InvisibleSHIELD™ Installation invisibleSHIELD™ Product Installation Training Carefully review product installation instructions Practice product installation.

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

The cleaning procedures for Operating Suites are broken into 2 groups.
Sectional Assembly and Installation
packaging, labeling & marking
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3-Develop Solutions Unit 4-Implement a Solution Unit 5-Test and Evaluate.
Kitchen Safety SAFETY WITH SHARPS PPT
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions Edvotek Set Up 12 groups.
Use of the Spectronic 20 Spectrophotometer
Industrial Graphic Solutions Designed to Meet Your Sophisticated Markings Needs. EXPECT MORE FROM MUIR..
2313 W Sam Houston Parkway N Suite 105 Houston, Texas ROK Shield Application Instructions ROK Shield is a non-toxic,
How to Make a Peanut Butter and Jelly Sandwich By Kristy and Jon.
 When using the rotary cutter always walk with the blade closed. To open the blade place four fingers around the handle and slide the blade guard button.
Power Tools Safety. Portable Circular Saws Stock must be well supported in such a way that the kerf will not close and bind the blade.. Thin materials.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
1 Making and staining a wet mount Refer to the Practical Manual Introduction Sections F.1 and F.2.
Kitchen Safety & Sanitation
Step #1 Wash hands using proper hand washing technique Note: please see “Hand Washing” Power Point for more details Cafeteria: Canned Fruit Prep.
Stamped Slab Vessel with Handle(s). Create a paper template where you plan how you will use the stamps you have created. It will indicate the height and.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
Cutting With a Jeweler’s Saw
The Drafting Avenger Drafting Tools Yo!.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions VWR Set Up 12 groups Mira Costa kit.
Fingerstick Procedure
1 USDOC41 Rev 0 1/04 Training and Education Program ©2004 HemoCue, Inc. HemoCue ® Training and Education Program The HemoCue Hb System.
StatSensor® Creatinine Operator Training Program
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Typical Walk-in Closet with elfa® décor
Using a Microscope to View Cells
This is made specially for beginners. Watch the whole series before starting the work. Have also tools and clay prepared first. Enjoy it.
Tank and Inline Chiller Setup. Equipment list  Bleach  Aquarium (min 10 Gal)  Chiller (there are several types)  Insulated box or some kind of tank.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Building a Computer Kate Chapin Capstone Project.
Burns PAGES LEQ: HOW DOES THE TYPE OF BURN DETERMINE THE TYPE OF TREATMENT PROVIDED?
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
Preparing & Exposing Photographic Silkscreens For use with Lesson 3 FOR EDUCATION USE ONLY ©2009 The Andy Warhol Museum, a museum of Carnegie Institute.
VISUAL COMMUNICATIONS GRAPHICS MR. SHEA
Hand Cut SCREEN PRINTING Stuarts Draft High School.
VNIR Training: Preparing Sample for Scanning Soil Survey Research and Laboratory National Soil Survey Center Lincoln, NE.
KITCHEN SAFETY PREVENTING HAZARDS IN THE KITCHEN
Abstract Landscapes Watercolour painting. Water colours Watercolours are a transparent medium meaning that the paper shows through the paint. This gives.
How to make a paper airplane
SCROLL SAW SAFETY VIDEO. 1. Only make adjustments to the saw or your material when the saw is powered off 2. Install the blade with the teeth facing down.
Elizabeth Wilmoth Period 2.  Identify problems that can occur if hardware is not properly maintained.  Identify routine maintenance that can be performed.
Basic Screen Printing Procedures for T-Shirts GOP_5-2 Screen Printing.
Changing your car's oil yourself is not only a money saver—it’s also a lot easier than it sounds! By Rachel Ammann ENGL 393.
Gail Vanairsdale Global Clinical Education Manager Enlite Sensor Insertion.
Administration of Vaccine via Intramuscular Route
Name: ___________________
Dayview™ LCD Film – Installation Procedures. Equipment Required : Latex gloves and face mask Glue cleaner (alcohol) & glass cleaner Special glue, spray.
Measuring Tutorial Gabby Witcpalek.  First gather your tools  Spoon  1/3Dry Measuring cup  Brown sugar  Straight edge spatula 2/3 Cup of Brown Sugar.
Lathrop Intermediate School
Chapter 12: The Resident’s unit
Appropriate Care for iPads How to keep it clean and avoid paying fines.
Carding Cotton Lint. Materials Needed: Good quality ginned cotton, set of carders (preferably cotton carders with finer teeth than wool carders), and.
Principles of Manufacturing Copyright © Texas Education Agency, All rights reserved 1.
KITCHEN LAB DUTIES. YOUR RESPONSIBILITIES Our kitchen works as a team, between your own classmates and the four other classes that use it every day. You.
Throwin’ Caution Masking Tape Throwin’ Caution Position graphic exactly where you want it on surface using tape, make sure to tape The middle section securely.
STEP 1 Take one piece of the adhesive backing sheets and one Kenrico detox pad.
Day 2: Microscope Skills Learning Targets: I will learn about the proper care of a compound microscope I will be able to prepare my own slide (wet mount).
Chapter 19 Decals, Custom Painting, and Trim. Objectives Properly remove and install vinyl decals and striping Prepare the surface before applying adhesive.
Flute Care By Michelle Hoff. Flute Care  Brush your teeth or rinse out your mouth before you play.  Wipe off finger prints after you play with a clean,
Latent Prints Forensic Science T. Trimpe
6) Take out tickets for Extra Credit
All About Chandelier Cleaning
Materials Open silkscreen Scoop coater Photosensitive emulsion
Materials Open silkscreen Scoop coater Photosensitive emulsion
Home Use Fingerstick Technique Training
How to insert a tampon.
Stage 9: Making a food product
Presentation transcript:

invisibleSHIELD™ Installation invisibleSHIELD™ Product Installation Training Carefully review product installation instructions Practice product installation Watch videos included (links) Congratulations! You are now proficient in installing the invisibleSHIELD™.

invisibleSHIELD™ Installation BEFORE YOU BEGIN Turn your device off. Your device will need to be off for 12 to 24 hours following installation to allow the invisibleSHIELD™ to properly cure.

invisibleSHIELD™ Installation 01. WASH YOUR HANDS Before beginning, wash your hands thoroughly and wipe down the device to remove smudges, particles and skin oils. Place the device on a clean, stable surface, free of lint and debris.

invisibleSHIELD™ Installation 02. HANDLING OF invisibleSHIELD™ In order to avoid getting fingerprints on your invisibleSHIELD™, wet your fingertips with Application Solution before handling the invisibleSHIELD™. Carefully peel the invisibleSHIELD™ from the backing, spraying solution on the sticky side of the invisibleSHIELD™ as you peel. If you need a second set of hands, ask a friend to help handle the invisibleSHIELD™.

invisibleSHIELD™ Installation 03. APPLICATION SOLUTION Once removed from the paper backing, hold the invisibleSHIELD™ and lightly moisten the front and back of it with Application Solution. Be sure to dampen the invisibleSHIELD™, NOT your device.

invisibleSHIELD™ Installation 04. invisibleSHIELD™ ALIGNMENT Place the invisibleSHIELD™ onto your device, sticky side down. Use enough solution to allow the invisibleSHIELD™ to slide on the surface of your device. Align the invisibleSHIELD™ using the top or bottom edge of your device as a reference point. For best results, apply sufficient solution to the film. If the alignment is not perfect, gently remove the invisibleSHIELD™ and try again. If the invisibleSHIELD™ appears stretched, set aside for 3 to 5 minutes to heal, then re-moisten and try again.

invisibleSHIELD™ Installation 05a. invisibleSHIELD™ PLACEMENT Moisten the Installation Squeegee with Application Solution to help it glide more easily over the surface of the film. Hold the invisibleSHIELD™ down on the device with one hand, while using your other hand to squeegee out the excess moisture. We recommend you begin at the center of the device, and work towards the edges, removing any bubbles as you go.

invisibleSHIELD™ Installation 05b. invisibleSHIELD™ PLACEMENT The pressure applied by the squeegee will adhere the invisibleSHIELD™ firmly onto your device, thus preventing it from slipping out of alignment. Be sure to squeegee away from any open or uncovered ports.

invisibleSHIELD™ Installation 06. EXCESS MOISTURE & CURING Soak up any excess moisture with a lint-free or microfiber cloth. Micro- bubbles and imperfections will work themselves out in 2 to 3 days. Remember to leave your device off for the next 12 to 24 hours to allow for proper curing.

invisibleSHIELD™ Installation Installation Summary Easy and straight forward process Can be completed in a small time frame Short learning curve Requires no additional tools not included in package