1 IBAC – CNS/ATM Datalink Briefing
17-Nov-2010 Martin Adnams

2 LINK 2000+ First Datalink Implementation
Implementing En-route CPDLC over ATN/VDL2 Baseline ICAO standards Forward compatible with new services/technology Programme Objectives ACL – ATC Clearances ACM – ATC Microphone Check ACM – ATC Communications Management Above FL285

3 LINK 2000+ First Datalink Implementation
Implementing En-route CPDLC over ATN/VDL2 Baseline ICAO standards Forward compatible with new services/technology Programme Objectives Overall 11% Capacity Gain Reduced Controller Workload Increased Safety Fewer Misunderstandings Above FL285 Infrastructure Basis FDPS, Avionics, A-G tech. >>> SESAR

4 Implementation Strategy
Pioneers Incentives Mandate 1 Pioneers Objective: 100+ aircraft equipped/ MAAS UAC ACHIEVED – >400 committed Incentives Objective: accelerate Airborne equipage for early benefits ACHIEVED – EC TENT-EA Funding Granted Mandatory Implementation - SES IR For Operators and ANSPs Objective: more than 75% of flights in LINK airspace by 2015 ACHIEVED - EC Reg. No 29/2009 Published 2 NOW WE JUST NEED TO IMPLEMENT 3

5 DLS IR (EC Reg. No. 29/2009) Key Dates
Aircraft Forward Fit New aircraft conform ANSPs LINK/Core Region INCENTIVES = EARLY EQUIPAGE Aircraft Retrofit Fit ANSPs Whole of EU 1st Jan 2011 7th Feb 2013 5th Feb 2015 2009 2010 2011 2012 2013 2014 2015 2016

6 Which Aircraft shall equip?
A/C operating IFR/GAT in the EU data link Airspace (FL>285)‏ All aircraft flying the EU data link airspace unless exempted under following conditions

7 Automatic Exemptions – Article 3
a/c with individual airworthiness certificate before 01/01/2014 and equipped with FANS ED-100, ED-100A certified data link equipment a/c which are at least 20 years old and planned for cease of operations before December 2017 a/c flying for testing, delivery and maintenance purposes State a/c but those entering into service after 1 January 2014 should comply with the rule if equipped with non-military data-link

8 DLS-IR Exemptions Under Article 14 Application to EU Needed
Aircraft types reaching the end of their production life and being produced in limited numbers Aircraft types for which re-engineering costs required would be disproportionate due to old design Case must be Made by Applicants Can be Permanent or Temporary for Forward Fit Applications for Temporary Exemptions before Nov 17th 2010, otherwise it will not be possible for the Commission to form an opinion in due time before the Forward Fit date itself i.e. Jan 2011.

9 Process for Exemptions Under Article 14
Request (ERQ) Requirements & Template The European Commission is the Process Owner Applicant Submits ERQ to European Commission Exemption Cell Analysis Exemption Cell Report SSC OPNION Decision of European Commission Confidential Discussion Request for Information Applicant DOC All Applications to be made electronically to EU Contact:

10 Decisions on Exemptions
EUROCONTROL Report Begin SEPT Briefing to Single Sky Committee SEPT 20/21 Information Paper & Draft Decision Vote & Decision Single Sky Committee DEC 3rd Further requests for Permanent Exemption ASAP Final Date end 2012

11 EASA Certification & DLS IR Compliance
APPLICANT EASA CERTIFICATE Apply to EASA, Comply Special Condition/ Cert. Specification EASA Check Airworthiness and Interoperability One Single Process – Airworthiness & Compliance to EC 29/2009 2 4 3 1 EASA/EC Workshop on March 16th >>One Process Airworthiness & Compliance Brochure Special Condition for Early Applicants - In Preparation EASA Certification Specification planned Q2 2011

12 LINK Objectives for 2010 Concrete Implementation plan for LINK 2013 ANSPs Contact the 2015 ANSPs Survey Complete Results in PRISME Plan & provide Test & Expert support to ANSPs and Airlines So far mainly Airborne but 24 ANSPs now request support Validate Multi-Frequency VDL Mode 2 Flight Tests Dec 2010 Finalise Contracts with Airlines for the LINK Incentives Scheme Contracts with 23 Airlines being signed >> 712 aircraft

13 Incentives For Airborne Equipage
EUROCONTROL Application to TENT-EA made March 15th 2009 Requested by IATA/AEA/IACA/ERAA/EBAA Evaluation Passed – Decision Final 22/12/2009, 19.3M€ >50% Must be Spent by End 2010 25% End 2011 25% End 2012

14 Incentives Status 3 Calls for Tender launched January, June & August
From 1st call 19 Airlines will be contracted From 2nd & 3rd call evaluation in progress But numbers much lower than in 1st call More than 700 aircraft to be equipped, But not all the Grant money will be used

15 Central Reporting Office (CRO)
Is it all Working? - INTEROPERABILTY How Well? – PERFORMANCE Problems? - INVESTIGATE

16 Pilot and Controller HMI
See Controller and Pilot Demonstrator at

17 CONCLUSION on LINK The DLS IR dates are firm Time is short
Good Progress but still much to do The LINK Team is resource limited Please make any support requests in good time UPLINK 13 – Available, take a copy

18 Datalink Will Evolve 2015+ 2020+ SHORT TERM SESAR – IP1 MEDIUM TERM
LONG TERM SESAR – IP3 IOC IOC IOC IMPLEMENTATION Package(s) IMPLEMENTATION Package(s) LINK 2000+ Initial CPDLC Initial 4D Full 4D LINK Message set Initial 4D Message set(s) Full 4D Message sets Transition VDL M2 FCI IOC – Initial Operational Capability

19 EUROCAE WG-78/RTCA SC-214 Standards for IP2 Services
2010 2011 2008 2009 FAA Call to Industry WP1 + WP2 WP1 Draft WP2 Standards Publication

20 Initial 4D & Other Services for IP2 First Proposal for Implementation >> end 2011
En-Route, TMA Initial 4D 4DTRAD FLIPINT Airport D-TAXI D-OTIS Others D-RVR D-HZWX Oceanic ATSA ITP/IM Improved Planning NOT Separation In line with SESAR’s longer term approach Provides an intermediate and pragmatic step Co-ordinated with FAA in WG78/SC214 SESAR JU WP9 >> Prototype Avionics 20

21 Legacy systems and New IP3 Technology
Proposed Multilink Concept Legacy Systems Airport surface General terrestrial Satellite: Oceanic + Continental

22 FCI Deployment for IP3 Initial Operational Capability Transition and
wider Roll-out Full Network Benefits 2020 Circa 2025 Circa 2030 Satcom FCI Satcom FCI Satcom FCI Aero-Max Some Airports Aero-Max Some Airports Aero-Max Some Airports Aero-Max Some Airports Terrestrial FCI Full European Terrestrial FCI Some areas Terrestrial FCI Grows Legacy system (e.g.VDL M2, DSB-AM) FCI New voice system? Continued use of Voice – More use of Datalink Capacity, Safety, Performance, Cost Targets

23 CONCLUSION on Next Steps
SESAR and NEXTGEN R&D, Validation Underway Formal EC-FAA Co-ordination in place OPLINK Panel working on Datalink Harmonization Plan for ANC2012

24 THANK YOU