Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.

Slides:



Advertisements
Similar presentations
Public Scoping Meeting December 3, 2012
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Addition Facts
Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
VOORBLAD.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Squares and Square Root WALK. Solve each problem REVIEW:
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Shoreline Master Program Update Shoreline Master Program Update: Process Overview City of Benton City August 30,
Presented to: Minnesota Chamber of Commerce October 1, 2012.
Watershed Staff Videoconference October 17, 2012.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Addition 1’s to 20.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
We will resume in: 25 Minutes.
Yuba-Sutter Regional Conservation Plan EIS/EIR SCOPING MEETING January 6, 2015.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
Skyline Heights City of Corona Scoping Meeting March 4, 2014.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Yuba County Comprehensive Flood Protection Program
Solar Energy Research Center Project CEQA Public Scoping Meeting May 26, 2010.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Providence Saint John’s Health Center Phase II Project
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
City of Los Angeles Department of Public Works Bureau of Engineering
Overview What is the CEQA environmental review process?
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
Brackish Water Desalination Project Draft EIR
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014

Meeting Agenda Welcome and Introductions Meeting Objective Project Background Proposed Project Alternatives Scoping and CEQA Process Environmental Issues Public Comments and Input 2

Introductions Three Rivers Levee Improvement Authority Paul Brunner, Executive Director Downey Brand Andrea Clark, Legal Counsel MBK Engineers Larry Dacus, P.E., Project Engineer AECOM Andrea Shephard, Ph.D., Environmental Project Manager 3

Meeting Objective Seek public and agency input on the scope and content of the EIR, including alternatives 4

Proposed Background 5

Project Location 6

Project Need Yuba River actively eroding south bank tailings mound. Landform changes in Goldfields have affected flow paths and made it easier for floodwaters to flow through the Goldfields. Areas that were thought to have 200-year flood protection are still at risk. 7

Project Purpose 8 Reduce flood risk to properties in RD 784 and TRLIA assessment districts by providing sustainable 200-year flood protection.

Project Objectives Prevent 200-yr flood waters from flowing through Goldfields and flanking State Plan of Flood Control levee system. Implement long term sustainable solution by Minimize impacts on aggregate mining operations. Minimize impacts on gold dredging operations. Minimize impacts on environmental resources. Provide environmental benefits, if feasible. 9

Proposed Project Alternatives 10

Project Alternatives Four (4) Action Alternatives plus the No-Project Alternative to be evaluated at equal level of detail in EIR. Alternatives 1, 2, and 3 – Construct embankment within the Goldfields using existing dredge tailings. Alternative 4 – Construct engineered levee south of the Goldfields using material imported from nearby. All alternatives would meet USACE and DWR urban levee design criteria for 200-year flood protection. 11

Project Alternatives Alternative 1:100-Year Project Enlargement 9.0 mile embankment 331 acres in Goldfields Alternative 2:West-Side Goldfields Boundary Alignment 8.8 mile embankment 317 acres in Goldfields Alternative 3:South Bank Yuba River Alignment 9.1 mile embankment 291 acres in Goldfields Alternative 4:Levee South of the Goldfields 3.5 mile embankment 199 acres in Goldfields 12

13 Project Alternatives

14 Alternatives 1, 2, and Year Embankment in Goldfields Regular O&M: inspections, weed abatement, surface patrol road maintenance. During High Flow Periods: Surface road patrols every 4 hours to identify/address potential flooding issues

Alternative 3 Relocation of Waterway Fish barrier at New OutletScour Protection Will require periodic repair and replacement. Expected design life of 50 years.

16 Alternative Year Levee South of Goldfields Regular O&M: Same as other alternatives plus management of vegetative cover on levee side slopes, operation and annual maintenance of pipe and gates at YCWA canal crossing. During High Flow Periods: Surface road patrols every 4 hours to identify/address potential flooding issues

No-Project Alternative 200-year flood protection solution not built. 100-year flood protection solution built. Decreased flood inundation benefits of TRLIA 200-Year Flood Protection Program. Portions of RD 784 and TRLIA assessment districts may be mapped into FEMA floodplains. Residents have to purchase flood insurance. 17

CEQA Review Process 18

Purpose of Scoping Inform public and agencies Receive public/agency input Help define project Help identify range of alternatives Help identify environmental effects to be evaluated 19

Environmental Review Schedule 20 Notice of Preparation of an EIR June 13, 2014 Scoping Meeting June 23, 2014 Scoping Period Ends July 14, 2014 Notice of Availability/Draft EIR August 2014 Public Review 45 days Response to Comments/Final EIR November 2014 Commenting Agency Review 10 days EIR Certification Project Decision Findings Overriding Considerations Mitigation Monitoring Plan Notice of Determination November/December 2014 Permitting2015

Opportunities for Input Scoping Meeting Today NOP 30-Day Comment Period June 13 – July 14 Draft EIR 45-Day Public Review Period August/September 21

Issue Areas to be Addressed Aesthetics Agricultural and Forestry Resources Air Quality Biological Resources Cultural Resources Geology/Soils/Minerals/ Paleo Resources Greenhouse Gas Emissions Hazards and Hazardous Materials Hydrology/Water Quality Land Use/Population and Housing Noise Recreational Resources Transportation/Traffic Utilities and Public Services 22

23 Project Alternatives

How do you participate? Present your views today. Please focus on the scope of the project (i.e. project elements and alternatives & environmental effects and mitigation). Provide written comments on the NOP today or to TRLIA by 5 pm, July 14, Paul Brunner, TRLIA 1114 Yuba Street, Suite 218, Marysville, CA Fax: (530) Review and comment on the Draft EIR. Contact TRLIA throughout the process. 24