Modeling Work Group Staff Report MWG Meeting August 1, 2011 Web Meeting.

Slides:



Advertisements
Similar presentations
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Advertisements

Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff.
Modeling Work Group Discussion Points MWG Meeting June 6, 2011 Web Meeting.
1 Modeling Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting August 20, 2009 Tom Miller Pacific Gas & Electric Status and Outlook.
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
1 There is a major risk that Europe gets off-track in the 2020s The current policies will not achieve the EU ambition as CO 2 intensity will rise without.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Iowa Stored Energy Park APPA Engineering and Operations April 16, 2007 Sam Shepard Electricity and Air Storage Enterprises CAPTURING THE POWER OF NATURE.
1 CPUC Avoided Cost Workshop Generation Avoided Costs.
Study Results High Hydro Study Low Hydro Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impacts of low.
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
Congestion Management Settlement Credits December, 2002.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Western Regulation Usage and Pilot Program Results 1.
Federal Energy Regulatory Commission Pat Wood III, Chairman Regional Grid Development Pat Wood, III Kansas Transmission Summit September 8, 2004.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
September 10, 2014 Associated Electric Cooperative 1 Joe Wilkinson Director, Member Services & Corporate Communications.
Discussion: Use of RAPs in system operations Kris Dixit 1.
Study Case Report PC 10 High Carbon Price PC 11 Low Carbon Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Planning & Operations Spring 2010
Study Case Results PC06 High NG Price PC07 Low NG Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Least Cost System Operation: Economic Dispatch 1
EAEI Department  Electricity Markets and Policy Group Congestion Measures for Organized Electricity Markets in the U.S. Emily Fisher Lawrence Berkeley.
Production Cost Model Fundamentals
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Calculation of Net Energy for Load COPS. 2 2 Outline  Definition of Net Energy for Load  How Net Energy for Load is calculated in ERCOT.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
PJM©2008 Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market Paul M. Sotkiewicz, Ph.D. Senior Economist PJM Interconnection Organization.
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
ISO New England State of the Markets Report May April 2002 Robert Ethier, Ph.D. Manager, Market Monitoring and Mitigation ISO New England June 26,
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Thermal Plant Data and Assumptions TEPPC – Data Work Group Call Tuesday, September 29, 2015.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Jan Strack San Diego Gas and Electric TEPPC Overview TEPPC Review Task Force January 11, 2016 Salt Lake City, UT.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Rocky Mountain Area Transmission Study Overall Economics of Alternatives Steering Committee Meeting April 29, SLC.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Webinar January 25, 2016 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Date of download: 10/15/2017 Copyright © ASME. All rights reserved.
Energy and Ancillary Services Design Stream Working Group Meeting 6
Evolving Economic Dispatch in SPP
Western Electricity Coordinating Council
Changing Market Dispatch
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Use of EDWG Data by the LTPT
Presentation transcript:

Modeling Work Group Staff Report MWG Meeting August 1, 2011 Web Meeting

2 MWG analysis of high COI flows is ongoing Past emphasis was on comparisons between PROMOD and Gridview, which evolved into attempts to standardize the input and run assumptions. Currently, focus is on the differences in the generation commitment and dispatch. COI Flow Analysis and Gridview Comparison

Result Comparison Comparison to new GV run by Sherman with loads reduced by 3.4% to back out transmission losses. Note large difference in coal generation.

Most Significant Gen Differences

Annual Energy Difference by Area In general, the trade-off is between coal and combined cycle generation, and appears to be caused by differences in the commitment and dispatch logic. Since the hurdle rates and tie limits effectively separate Alberta from other areas, initial analysis can focus there.

Difference in Alberta (MWh)

Sample AESO Load/Gen (1)

Sample AESO Load/Gen (2)

Sample AESO Load/Gen (3)

Sample AESO Load/Gen (4)

Sample AESO Load/Gen (5)

Sample AESO Load/Gen (6)

Alberta Coal Dispatch - Promod

14 In PROMOD the hurdle rates represent a financial obstacle that must be overcome to allow economic interchange to occur. If the marginal price in SR A is $30 and the marginal price in SR B is $25 and the hurdle rate from B to A is $7, there would be no interchange. Hurdle Rates

15 TEPPC Hurdle Rates for 2020

16 Wrap-up Next meeting o Need to set date (1 st Monday is holiday) Note TAS meeting is August 8-9 Wrap-up and Next meeting

Questions?