGNOS performances (updated in April 2012!) Service Notice #3: EGNOS upgrades deployed in Q1 of 2012 (updated in April 2012!) Service Notice #4: Published in May 2012, related to the potential Service unavailability due to new Leap Second in June (updated on the 30/06/2012!). 02/07/201217ICAO PBN TF7 EGNOS SoL Service (III/III)

SoL Service degradation since Sept 2011 affecting APV-I availability mainly in SW and N of Service Area but: –Not compromising integrity at any moment –Not affecting OS users –Not affecting NPA users –Limited impact in published LPV procedures EGNOS SoL Service Degradation (SN#2) 02/07/201218ICAO PBN TF7 –Investigations showed that it was related to: Several NANUs on GPS SVs together with new generation GPS satellites (GPS-IIF) out of the EGNOS mask lowering the number of satellites available. Solar activity increase degrading the ionospheric monitoring capability of the system.

Mitigation actions applied –Issue given highest priority by ESSP, EC, ESA and industry. –EGNOS mask updated in February 2012 to include GPS-IIF SVs (PRN1&25) plus PRN27 –Operational workaround applied –ESR231p in February 2012 already correcting some iono related issues and improving robustness thanks to additional RIMS 02/07/201219ICAO PBN TF7 EGNOS SoL Service Degradation (SN#2)

Service Degradation Current Status: –Contingency situation not existing anymore –EGNOS performance back to nominal levels since May mainly due to: Effectiveness of Operational Work Around ESR231p improvements (iono robustness, new RIMS and new GPS satellites Block IIF) Moderation of solar activity –Additional robustness against iono activity is expected by August 2012 with ESR231i 02/07/201220ICAO PBN TF7 EGNOS SoL Service Degradation (SN#2)

International Earth Rotation and Reference Systems Service (IERS) add a leap second to the UTC, when required, in order to align this reference with the Mean Solar Time The process to manage the introduction of a new leap second in EGNOS was concluded that could imply an EGNOS service (OS and SoL) unavailability during a period of 72 hours starting from July the 1 st at 00:00:00 CET. SN #4 was published to inform on this planned service outage. EWA specific communications issued and NOTAMs generated to inform final users accordingly No service outage was finally caused. SN #4 updated on 30/06/12 accordingly. All related NOTAMs were cancelled Leap Second introduction (SN#4) 02/07/201221ICAO PBN TF7

TABLE OF CONTENT EGNOS System & Services Status EGNOS SoL Service issues EGNOS Services Roadmap EGNOS SoL Service introduction Status 02/07/201222ICAO PBN TF7

TABLE OF CONTENT EGNOS System & Services Status EGNOS SoL Service issues EGNOS Services Roadmap EGNOS SoL Service introduction Status 02/07/201223ICAO PBN TF7

EGNOS Service Roadmap document will be published by ESSP soon including: –A high-level overview of EGNOS services’ current status –EGNOS Services expected evolutions related to: Service Area extensions Service Level improvements Service Robustness improvements User Interfaces enhacements EGNOS Services Roadmap ( ) 2402/07/2012ICAO PBN TF7

TABLE OF CONTENT EGNOS System & Services Status EGNOS SoL Service issues EGNOS Services Roadmap EGNOS SoL Service introduction Status 02/07/201225ICAO PBN TF7

TABLE OF CONTENT EGNOS System & Services Status EGNOS SoL Service issues EGNOS Services Roadmap EGNOS SoL Service introduction Status 02/07/201226ICAO PBN TF7

EGNOS SoL Service Introduction Status 02/07/201227ICAO PBN TF7

EGNOS SoL Service Regulated framework under Supervisory Authority oversight required for a Safety of Life application. Civil Aviation application  Single European Sky (SES): –ESSP SAS certified as ANSP (Service Provision common requirements) –EGNOS System verified (Interoperability regulation) –Safe introduction of the SoL Service (Safety oversight regulation) –Need for EGNOS Working Agreements Main SoL objective is to support civil aviation operations down to LPV (Localizer Performance with Vertical guidance) minima. Freely offered for all phases of flight to: –Airspace Users (as defined by SES regulation) equipped with EGNOS certified receivers (TSOS/ETSOs C144,C145 or C146) –Certified Air Navigation Service Providers (ANSPs) having signed an EGNOS Working Agreement (EWA) with ESSP 2802/07/2012ICAO PBN TF7

LPV implementation status (I/IV) 1 st EGNOS Working Agreement signed with DSNA on 02/03/11 2 nd EGNOS Working Agreement signed with Skyguide on 14/11/11 3 rd EGNOS Working Agreement signed with Guernsey Airport (ANSP of Guernsey State, Bailiwick of Guernsey in the Channel Islands) on 05/12/11 4 th EGNOS Working Agreement signed with DFS on 09/12/11 5 th EGNOS Working Agreement signed with ENAV on 16/05/12 6 th and 7 th EGNOS Working Agreement signed with NATS and Austrocontrol on 14/06/12 Many other European ANSPs interested in the EWA or in the process to sign it mainly via the FP7 projects (ACCEPTA, SHERPA): AENA and PANSA now under discussion. 02/07/201229ICAO PBN TF7

LPV implementation status (II/IV) EGNOS-based procedures implementation map and detailed list included in the ESSP website /07/2012ICAO PBN TF7

LPV implementation status (III/IV) DSNA (France): First LPV procedure in EU operational in Pau on 17/03/11 –LPV in Clermont-Ferrand published on the 5 th May 2011 –LPV in Le Bourget published on the 2 nd June 2011 –LPVs in Bordeaux (08/03/12) and Biarritz (09/02/12) published –LPVs in Toulouse, Brest and Carcassonne (03/05/12) published –LPVs in Vannes and Rodez (31/05/12) –LPVs in Limoges, Nantes and Orléans (28/06/12) Skyguide (Switzerland): LPVs in Les Eplatures and St. Gallen-Altenrhein published on the 17 th November 2011 Guernsey Airport (Bailiwick of Guernesey): LPVs in Alderney Airport published on the 17 th Nov 2011 DFS (Germany): EGNOS authorised for APV Baro procedures in Germany since 15/12/11 –81 APV Baro procedures in 38 airports –6 new LPVs in different airports planned for 2012 More than 40 new EGNOS based procedures expected in 2012!!! 02/07/201231ICAO PBN TF7

LPV implementation status (IV/IV) As a summary of the current status: Plans for the rest of 2012: –Some tens more LPVs in France –6 new LPVs in different German regional airports –1 st LPV in Spain? –1 st LPV in UK? –1 st LPV in Italy? Plans in the short-mid term… High expectations based on ANSPs communicated plans for APV implementation… 32 Courtesy of Eurocontrol’s PBN Apporach Map tool 02/07/201232ICAO PBN TF7

How to Contact ESSP?  ESSP Website:  EGNOS User Support Website:  EGNOS User Helpdesk:  Service Development: 02/07/201233ICAO PBN TF7

02/07/ Questions? 02/07/201234ICAO PBN TF7

EVENT TITLE Oct 2009 Thanks!