R Meakin NDIA Meeting 03/08/2011 Page-1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Multi-Disciplinary, Physics-Based.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Symantec 2010 Windows 7 Migration Global Results.
Requirements Engineering Processes – 2
Variations of the Turing Machine
Design and Evaluation of an Autonomic Workflow Engine Thomas Heinis, Cesare Pautasso, Gustavo Alsonso Dept. of Computer Science Swiss Federal Institute.
Using Metrics to Reduce Cost of Re-work Dwight Lamppert Senior Test Manager Franklin Templeton.
1
Configuration Management
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 4 Computing Platforms.
Processes and Operating Systems
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Fixture Measurements Doug Rytting.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
By Rick Clements Software Testing 101 By Rick Clements
1 Hyades Command Routing Message flow and data translation.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Measurements and Their Uncertainty 3.1
Making the System Operational
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Week 2 The Object-Oriented Approach to Requirements
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S.A.F. 1 Commodity Councils 101 NAME (S) SAF/AQCDATE.
Break Time Remaining 10:00.
Configuration management
Software change management
Chapter 5 – Enterprise Analysis
Scheduled Model Predictive Control of Wind turbines in Above Rated Wind Avishek Kumar Dr Karl Stol Department of Mechanical Engineering.
Testing Workflow Purpose
PP Test Review Sections 6-1 to 6-6
Employee & Manager Self Service Overview
1 AirWare : urban and industrial air quality assessment and management Release R5.3 beta DDr. Kurt Fedra Environmental Software & Services GmbH A-2352.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
1 Application of for Predicting Indoor Airflow and Thermal Comfort.
July 31, Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
Page 1 October 31, 2000 An Introduction to Large-Scale Software Development Steve Varnau Core HP-UX Operation October 31, 2000.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Success with ModelSmart3D Pre-Engineering Software Corporation Written by: Robert A. Wolf III, P.E. Copyright 2001, Pre-Engineering Software Corporation,
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Page 1 of 43 To the ETS – Bidding Query by Map Online Training Course Welcome This training module provides the procedures for using Query by Map for a.
Executional Architecture
7/16/08 1 New Mexico’s Indicator-based Information System for Public Health Data (NM-IBIS) Community Health Assessment Training July 16, 2008.
The European Organisation for the Safety of Air Navigation AIRM Review Forum AIRM Status Report.
: 3 00.
Analyzing Genes and Genomes
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Organization Theory and Health Services Management
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
3D Analysis with AASHTOWare Bridge Design and Rating
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
Presentation transcript:

R Meakin NDIA Meeting 03/08/2011 Page-1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Multi-Disciplinary, Physics-Based Simulation Software Products of the CREATE-AV Project Dr. Robert L. Meakin CREATE-AV Project Manager / IPA (UAB)

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-2 Develop and deploy a set of CBE Software Products that enable… Increased capacity of the acquisition engineering workforce of the services, Reduced workload through streamlined and more efficient acquisition engineering workflows, and Minimized need for rework due to early detection of design faults or performance anomalies, through exploitation of the capacity of next generation computer resources. P ROJECT M ISSION

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-3 ABC DRR FRP DR CD LRIP FRP Operations and SupportConcept RefinementTechnology DevelopmentSystem Development & DemoProduction & Deployment Sustainment Government Owned Processes Industry Owned Processes Ownership of Processes & Potential for Decision Impacts Phase of Acquisition Lifetime Cost 100 % 0 Decision Impact on Lifetime System Cost vs Phase of Acquisition in Which Decision is Made

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-4 ABC DRRFRP CD LRIP FRP Operations and SupportConcept RefinementTechnology DevelopmentSystem Development & DemoProduction & Deployment 1 of Targeted Set of Government Owned Engineering Processes Government Owned Processes Industry Owned Processes IDProcess NameUse Case AV-026Navy Conceptual Design Process Rapidly produce physics-based, optimized conceptual designs in days to weeks. Quantification of design concept performance and sensitivity to new technology. (Benefits: Better decision data at the earliest phases of acquisition have potential to positively impact all subsequent acquisition costs.)

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-5 Government Owned Processes Industry Owned Processes ABC DRRFRP CD LRIP FRP Operations and SupportConcept RefinementTechnology DevelopmentSystem Development & DemoProduction & Deployment IDProcess NameUse Case AV-006 Store Compatibility Cert Recommend for Store Separation Air Force Evaluate separation characteristics of all store combinations for a given aircraft. The number of configurations necessary to analyze is growing exponentially. (Benefits: Expansion of flight envelope / improve effectiveness & reduce cost of test programs) 1 of Targeted Set of Government Owned Engineering Processes

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-6 Separation Turbulence Vortices Jets Shocks Aero-structure interaction Wakes A commonality of governing physics make it possible for a relatively small set of CBE software products to impact a large number of important acquisition processes. 6 AN OBSERVATION…

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-7 CREATE-AV Products Conceptual Design tool High-Fidelity design verification tool for FIXED-WING aircraft High-Fidelity design verification tool for ROTARY-WING aircraft

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-8 Helios is a multi-disciplinary, physics-based software product developed to enable full-vehicle (rotary-wing) design analysis and testing via high-fidelity simulation. The key use cases envisioned for the product include the following … Design verification – verify vehicle performance Evaluate planned or potential operational use scenarios Perform flight certifications and qualifications Rehearse ground-based and full-scale flight tests Calibration of Lo-Fi analysis tools associated with conceptual design all prior to fabrication of test articles, full-scale prototypes, or implementation of aircraft modifications.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-9 v1.0 “Whitney” is in General Release v2.0 “Shasta” General Release in early Spring v3.0 “Rainier” General Release in early Spring 2012 Status

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-10 Helicopter fuselage aerodynamics Helicopter fuselage + engineering model of rotor Isolated rotor in hover Isolated rotor in forward flight v1.0 Key Technologies Dual-mesh paradigm High-order off-body solver Aero-structural coupling for rotor dynamics v1.0 “Whitney” Capability Summary Industry Beta-Testing via CRI (Center for Rotorcraft Innovation) Dual-mesh paradigm

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-11 ●Shadow-Ops application for Harrier AV-8 –Helios off-body high-order Cartesian grids provide much better resolution of shed vortices from wing ●Sikorsky X-2 hub drag studies –Helios produced similar drag results to Fluent solutions –“The software could be used by an average CFD practitioner with a basic level of training” 2 nd order unstructured grid solution alone 2 nd order near-body solution with high-order Cartesian off-body mesh v1.0 Examples

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-12 ●Boeing CH-47 fuselage drag studies –“Helios converged well in terms of density, residual, forces and moments” –“Helios solutions are similar to BCFD results” ●Boeing MELB fuselage drag studies –Helios solutions are similar to BCFD –Helios solutions converge much faster than BCFD

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-13 ●Bell 409 hub drag studies –Helios results match experimental data and also match results from UNCLE CFD code

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-14 v2.0 Key Technologies Automated AMR (Adaptive Mesh Refinement) Parallel FSI (Fluid Structure Interface) v2.0 “Shasta” Capability Summary Full vehicle (rotor and fuselage) Prescribed maneuver w/ tight coupling (aero-structural) Active rotors w/ flaps/slats Store separation w/ prescribed store motion Arbitrary shaft angles Multi-bladed rotors

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-15 Tilt Rotor Aeroacoustic Model (TRAM) –Quarter-scale model V-22 rotor/nacelle –DNW-LLF –M tip =0.58, Computational conditions –Rigid blade –Specified collective pitch –Rotor with center-body –M tip =0.625, Re Tip =2.1M –Spalart-Allmaras turbulence model Effects studied: 1.Dual-mesh paradigm 2.Grid resolution 3.Adaptive grids 4.Inertial (moving mesh) vs. non-inertial (fixed mesh) v2.0 Examples

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-16 Fully-Unstructured vs. Dual Mesh Fully UnstructuredDual Mesh (Fixed) Q-criterion - iso-surface colored by vorticity 14 o collective, M tip = M nodes Subset 2.8M

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-17 CTCT CQCQ FM experiment Fine-A - 8lev AMR Near-body refinement Off-body refinement

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-18 Time (hours)# points Unstructured solver18.23 (43%)9.4M Cartesian solver23.46 (55%)110.2M Adaptive overhead1.02 (2%)-- Total42.71 hours119.6M Solution in a day-and-a-half 50K total steps Adapt every 100 steps 128 core linux cluster Fixed Spacing AMR Gridpoints (Millions) 10% Ctip Resolution 5% Ctip 3% Ctip 1% Ctip Current Future TRAM Adaptive Wake Solution

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-19 Theory Adaptive Mesh Refinement –Low Speed Case UH60 Rotor in Forward Flight

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-20 ●HART-II rotor wake simulations ●UH-60 rotor and fuselage simulations ●Boeing Mesa MELB applications –Main rotor hover performance predictions for isolated and installed cases –Predictions of rotor download on fuselage ●Boeing Philadelphia CH-47 applications –Main rotor hover performance predictions for isolated and installed cases –Predictions of rotor download on fuselage ●Sikorsky X-2 rotor and fuselage –Main rotor performance prediction –Rotor and fuselage interactions ●Bell isolated rotor systems –M427 forward flight performance predictions Upcoming v2.0 Gov/Industry Beta Testing

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-21 v3.0 “Rainier” Capability Summary Beta release slated for Jan Capability Enhancements Full Rotorcraft configurations –Fuselage + multiple rotors, tail rotor, etc. Resolution of time-step mismatch problem between main rotor and tail rotor –high tail rotor-RPM results in very small global time steps for main rotor simulation Free-flight trim with CFD-based fuselage loads General control surfaces –Support for integral/conformal control surfaces (single grid with re-meshing or mesh motion) STATUS: FDR Complete (Aug 2010)

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-22 Capability Enhancements (con’t) Engine module integration for propulsion effects –0-D engine model from CREATE-A/V Firebolt program) Store separation with 6-DOF motions –Most of this software will be adapted from existing Kestrel modules using published interface definitions − Prescribed mesh motion − Rigid mesh motion − Mesh deformation − 6-degree of freedom body motion

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-23 Strand solver prototype to enable –High automation for problem setup –High scalability for solver and domain connectivity –AMR and High-Order near vehicle surfaces –Small memory footprint, which maps well to hierarchical memory machine architectures v3.0 “Rainier” Key Technologies Strand pointing vector Strand point distribution This is a new meshing paradigm introduced in 2007 by current members of the CREATE-AV technical staff. The technology is being matured in the Helios product and will be deployed through both Helios and Kestrel.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-24 3-D Structural Dynamics and Trim –3D FEM prototype for rotor blades –Internal evaluations and Shadow- Ops testing only Improvements to automated dynamic off-body adaption procedure –Fixed-resource specification for mesh adaption –New options for error estimation

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page Code capability )Arbitrary full rotorcraft configurations High fidelity aerodynamics (hover, fwd-flight, sep flow, etc) High fidelity structural dynamics (fuselage and blades) Multiple vehicles w/ land and ship takeoff/land sim capability Adaptive mesh refinement for evolving near-body dynamics and vortex wake capturing Full complement of operational conditions and environments (e.g., hot, heavy, high altitude, dynamic ship deck/sea-states, brownout, icing, etc) 1)Arbitrary complete fuselage (rigid) Engineering model of rotor Isolated rotors (hover and forward flight) Aero-elastic blades w/trim 2)Full rotorcraft configurations (fuselage, rotor, fan) Elastic rotor and fan blades Automated mesh adaptation for accurate wake capturing 3)Arbitrary full rotorcraft configurations Multiple rotors/fans Propulsion effects Improved fidelity of aerodynamics Introduction of fuselage structural dynamics Capability Delivery Schedule

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-26 Kestrel is the FIXED-WING counterpart of Helios. It is a multi- disciplinary, physics-based software product developed to enable full- vehicle (fixed-wing) design analysis and testing via high-fidelity simulation. The key use cases envisioned for the product include the following … Design verification – verify vehicle performance Evaluate planned or potential operational use scenarios Perform flight certifications and qualifications Rehearse ground-based and full-scale flight tests Calibration of Lo-Fi analysis tools associated with conceptual design all prior to fabrication of test articles, full-scale prototypes, or implementation of aircraft modifications. Product Status: v2.0 General Release in early Spring (2011)

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-27 Note: both Kestrel and Helios will deliver airframe propulsion system integration capability starting in v3.0 release year. Gas Turbine Engine (GTE) simulation capability is provided through CREATE-AV Module “Firebolt”.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-28 C-17/F M=0.23 AOA=0 o Alt.=6000’ PLA =80.5 o Total Temperature Isosurface Colored by Cp Jump Door Kestrel (Firebolt enabled) C-17 Exhaust Simulation

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-29 A Key CREATE-AV MODULE v1.0 of the Firebolt module Enables airframe/propulsion integration analysis via “engineering models” of Gas Turbine Engines (GTEs). Appropriate for… use in DaVinci for propulsion system analysis in conceptual design studies use in Kestrel and Helios to include propulsion effects in high-fidelity multi- physics simulations. v2.0 through vN.0 (updates released annually) of the Firebolt module Delivers increasingly higher and more complete physical fidelity for GTEs in engine alone and complete aircraft simulation to the Kestrel and Helios communities.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-30 Conceptual design tool, enabling multi-disciplinary, physics-based (multi-fidelity) generation of actionable decision data at the earliest stages of defense acquisition. Enables designers to rapidly produce high quality parametric associative mesh-able geometry & system models for design space exploration in support decision making. Enables model propagation from conceptual to preliminary/detailed design Example Use Cases Explore, optimize, and understand the system trade-space and tradeoffs Effectively execute conceptual studies, including uncertainty quantification, & sensitivity analysis Product Status: v1.0 General Release in Summer of 2011

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-31 Deploy to targeted government workforce for DoD owned acquisition engineering processes. Engage industry via technical advisory boards and professional societies. Operations and Support I Initial Conceptual Design & Roadmap Final Product Design Technology DemonstrationEngineering DevelopmentProduct Deployment “Next Gen” Annual Product Development Loop “Next Gen” Annual Product Development Loop Annual Product Prototyping Loop OO Final Product Implementation Loop O v v8.0 ANNUAL release cycle – increasing functionality, physical accuracy, computational efficiency, usability Expand industry involvement via Beta-test events Full deploy to government and industry for DoD acquisition engineering C ADENCE OF D EVELOPMENT

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-32 FMAMJJASONDJF FebComplete General Release– Version N-1 FebComplete PDR – Version N AprComplete FDR – Version N AprComplete Product Branch – Version N MayComplete Integration– Version N JunReconcile Requirements– Version N+1 SepFreeze Release– Version N OctComplete Alpha Testing– Version N NovComplete Product Acceptance Test (PAT) Release– Version N DecComplete Product Acceptance Tests (PATs) – Version N JanComplete Beta Release– Version N FebComplete General Release– Version N FebDeclare End of Life for Release– Version N-2 FebComplete PDR– Version N+1 ANNUAL Product Development Milestones For Context, consider an example schedule of CREATE-AV Project

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-33 Shadow-Operations 33 Annually between 4 and 6 acquisition programs are “shadowed” in terms of engineering workflows… –Build bridges between product developers and targeted acquisition engineering orgs –Learn workflows and actual requirements of targeted org –Key roles in product VV&QA (Verification, Validation, & Quality Control)  Build computational baselines  Build archive of validation cases (VERY big deal) P RODUCT D EPLOYMENT AND S UPPORT

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-34 Examples of Shadow-Ops Projects SO2010-4: E-2D Power effects SO2010-1: STUAS Flight Certification SO2009-4: CH-47 Advanced Rotor Assessment SO2009-5: AV-8B Tail Aero-Structure Interaction

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-35 Product Support Plan Summary Request for Help Product Specific Support Technical Support User w/ Question Self Helps (FAQ, User’s Forum, User’s Guide, Tutorials) Quality Assurance POC Product POC (e.g., Kestrel) CREATE-AV Support Page e.g., Kestrel Support Page Submit On- Line CREATE Home Page Issue Coordinator

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-36

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-37

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-38

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-39

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. R Meakin NDIA Meeting 03/08/2011 Page-40 Identified capabilities that can be delivered by CBE and next generation computer resources to positively impact the acquisition engineering processes and workflows –Based on review of DoD acquisition engineering workforce processes and workflows Have developed and are implementing plans to deliver highest impact capabilities through ANNUAL product releases Early-phase workflows have the greatest potential for long-term positive impact on defense acquisition –Ability to generate physics-based decision data in a timely way during conceptual design is paradigm changing Sustainment-phase workflows have greatest potential for immediate impact on Warfighters (i.e., during aircraft service-life) –Flight clearance, modified/new configuration/loading certification, launch and recovery envelope generation, envelope expansion, mishap investigation, … S UMMARY