WS-RF TCMay 2005 F2F 1 WS-RF Technical Committee May 2005 Face-to-face Agenda.

Slides:



Advertisements
Similar presentations
Introduction to Web Bill of Lading Q Proprietary and Confidential Copyright © 2005 INTTRA Inc. 2 Agenda Industry Challenges INTTRA Solution Value.
Advertisements

Doc.: IEEE /0918r3 Submission September 2005 Emily Qi, et alSlide 1 Proposed TGv Selection Process Notice: This document has been prepared to.
Balloting/Handling Negative Votes. General Overview of Different Levels of Balloting Subcommittee New Standards Major Revisions Provisional Standards.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
WS-Resource Framework: Globus Alliance Perspectives Ian Foster Argonne National Laboratory University of Chicago Globus Alliance
1 An Update on XML.org Registry and Repository Una Kearns Documentum, Inc.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Camas, WA - PWG F2F Meeting August 13, 2008.
The MPI Forum: Getting Started Rich Graham Oak Ridge National Laboratory.
Welcome to W3C RIF F2F4 4-5 November 06 – Athens, GA.
SEM16-05 Maintenance & withdrawal of documents ETSI Seminar © ETSI All rights reserved.
SEM14-05 Approving your draft ETSI Seminar © ETSI All rights reserved.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
0 - 0.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
Addition Facts
1 AIC – Conference Montreal – May Standards Update CUSPAP, IVS & IFRS Ray Bower, AACI Louis Poirier, AACI.
TC Admin Open Mic Session Copyright © OASIS 2012 TC Administration Update Report to Members February 8 th / 9 th 2012.
Doc.: 18-14/0021 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
WS-RT Update Ian Robinson. WS-RT and WSRF Page 2 WS-ResourceTransfer – from Roadmap document [1] WS-Transfer (Sep 2004) WS-Metadata Exchange 1.1 (new)
WS-RF TCFeb 2005 F2F 1 WS-RF Technical Committee Feb 2005 Face-to-face Agenda.
PbD-SE Technical Committee First Meeting December 05, 2012.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Doc.: IEEE /215 Submission July 2000 David Bagby, 3ComSlide F IAPP RP Meeting Agenda (& Meeting Report) July 2000.
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Addition 1’s to 20.
Brief introduction to Primary Care (GP) SOAR users Last updated: 24 th August 2012.
Test B, 100 Subtraction Facts
Week 1.
How to Fill out a PAR for a New Standard Revised 8 July 2010.
OASIS OSLC CCM TC Inaugural Meeting 04 February /04/14OASIS Presentation to OSLC CCM TC.
Peter Niblett William Vambenepe WS-Notification Face-to-Face May 2005.
Peter Niblett William Vambenepe WS-Notification Face-to-Face May 2005.
Proposed TC Issues Process Martin Chapman. Purpose An issues driven process helps to 1.Untangle un-conflate problems 2.Narrow focus to solving particular.
OData Technical Committee Kick-off July 26, 2012.
WS-RF TCMay 2005 F2F 1 WS-RF Technical Committee May 2005 Face-to-face Agenda.
Peter Niblett WS-Notification Face-to-Face 12 Sep-15 Sep 2005.
Peter Niblett WS-Notification Face-to-Face 12 Sep-15 Sep 2005.
FIMS Specification Group EBU-AMWA FIMS August 2011.
CMIS4DAM TC Inaugural Meeting 03 December /03/14OASIS Presentation to CMIS4DAM TC.
OASIS WSDM TC Face To Face Agenda January, 2005 IBM, Boulder, CO.
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
© 2004 IBM Corporation WS-ResourceFramework Service Groups Tom Maguire.
© 2005 Global Grid Forum The information contained herein is subject to change without notice Leading the pervasive adoption of grid computing for research.
OASIS OSLC CCM TC Inaugural Meeting 04 February 2014
OASIS TC Process Overview
OCPP TC Inaugural Meeting 07 September 2016
OASIS eTMF TC Inaugural Meeting 16 December 2013
OASIS Overview TC Process
CSAF TC Inaugural Meeting 16 November 2016
CTI TC Monthly Meeting Updates Session #1: 11:00 AM EST
WS-Resource Framework: Globus Alliance Perspectives
OASIS OSLC Core TC Inaugural Meeting 12 November 2013
OASIS Overview TC Process & Administration
OSLC Domains TC Inaugural Meeting 30 September 2016
ARIP TC Inaugural Meeting 22 May 2015
CTI TC Inaugural Meeting 18 June 2015
Legal Citation Markup TC Inaugural Meeting 12 February 2014
OSLC PROMCODE TC Inaugural Meeting 26 March 2014
IBOPS TC Inaugural Meeting 23 September 2014
OSLC Automation TC Inaugural Meeting 25 March 2014
COEL TC Inaugural Meeting 15 July 2015
BIOSERV TC Inaugural Meeting 08 July 2015
OASIS VIRTIO TC Inaugural Meeting 30 July 2013
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
Presentation transcript:

WS-RF TCMay 2005 F2F 1 WS-RF Technical Committee May 2005 Face-to-face Agenda

WS-RF TCMay 2005 F2F 2 Agenda – Monday 16 th 13:00 - Opening remarks, welcome (Chairs) – Roll call –Approve last telecon minutes –Review Action items from last telecon –Call for AOB for this F2F 13:30 – 14:30 Validate closure of following issues from updated documents (Doc editors) –Docs: WS-Resource, WS-ResourceProperties, WS-ResourceLifetime, WS-BaseFaults, WS- ServiceGroup, AppNotes –(Doc editors to upload new drafts before start of meeting) 14:30 – 15:30 Issue review (Chairs) –Remaining issues affecting WS-Resource, WSRF-RP, WSRF-RL, WSRF-BF, AppNotes. –Find new editor(s) for AppNotes. –Objective – clear way for editors to produce committee draft and public review draft. 15:30 – 16:30 (Ian) –Roadmap to OASIS Standard –Committee draft  Public review  Committee specification  OASIS standard –Outline dates for all TC outputs 16:30 – 18:00 Primer Review (Tim) –Tim to lead review of Primer (to be distributed prior to F2F). 18:00 – Close

WS-RF TCMay 2005 F2F 3 Action items (Bryan) Move issue WSRF109 to open (Editors) Further call for comments on AppNotes additions document –Further to comments already recv’d (IanR/TomM) Organise a call on RMD advertise via the TC web site. (Bryan) move issues WSRF103, WSRF106, WSRF104 to resolved (Bryan) move issues WSRF105 to open.

WS-RF TCMay 2005 F2F 4 Agenda – Monday 16 th (detail) 13:30 – 14:30 Validate closure of following issues from updated documents –WSRF89: Document-literal serialization –WSRF91: Resource Access Pattern reaction to the removal of ReferenceProperties –WSRF92: Update examples to be compliant with the recent version of WS-Addressing –WSRF99: Examples in the specs use the SOAP 1.2 namespace –WSRF101: Use of non-normative references –WSRF97 QueryResourceProperties WSDL portType does not reference the property it requires as specified in XML schema –WSRF98: Cardinality of SetResourceProperty content –WSRF102: InvalidDeleteResourcePropertiesRequestContent needed –WSRF63: Which lifetime attributes (ala OGSI) should be specified for resource properties –WSRF100: Confusion about requirement of using WS-BaseFaults for all faults from WS- Resources –WSRF106: Not clear how to map faults for SOAP 1.1 and SOAP –WSRF22: QNames as attribute values or text nodes is problematic with signatures/encryption and intermediaries –WSRF103: Multiple Service Port elements legitimate? Need to confirm wsa:Action in WSDL –WSRF44: No obvious mechanism to include only members which extend a certain interface –WSRF58: ServiceGroup WSDL does not need imports for WSRF-RL WSDL/schema –WSRF59: Inconsistencies in ServiceGroups –WSRF65: Need a mechanism to aggregate an operation across several resources in a ServiceGroup –WSRF69: Content should be declared with minOccurs="0" –WSRF87: InitialTerminationTime in Add method needs to have stronger guarantee –WSRF104: Content Rule Applies in Two Ways

WS-RF TCMay 2005 F2F 5 Agenda – Monday 16 th (detail) 14:30 – 15:30 Issue review (Chairs) –WSRF107: Consider whether the WS- MessageDelivery embodiment is still needed –WSRF109: Clarify authoritative precedence earlier (Terminology) –WSRF110: BaseFaults does not allow open content –WSRF111: Missing fault message for unexpected faults –Any new issues

WS-RF TCMay 2005 F2F 6 Standards Approval Process Working draft –any version of a specification or other document produced by the TC which has not yet received any level of approval from the TC. –we used to call these editor drafts. Committee draft –an interim document approved by a TC full majority vote of the TC required –no notification to OASIS required –we used to call these working drafts Public Review Draft –a Committee Draft that has been approved by the TC to go to public review full majority vote of the TC required –TC Administrator announces on the OASIS members list –TC Administrator issues a Call For IPR Disclosure. –Public comments addressed to public wsrf-comment list –If changes are required the specification must be withdrawn from review then resubmitted. The TC may conduct any number of review cycles (i.e. approval to send a Committee Draft to Public Review, collecting comments, making edits to the specification, etc.). –1 st public review of a specification must take place for a minimum of 60 days; any subsequent reviews must be held for a minimum of 15 days. Committee specification –a Public Review Draft that has completed public review and achieved final approval by a Technical Committee –The TC Administrator conducts a ballot to approve the Committee Specification. OASIS standard –a Committee Specification that has been submitted by a Technical Committee and reviewed and approved by OASIS membership

WS-RF TCMay 2005 F2F 7 Agenda – Tuesday 17 th 8:30 – 12:00 ServiceGroup spec (Tom M/Dave S) –Remaining issues affecting WS-ServiceGroup: WSRF105: ServiceGroupEntry as a WS-Resource is too Heavyweight. –Working session to close down ServiceGroup spec (section by section) to produce committee draft and possibly public review draft. Noon - Lunch (45 mins) 12:45 – 15:00 ResourceMetadata spec (Tom M, William V) –Report back on the progress and outcome of the RMD telecon. –Working session to close down RMD spec (section by section) to produce committee draft and possibly public review draft. 15:00 – 15:30 Roadmap for remaining TC outputs (Ian) –Outline dates to OASIS standard for ResourceMetadata, Primer, AppNotes 15:30 – 18:00 Break-out sessions –Editors to produce committee draft specifications for: WS-Resource, ResourceProperties, ResourceLifetime, ServiceGroup, BaseFaults, ResourceMetadata, AppNotes, Primer –Editors to prepare public review drafts for: WS-Resource, ResourceProperties, ResourceLifetime, BaseFaults and (if possible) ServiceGroup. –Refresh Requirements document 18:00 – Close

WS-RF TCMay 2005 F2F 8 Agenda – Wednesday 18 th 9:00 – 10:00 Conclude editorial work 10:00 – 10:30 Approval ballots (Chairs) –committee drafts and public review drafts 10:30 – 11:00 Follow-on planning (Chairs) –Location for next F2F 12 Sep 19 Sep 11:00 – 12:00 AOB 12:00 Close