Doug Tucker of WECC & Milorad Papic of IPC 2012 TRD/TADS Webinar October 23, 2012.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Chapter 1 The Study of Body Function Image PowerPoint
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Remedial Action Schemes Reliability Subcommittee
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
WECC TRD/NERC TADS Webinar
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Remedial Action Schemes Application and Implementation Requirements & Performance Assessment Measures Vahid Madani Pacific Gas and Electric Co. Chair -
Report of the Operating Committee Don Watkins Operating Committee Chair April 28, 2009.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Standards Committee Joint Session
The Western Electricity Coordinating Council Doug Tucker of WECC & Brian Keel of SRP November 16, TRD/TADS Webinar.
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
The Western Electricity Coordinating Council Doug Tucker Associate Engineer September 22, TRD/TADS Webinar.
WECC System Performance Criteria 1st Team Meeting Background
Underfrequency Load Shedding Report
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.

EMS Checklist (ISO model)
Text 1 July, 2010 DCMS: Training Manual Campaign Management.
Effectively applying ISO9001:2000 clauses 6 and 7.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Discrete Event (time) Simulation Kenneth.
VOORBLAD.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
CUG Meeting June 3 – 5 Salt Lake City, UT
© 2012 National Heart Foundation of Australia. Slide 2.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
PSSA Preparation.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
Annual Register Verification Training Presented By: OFFICE OF AUDITOR GENERAL New York City Department of Education.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
Presented to PGDTF February 11, 2015
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
Review of Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Workshop Session 2: Forms
Compliance Open Webinar
Workshop Session 1: Overview
Workshop Session 1: Overview
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
Compliance Open Webinar
Presentation transcript:

Doug Tucker of WECC & Milorad Papic of IPC 2012 TRD/TADS Webinar October 23, 2012

2 o General Overview – Milorad Papic, IPC o Modified WECC TPL-001-WECC-CRT-2 System Performance Criterion effective since April 1, Milorad Papic o An update on current activities of WECC RS – Milorad Papic o Cooperation between RPEWG and NERC in performing statistical analysis using TRD outage and inventory data – Milorad Papic o Common Tower versus Common Corridor – Milorad Papic o WECC 2012 State of the Interconnection Report – Doug Tucker o Data Correlation to PRC – Doug Tucker o Joint Ownership – Doug Tucker o Conclusion – Doug Tucker WECC TRD and NERC TADS

3 RPEWG (Reliability Performance Evaluation Work Group) WECC TRD (Transmission Reliability Database) NERC TADS (Transmission Availability Data System) TRD vs. TADS General Overview

4 PMWG was formed as a RS Working Group in June In a 1996 WSCC survey indicated that 90% of member utilities expressed interest in a development of some type of probabilistic based reliability criteria. In 1998 PCC approved the PBRC development framework and Phase I Implementation Plan. PBRC Phase I development and implementation of event probabilities into Performance Table (Table W-1) was completed. Ultimate goal is to produce a more economically efficient system without sacrificing system reliability. RPEWG - History

5 TRD started as a sub group of the Reliability Subcommittee Spring 2004 WECC PCC - OC 2005, requested to re-tool for attributes Formed TRDTF in Fall 2005 WECC PCC, OC and Board approved it in Fall of 2006 RPEWG merged with TRDTF as a new RPEWG sometimes in the end of 2006 RPEWG - History

6 RPEWG was initially formed as a PCC Working Group. RPEWG has started to play new role as result of new NERC Reliability standards and WECC Reliability Criteria as well as the creation of a new WECC outage data system TRD. RPEWG was merged with TRD Task Force in RPEWG past Chairs: James Leigh-Kendall (SMUD), John Leland (NWE) and Brian Keel (SRP) 6

7 RPEWG – Scope of Work Develops processes to implement probabilistic-based reliability criteria Reviews requests for performance category adjustments Monitors facility outage data and recommends category adjustments Maintains the Performance Level Adjustment Record Define facility outage data reporting requirements and making recommendations to the RS on reliability performance level. 7

8 Members of the RPEWG (includes WECC Staff as Members of RPEWG) only have access to raw outage data RPEWG Members listed on the WECC website Access to data governed by RPIC, Approved Exhibit C Raw outage performance compared to criteria of WECC Performance Criteria Table W-1 RPEWG Membership & Activities

9 Purpose of TRD Provides a common format for outage data submittal to WECC and NERC Provides a transmission outage database for PCUR (Performance Category Upgrade Requests) Provides database to monitor, evaluate and report WECC transmission lines & transformers performance Provides pool of reliable outage statistics to assess impact of various variables such as: environmental conditions, equipment type, voltage class, age etc). Enables Benchmark data with other data sources (NERC, CEA, CIGRE, SGS, Companies database, etc.)

10 Transmission Circuit Attribute Table Same as last year; Miles, Type, Voltage, Conductors per Phase, Overhead Ground Wires, Insulation Type, Cable Type, Structure Materials, Structure Types, Circuits per Structure, Terrain Exposure, Elevation Exposure. Transformer Attribute Table Same as last year; High and Low Side kV, Single or Multi, Rating. TRD Sheets

TRD Transmission Reliability Data Standard Statistical Reports Performance Reports Customized Reports TRD COLLECTION SCHEME.... Utility 1 Utility 2 Utility 3 Utility n NERC TADS 11

12 TADS (TRD) overview NERC wide data collection AC circuits >= 200kV Transformers Low Side >= 200kV AC/DC Back to Back Converters >= 200kV AC Voltage DC Circuits >= +/-200kV NERC TADS

13 TADS Metrics Calculated: Inventory of AC & DC Equipment Circuit & Transformer Outage F & D per outage initiation code Circuit Sustained and Momentary Outage Metrics, Element or Other Initiated NERC TADS

Data Submittal & Review TO Submits Data to WECC WECC WECC REVIEW TOs DATA Check TO Data Assign Event ID Codes for Events affecting more than one TO NERC NERC REVIEW WECC DATA Check WECC and other RE Data Assign Event ID Codes for Events affecting more than one RE Fills in missing data on whether an outage triggered a disturbance report WECC submit reviewed TADS data to NERC 14

15 TRD Data Differences: Focus on Common Corridor Outages (RPEWG) Physical Attribute Data Inputs Circuits Outage Rates per Conductors per Phase Number of Ground Wires Insulator Type Structure Material Structure Type Terrain Exposure Elevation Range TRD and TADS Differences

16 The modified WECC TPL System Performance Criteria was approved by the WECC BOD December 1, 2012 and has an effective date of April 1, Modifications include: Modified the definition of Adjacent Transmission Circuits is now included in the “WECC Glossary of Terms” Removed the definition for Common Corridor Modified the applicability of the Adjacent Circuits Requirement R1.1 TPL-001-WECC-CRT-2 System Performance Criteria

17 Purpose: System simulations and associated assessments are needed periodically to ensure that reliable systems are developed that meet specified performance requirements with sufficient lead time, and that systems continue to be modified or upgraded as necessary to meet present and future system needs. Applicability * Applies to only Adjacent Transmission Circuits where both circuits are greater than or equal to 300 kV. * Applies to effects on facilities external to a Transmission Planner area. * Does not apply to Adjacent Transmission Circuits that share a common right-of-way for a total of three miles or less, including – but not limited to – substation entrances, pinch points, and river crossings. TPL-001-WECC-CRT-2 System Performance Criteria

18 A. Requirements R1. In addition to NERC Table 1, each Planning Coordinator and Transmission Planner shall comply with WECC’s Disturbance-Performance Table (Table W- 1) of Allowable Effects on Other Systems and Part 1.1–1.4, contained in this section, when planning the Transmission System in the Western Interconnection The NERC Category C5 initiating event of a single-line-to-ground fault with normal clearing shall also apply to the common mode contingency of two Adjacent Transmission Circuits on separate towers — unless the Mean Time Between Failure (MTBF) is determined to be greater than 30 years (i.e., outage frequency is less than outages per year). R5. For any event that has actually resulted in cascading, action must be taken so that future occurrences of the event will not result in cascading; or it must demonstrate that the Mean Time Between Failure (MTBF) is greater than 300 years (frequency less than outages/year) and approved by PCC Any contingency adjusted to Category D must not result in a cascading outage unless the MTBF is greater than 300 years (frequency less than outages/year); or the initiating disturbances and corresponding impacts are confined to either a radial system or a local network. TPL-001-WECC-CRT-2 System Performance Criteria

19 WECC Table W-1

20 TRD Outage Data Collection Planning and Operations Criteria Differences Impact of high Transfer for Adjacent Circuits Composite Load Model Impacts Performance Criteria Upgrade Request Process Variable Generation Study An Update on Current RS Activities

21 Overview of WECC Transmission Reliability Database o Inventory o Outages AC circuit outages: Distribution study Transmission circuit attributes as explanatory variables for the number of outages (the outage rate) Correlation analysis and hierarchy of the numerical explanatory variables for the number of outages Remarks on statistical analysis for character attributes Presentation by Svetlana Ekisheva is available on WECC web site under RPEWG NERC & RPEWG Cooperation in performing statistical analysis of TRD outage & inventory data

CRW COT Common Tower & Common Right of Way

WECC State of the interconnection Transmission Line Circuit Miles - AC Voltage (kV) AC Voltage Total AC Miles 120,385 Line Miles 27,84516,6163,47541,31110,14620,992 Table 1: Transmission Line Circuit Miles - AC Voltage (kV) Transmission Line Circuit Miles - ± DC Voltage (kV) DC Voltage Total DC Miles 1,744 Line Miles 14701, Table 2: Transmission Line Circuit Miles - +/- DC Voltage (kV)

24 Transmission Circuits Frequency Figure 1: Frequency of Outage Duration 2011

25 Percent Distribution of Outages Figure 2: Causes of Transmission Outages for 2011, All Voltages

26 Data Gathering Discussion and results Outages with the same element ID that occur within 1-5 minutes of each other need separate event IDs Joint owners – need to report only the lines you are responsible for according to form 2.1 Correlation to PRC-003-WECC-CRT-1 (Misoperation Report) and Disturbance reports

27 WECC converts the TRD data into the NERC forms 3.1, 3.2, 3.4, , 5.0, 6.1, 6.2, 6.3, 6.4 Upload the data onto the NERC database WECC takes the additional data and creates the TRD report which will give us an insight on any patterns that will arise WECC State of the Interconnection Report WECC Data Handling

28 NERC has asked the TO’s to correlate with each other on who is reporting the information for their jointly owned lines TO A and TO B must be reporting jointly owned lines on Form 2.1 and indicating who is the reporting TO even if TO B owns 1% of the line and TO A owns 99% of the line Joint Owner Form 2.1

29 Form 2.1 TO-SRP TO-SCE

30 NERC Glossary of Terms (updated 4/20/2010) defines Misoperation as; o “Any failure of a Protection System element to operate within the specified time when a fault or abnormal condition occurs within a zone of protection. o Any operation for a fault not within a zone of protection (other than operation as backup protection for a fault in an adjacent zone that is not cleared within a specified time for the protection for that zone). o Any unintentional Protection System operation when no fault or other abnormal condition has occurred unrelated to on-site maintenance and testing activity.” For each sample ‘Misoperation Cause’ below, based on the current ‘TADS Cause Code’ definitions, the following ‘Cause Codes’ should be used on Form 4.x ; Misoperation Cause Codes

31 Mapping of Misoperation

32 TOs are responsible for data quality. Each Regional Entity Coordinator (REC) or Designated Regional Entity Coordinator (DRE) is available to assist TOs (Doug Tucker; o Form 1.1 & 1.2 contact updates & checklist of Forms o Form 2.x “Multi-Owner” reporting coordination single TO is responsible for TADS reporting of outages AND inventory. o Coordinate common Event ID code for TADS Events affecting more than one TO. Enter a TADS “NERC Company” Event ID code. o Coordinate evaluation of AC Circuit outages on common structures when the circuits are owned by different TOs. o Prior to March 1 st, TOs should reconcile their TADS reported outages with outages to be reported in PRC and EOP required reports. o Prior to March 1 st, TOs should review their TO webTADS “Reports” for outage & inventory data consistency & completeness. Responsibilities for Each TO * TADS Training Part A v5.ppt

Questions?