SC-214 / WG-78 Mgt Meeting 15-19 Nov 2010 Rockville, MD – Lockheed Martin.

Slides:



Advertisements
Similar presentations
1 Overview of the 2011 Programme Budget Resolution Nicola Virgill-Rolle Alternate Representative Bahamas Chair Working Group on the Draft 2011 Programme.
Advertisements

Tutorial for leadership teams of ITU-T study groups, TSAG, tariff groups and focus groups Alternative approval process (AAP) for ITU-T Recommendations.
SIP/2012/ASBU/Nairobi-WP/19
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 14th MEETING OF WORKING.
Introduction to Required Communication Performance (RCP) and Required Surveillance Performance (RSP) Read Slide. SOCM/2 Christine Falk 8-10 February.
Overview of the interoperability Regulation
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
U.S. Plans for ADS-B Briefing for
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
FANS (Future Air Navigation System) Flight Crew Procedures
Introduction to Navigation Specifications
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
International Civil Aviation Organization
Overview of Continental En-route Navigation Specifications
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Air / Ground Communications in Europe
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
The European Organisation for the Safety of Air Navigation Introducing the DQR Concept DAL/DQR Workshop Brussels, February 2013 Presented by: Miguel.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
ICAO Part 139 Review Aerodrome Certification Rule Design Proposal
Presentation of the proposed Annex 19 – Safety Management
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Workshop on preparations for ANConf/12 − ASBU methodology
School Census Summer 2011 Headlines Version Jim Haywood Product Manager for Statutory Returns.
European Helicopter Safety Team (EHEST) July 2014 Prepared by Michel MASSON, EASA, EHEST Secretary.
WG78 / SC214 – Plenary 12 (Berlin)
Fourth Quarter Oklahoma Data (October-December 2011)
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Pan regional ICD for AIDC structure and status (SP/09)
VSG – CPDLC Msg Set Validation WG78/SC214 SG (Luxembourg) Feb 2012VSG - CPDLC Msg Set Validation Presented by VSG (Greg Saccone / Jerome Condis)
Air-Ground Data Link - DFS Strategy
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.
Standards for Seamless ATS communications transition between different datalink technologies Presented by CONDIS Jerome Airbus May 2010.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
EEC-ATI (V2) 1 ATN2002 CONFERENCE LINK2000+ ATN2002 CONFERENCE LINK2000+ LINK2000+ European ATS Provider Benefits Real-time Simulation Results ATN2002.
Aeronautical Information Services (AIS) Data Link Ernie R. Dash Raytheon (FAA FISDL) RTCA SC-206/EUROCAE WG-44/53 Weather in the Cockpit (WIC) August 9,
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
International Civil Aviation Organization
FANS (Future Air Navigation System) Flight Crew Procedures
International Civil Aviation Organization
Data Communications Program
Outcome TFCS-11// February Washington DC
IBAC – CNS/ATM Datalink Briefing
15-19 Nov 2010 Rockville, MD – Lockheed Martin
DATA LINK IMPLEMENTATION IN EUROPE
Bringing Early Benefits … Building Momentum … Converging !
Scene setter European Commission DG Environment
Presentation transcript:

SC-214 / WG-78 Mgt Meeting Nov 2010 Rockville, MD – Lockheed Martin

ATN Baselines 2 & 3 CMCPDLCD-FIS Data Communication Standards Publication Plan DLICAFNAMCACMDCL D- TAXI(t) D- TAXI(g)ACL4DTRADFLIPINTIMPRD-ATISD-OTISD-RVRD-HZWX SPR for ATN Baseline II Interoperability Standard for Data Communication Via ATN Baseline II Interoperability Standard for an ATN Baseline II Ground System Providing Service to FANS-1/A+ Aircraft  SPR for ATN Baseline III Interoperability Standard for Data Communication Via ATN Baseline III Interoperability Standard for an ATN Baseline III Ground System Providing Service to FANS-1/A+ Aircraft

Publication Approach  Proposal FAA DataCom for Two Volumes; end of 2011 and mid 2013  SPR for ATN Baseline II (12/2011)  Support contracting for ground systems  Support non-integrated aircraft  Scope  DLIC, AFN, D-ATIS (subset of D-OTIS), DCL, AMC, ACM, ACL, D-TAXI (text), FLIPINT (incl. EPP), PR  Routine use of complex clearance (ACL extended route variable) requires integrated FMS  Interoperability Standard for Data Communication Via ATN Baseline II (12/2011)  Supports DLIC, D-ATIS (subset D-OTIS), DCL, AMC, ACM, ACL, D-TAXI (text)  Not for routine use of complex clearances  Interoperability Standard for an ATN Baseline II Ground System Providing Service to FANS-1/A+ Aircraft (12/2011)  Supports AFN, FLIPINT, DCL, AMC, ACM, ACL, PR  SPR for ATN Baseline III (6/2013)  Incorporates SPR for ATN Baseline II by reference  Introduces D-OTIS, D-RVR, IM, D-TAXI (graphic), D-HZWX, 4DTRAD  Interoperability Standard for Data Communication Via ATN Baseline III (6/2013)  Incorporates by reference Interoperability Standard for Data Communication Via ATN Baseline II  Introduces D-OTIS, D-RVR, IM, D-TAXI (graphic), D-HZWX, 4DTRAD  Interoperability Standard for an ATN Baseline III Ground System Providing Service to FANS-1/A+ Aircraft (6/2013)  Incorporates by reference Interoperability Standard for an ATN Baseline II Ground System Providing Service to FANS 1/A+ Aircraft  Introduces IM

Resolution to Recs in Pos Papers Paper1: FAA Issues  Airspace change definition  Cannot be acted upon yet, pending JPDO input at a later date, deadline for comments is end of Dec 2010  Operational requirements versus service and application requirements  Response agreed but reference should be to Annex 10/Vol2Ch8, rather than DO306/ED122 – delegated to CSG – work to be completed by mid April 2011  Mixed “data link capable” fleet operations  There is no impact on the SPR. The considerations mentioned in the reply are removed.  Performance-based framework - RCP  Response modified as follows:  FAA-AVS is requested to provide guidance on specification of technical performance criteria for the CM application.  Maintain RCP values for selected DFIS services.  Finalise together with OPLINK the revised RCP values and the operational requirements.. Pending on the outcome, the RCP Manual may be extended with 1 or 2 new RCP values (e.g.RCP 180 & 300). See also item ‘78/214’: Within the constraints of statistical approach align the RCP values with those in the RCP manual.  Delegated to CSG

Resolution to Recs in Pos Papers Paper1: FAA Issues…cont  CPDLC message set and CPDLC indications (modes, incoming messages) and alerts (failures, loss of connection)  CSG will review the CPDLC message set  Deadline mid April 2011 for DCL, AMC, ACM, ACL, D-TAXI (text), IM, D-TAXI Graphic,  Deadline end of 2012 for 4DTRAD  The use of CPDPLC Indications and Alerts Attributes has to be updated, based on feedback from external validation activities. (if some address that specific point)  For 2011 delivery date, JPDO input is needed by January 10-14, /214 SG meeting  Delegated to CSG

Resolution to Recs in Pos Papers Paper1: FAA Issues…cont  Aircraft’s flight guidance system (e.g., FMC) autoload and data transfer (e.g., ADS-C EPP, radio freq, clearance data)  In general, all messages containing the Route variable are candidate for autoload.  A screening of all CPDLC messages for autoload is needed; and the principle needs to be discussed, including all avionics stakeholders  Additional Ors or Safety Requirements for autoload of CPDLC messages may need to be defined  There may a safety issue for LINK2000 avionics that can technically receive complex clearances through UM80; however not all LINK2000 avionics can act upon the received clearance or meet RCP. The LINK2000 local safety cases today limits the uplinking to maximum 2 waypoints.  Delegated to FAA by December , then CSG by Feb 2011

Resolution to Recs in Pos Papers Paper1: FAA Issues…cont  D-TAXI textual/graphical consistency/accuracy  Feedback from validation projects are awaited to confirm the requirement for Graphical D-TAXI  The issue needs to be resolved by end of 2012  Partial CPDLC application – harmonization  We confirm our commitment to not support partial builds  FAA AIR will draft objectively verifiable definition of “routine use of complex clearances” for consideration by CSG at subgroup meetings during the week of 1/10/2011.  We confirm our commitment to not support partial builds.  Accommodate FANS 1/A+ implementation of ADS-C for Ground system implementations of ATN Baselines II & III.  ATN Baseline III implementation requires EPP.  OBE  Partial D-FIS  We confirm our commitment to not support partial builds  Utility of proposed services to be assessed jointly with TOPS at January Subgroup  ATN Baseline II incorporates D-ATIS  ATN Baseline III incorporates all defined D-FIS services.  2.5.x To be addressed in meeting of Ad Hoc Management Group (WEBEX) planned for TBA.

Meetings 2011 SGsJanuary 10-14US, FAA Tech Centre, Atlantic City P12April 11-15Berlin, DFS SGsJune 20-24US SGsAug29 – Sept2Europe P13Sept 26-30Europe SGsOct 31 – Nov 4US P14Dec 5 - 9US – RTCA, DC