Presentation is loading. Please wait.

Presentation is loading. Please wait.

EGNOS Services and LPV Implementation IWG #25 St Petersburg, June 2013 1IWG #25.

Similar presentations


Presentation on theme: "EGNOS Services and LPV Implementation IWG #25 St Petersburg, June 2013 1IWG #25."— Presentation transcript:

1 EGNOS Services and LPV Implementation IWG #25 St Petersburg, June 2013 1IWG #25

2 TABLE OF CONTENT 2IWG #25 EGNOS Services Status LPV Implementation status

3 TABLE OF CONTENT 3IWG #25 EGNOS Services Status LPV Implementation status

4 EGNOS Services 4IWG #25 EGNOS Open Service (OS) Service Declaration: 1 st October 2009 http://www.essp-sas.eu/service_definition_documents Agriculture, maritime, road, rail... EGNOS Safety-of-Life (SoL) Service Service Declaration: 2nd March 2011 http://www.essp-sas.eu/service_definition_documents All phases of flight in aviation SoL applications in any domain EGNOS Data Access Service (EDAS) EDAS Service provided by ESSP since 2009 Service Declaration: 26 th July 2012 http://www.essp-sas.eu/service_definition_documents Service & system evolutions under development Commercial/professional multimodal applications Markets Aviation Road Location Based Services Maritime Rail Professional Applications 2009 2012 2011 Services

5 EGNOS Service Definition Document (SDD) describing the characteristics and conditions of access to each EGNOS service. (EDAS, OS, SoL) http://www.essp-sas.eu/service_definition_documents Service Notices generated whenever there is any complementary information to be provided to users that could affect any SDD content. Three Service Notices published (with several updates) http://www.essp-sas.eu/service_notices EGNOS Performance reports: Monthly Performance Reports www.essp-sas.eu/monthly_performance_reports Yearly Service Provision Reports http://www.essp-sas.eu/printed_documents EGNOS Services related publications 514/06/2012IWG #25

6 6 EGNOS OS SDD Publication EGNOS OS Service Definition Document (SDD) v1.1 -> Published on October 30 th 2009 (ESR v2.2) V2.0 -> Published on March 18 th 2013 (ESR v2.3.1i)

7 IWG #257

8 EGNOS SoL SDD Publication EGNOS SoL Service Definition Document (SDD) v1.0 -> Published on March 2 nd 2011 (ESR v2.2) v2.0 -> Planed to be published on June 2013 (ESR v2.3.1i) 8IWG #25 APV-I Availability (99%) Coverage area v1.0 v2.0

9 9 EDAS Service EDAS (EGNOS Data Access Service) provides through the Internet the data collected and generated by the EGNOS infrastructure on real time. EDAS data is provided in different formats and protocols. The main types of information provided by EDAS are: – GPS and GLONASS observations and navigation data collected by the entire network of RIMS and NLES stations NLES – EGNOS augmentation messages. 999IWG #25

10 EDAS SDD Publication 1.EDAS Service Level 0 (ASN.1) 2.EDAS Service Level 1 (RTCM 3.0) 3.EDAS Service Level 2 (RTCM 3.1) 4.EDAS SISNeT Service EGNOS GEO satellites messages broadcast using the SISNeT protocol 5.EDAS Data Filtering Service Access to a subset of Service Level 0/2 data ( stations groups ) 6.EDAS Ntrip Service GPS/GLONASS observations and ephemeris information transmitted using the Ntrip protocol. 7.EDAS FTP Service Historical data: EDAS SL raw data, GPS/GLONASS observation and navigation, EGNOS messages and IONEX. Available since July 2012 : EDAS SDD v1.0 10 IWG #25

11 EDAS SDD Publication 1.EDAS Service Level 0 (ASN.1) 2.EDAS Service Level 1 (RTCM 3.0) 3.EDAS Service Level 2 (RTCM 3.1) 4.EDAS SISNeT Service EGNOS GEO satellites messages broadcast using the SISNeT protocol 5.EDAS Data Filtering Service Access to a subset of Service Level 0/2 data ( stations groups ) 6.EDAS Ntrip Service GPS/GLONASS observations and ephemeris information transmitted using the Ntrip protocol. 7.EDAS FTP Service Historical data: EDAS SL raw data, GPS/GLONASS observation and navigation, EGNOS messages and IONEX. Available since April 2013 : - EDAS SDD v2.0 11 IWG #25

12 TABLE OF CONTENT 12IWG #25 EGNOS Services Status LPV Implementation status

13 March 2013: o 1 LPV procedure in Switzerland: Berne-Belp (LSZB) o 1 LPV procedure in France: Grenoble Isere (LFLS) Planned for June 2013 o 1 LPV procedure in at Roma/Fiumicino airport (Italy) o 1 LPV procedure in at Venezia/Tessera airport (Italy) 13 IWG #25 April 2013: o 1 LPV procedures at Metz Nancy Lorraine May 2013: 7 new LPVs procedures in France o 1 LPV procedure at Colmar Houssen airport on 2 May 2013 o 1 LPV procedure at Nancy Essey airport on 2 May 2013 o 2 LPV procedures at Paris Orly airport on 30 May 2013 o 2 LPV procedures at Rennes airport on 30 May 2013 o 1 LPV procedure at Epinal Mirecourt airport on 30 May 2013 Planned for July 2013 o 1 LPV procedure in at Grenchen airport (Switzerland) 30/05/2013

14 LPVs implementation status and forecast (June 2013) (coordinated with Eurocontrol) 14 IWG #25 Country # Airports with EGNOS procedures # operational LPV procedures (or Baro EGNOS enabled) # Expected new Airports with EGNOS procedures for 2013-2014 period # Expected new LPV Procedures (or Baro EGNOS enabled) for 2013-2014 period Austria00+2 Czech Republic 00+2+4 Finland00+1+2 France3138+60+92 Germany39 (32 APV Baro)84 (73 APV Baro)+2+1 Guernsey1200 Italy35+10+17 Netherlands00+1+2 Norway00+5+12 Poland00+2+6 Slovakia00+2+4 Spain00+9+22 Sweden00+1+2 Switzerland33+3+4 UK00+21+44 Total77 (45 with LPV)132 (59 LPV)+121+214 30/05/2013

15 15 EGNOS-based procedures implementation map and detailed list included in the ESSP website www.essp-sas.eu LPV Implementation Status IWG #25

16 16 Questions ? 16IWG #25

17 EVENT TITLE 17 26 Oct 2009 Thanks!


Download ppt "EGNOS Services and LPV Implementation IWG #25 St Petersburg, June 2013 1IWG #25."

Similar presentations


Ads by Google