ANNUAL RESULTS 2009 20th April 2010 Hong Kong. 2009 Results Summary 2009 Market Environment Review 2009 Corporate Business Progress 2010 Corporate and.

Slides:



Advertisements
Similar presentations
Recycling Waste Heat – CHP as an alternative
Advertisements

1 st ASEAN – EU Business Summit (AEBS) Infrastructure Sector Sandiaga S. Uno Founding Partner of Saratoga Capital ASEAN EU Business Summit 2011 Jakarta,
Interim Results th August 2011 Hong Kong. Results Summary in 1H Business Performance by Sector in 1H Market and Policy Review in 1H Operation Outlook.
A 2030 framework for climate and energy policies Marten Westrup
1 The Next Decade of Air China Mr. Kong Dong President, China National Aviation Holding Co. Chairman, Air China Limited Beijing
The challenge in UK power generation Steve Riley, Executive Director, Europe London, 3 December 2010.
INVESTMENTS IN POWER SECTOR
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
China: Water Management and Accounting Project May 22-24, 2006 Hague.
Arthur Berger Regional Products and Income Accounts, Beijing, China, March 2010 Canadas Provincial and Territorial Economic Accounts.
Chinas Economic Prospects: 2006 – 2020 Li Shantong.
TABLE OF CONTENTS CHAPTER 1.0: Trends in the Overall Health Care Market Chart 1.1: Total National Health Expenditures, 1980 – 2005 Chart 1.2: Percent Change.
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
EU LEGISLATION ON WASTE European Commission WORKSHOP ON EU LEGISLATION WASTE © 2010 Microsoft Corporation. All rights reserved. Waste in EU economy.
World Bank Framework for Energy Trade in South East Europe David Kennedy World Bank.
This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Half Year Presentation 7 February This presentation relates to the Freightways Limited NZX announcement and media release of 7 February As.
2005 Operating Review & 2006 Strategy outline January, 2006 China Oilfield Services Limited.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Capitalizing on Past To meet Future Growth
Renewable Energy Workshop 2012 Global Market Impacts on Wind and PV Technologies A Presentation to the Bucknell University Renewable Energy Workshop –
31 Mount Pleasant, London WC1X 0AD UK Tel Fax LONDON | BEIJING | PHILADELPHIA | WASHINGTON The Energy.
Andrea Mariottini Riello Gas Boilers Division
UK enabling Legislation Renewable Energy Strategy.
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
Money, Interest Rates, and Exchange Rates
Capacity Planning For Products and Services
Brazil: Sustainable Growth, income distribution and social inclusion Miami Minister Paulo Bernardo April 6th, 2008.
Research Department 1 Global Economic Crisis and the Israeli Economy Herzliya conference Dr. Karnit Flug Research Director, Bank of Israel February 2009.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Climate Change Mitigation in Developing Countries: South Africa Prepared for the Pew Center on Global Climate Change by Ogunlade.
SUOMEN PANKKI | FINLANDS BANK | BANK OF FINLAND Growth rates high, but GDP not yet at its 2008 level 1Erkki Liikanen
The Impact of Current Doha Round Agricultural Negotiations on the Canadian Dairy Industry Xiangxiang Ye April 4th 2006.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
1 RICE HUSK UTILIZATION IN THE MEKONG, RIVER DELTA, VIETNAM PHAM THI MAI THAO Angiang University The 2 nd International Conference on Sustainability Science.
Subsidy Types, their impacts on tariff and ways of treating them.
Energy. oil and natural gas  supply 62% all energy consumed worldwide  how to transition to new sources?  use until mc of further use exceeds mc of.
1 Reform of Electricity Industry & Construction of Electricity Market In China Northeast East South Centre Northwest North Sitsang Taiwan Zhang Diansheng.
Towards a Low Carbon Future: China’s Green Development Policy and Practice Ye QI Climate and Carbon Policy Institute (CPI) Tsinghua University & China.
LOGO 2013 INTERIM RESULTS CORPORATE PRESENTATION ( H Share:02866 / A Share: )
Business Portfolio Adding Value to Investors Luiz Fernando Rolla CFO October, 2008.
The Status Quo, Barriers, and Countermeasures to Small Hydropower Development in Rural China Hydropower and Rural Electrification Development Bureau, the.
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
China’s Sustainable Energy Policy
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
April 23, 2013 NATIONAL COAL CONFERENCE Chairman Robert F. Powelson Pennsylvania Public Utility Commission.
0 March 2009 Annual Results Announcement Agenda Financial Highlights Business Review Strategies and Plans Open Forum.
1 Status of and Outlook for Coal Supply and Demand in the U.S. Imagine West Virginia Spring 2010 Board of Governors Meeting April 13, 2010 Scott Sitzer.
Natural Resource Partners L.P. Investor Meetings New York and Boston May 2007.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
© OECD/IEA Mtoe Other renewables Hydro Nuclear Biomass Gas.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
WORLD ENERGY PICTURE. Figure 1 World Energy Consumption Projections indicate continued growth in world energy use, despite world oil prices that are.
April 19, 2004 International Energy Outlook 2004 Guy Caruso Administrator Energy Information Administration Thirty-First Annual International Energy Conference.
China's Location in the World 1 kilometer = miles.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
U.S. Energy Information Administration Independent Statistics & Analysis Outlook for coal and electricity for National Coal Council November.
CHINA GAS HOLDINGS LIMITED FY2013 ANNUAL RESULTS BRIEFING June 26, 2013.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
First Quarter 2013 Earnings Conference Call April 18, 2013.
Market Development of ESCO in China Dai Cunfeng Chinese Renewable Energy Industries Association (CREIA) Adviser of EMC Association (EMCA)
NS4960 Spring Term 2017 China: Shift Away from Coal
2007 Annual Results Presentation
二零一一年度業績報告 2011 Annual Results March, 2012
NS4960 Spring Term, 2018 China: Expanded Renewables
NS4960 Spring Term 2018 China: Shift Away from Coal
Presentation transcript:

ANNUAL RESULTS th April 2010 Hong Kong

2009 Results Summary 2009 Market Environment Review 2009 Corporate Business Progress 2010 Corporate and Market Outlook

3 Installed Capacity Utilization Hour Gross Generation Unit Coal Consumption Internal UsageEquivalent Availability Factor (MW) (%) (g/KWh)(Hour) (Billion KWh) 22.5% 8.9% % 1.5% Results Summary-Operation Data Source: Corporate Annual Report 2009

Results Summary-Operation Data Operating Revenue Basic EPS Net Profit Debt to Asset Ratio Net AssetsTotal Assets (Billion RMB) (%)(RMB/Share) (Billion RMB) 29.9% % 115.2% % Source: Corporate Annual Report 2009 (IFRS)

5 5 Cost Structure Analysis Notice: Due to the changes of other expenses changed in large scale, the column of others mainly reflects the S,G&A Source: Corporate Annual Report 2009 (IFRS) Cost Structure in 2009 Cost Structure in 2008 Restated) 2009 Operating Cost Breakdown YOY Changes

2009 Results Summary 2009 Market Environment Review 2009 Corporate Business Progress 2010 Corporate and Market Outlook

7 Coal Price Bottomed Out Spot Coal Price in Qinhuangdao Port RMB/Ton) Companys Average Standard Coal Price Changes in 2009 RMB/Ton Source: Corporate Information and Data BJ Spot Coal Price in Australia RMB/Ton)

8 On-grid tariffs in 2009 were raised mainly due to the tariff adjustments in 2H The tariff adjustments on 20th December 2009 were more for grid side, with marginal impact to the IPP side. Tariff Adjustment with Positive Effect Tariff Adjustment since 2008 (RMB/MWh) Datangs Average On-grid Tariff (RMB/MWh) Detailed Tariff Adjustments Affecting Datang ( ) Source: Corporate Information and Data Notice: Green part is for on-grid side and yellow part is for grid company side.

9 Power Demand Up with Rising Utilization Rate The nations power demand in 2009 demonstrated a strong rebound with a recovery of the domestic economy. Source: China Electricity Council National Monthly Power Generation YoY Growth

2009 Results Summary 2009 Market Environment Review 2009 Corporate Business Progress 2010 Corporate and Market Outlook

11 Power Capacity Raised Substantially In 2009, the company had 21 new generating units, with total capacity of 5645MW put into commercial operation and the generation capacity was raised substantially. Installed Capacity Growth in 2009 Source: Corporate Information and Data 14.5% 22.5%

12 Coal-fired Unit Fuel and Unit Structure Further Optimized Coal-fired Units Structure end of 2008 Units Below 300MWUnits of 300MW Units of 600MW Grade Capacity Structure end of 2007 Capacity Structure end of 2008 Capacity Structure end of 2009 Hydro power Unit Wind power Unit Coal-fired Units Structure end of 2009 Source: Corporate Information and Data

13 Utilization Rate Higher than National Average Average Utilization hours for All Units in 2009 In 2009, the Companys average utilization hours for coal-fired units achieved 5255 hours, 416 hours higher than the national average. Average Utilization hours for Coal-fired Units in 2009 Source: Corporate Information and Data

14 Material Progress in Merger and Acquisition In 2009, the Company has finalized the assets integration with China Datang Corporation in certain provinces, acquisition of Chongqing Yuneng Group and the restructuring of Xiduo Railway Corporation. Regional Power Assets Consolidation The company had finished acquiring Chongqing Yuneng group Raise the holding ratio of Pengshui, Yinpan and increased the installed capacity in Chongqing Assets Transfer with Parent Company Strategic Restructure of Rail Assets Accepted the parents assets in Inner Mongolia, Liaoning and Fujian provinces, and sold the assets in Shandong and overseas to the parent company. Expanded more room for development and raised the projects reserve and development potential Finished restructuring of Xiduo Railway Invested in railway in Inner Mongolia as a minority shareholder and assured the rail transportation for coal and chemical product Diversified the operational risks for rail assets Source: Corporate Information

15 New added quota of domestic banking facilities of 152billion RMB By the end of 2009, there was still 169billion RMB quota left Medium Term Notes Raised 3billion RMB 5 years term Coupon rate of 4.1% Raised 3billion RMB 10 years term Coupon rate of 5% Non-public Offering Corporate Bonds Banking Facilities The A share non- public offering was finalized before March 2010 and raised 3.248billion RMB with 530million new shares issued Effectively lower the debt ratio Corporate Finance with Multiple Instruments Source: Corporate Information and Data

16 Shipping Project Railway Project Coal Mine Project Shengli East Unit 2 Coal Mine produced 5.05million tons of coal Tashan Coal Mine produced 17 million tons of coal Yuzhou Coal Mine produced 6.45 million tons of coal The railway under construction by the Company as a minority shareholder is about 3000 km The railway in operation in which the company has minority shares transported about 70 million tons of cargo in 2009 Datang No. 2 Vessel was put into operation The self sufficient seaborne coal reached 2.63million tons in 2009 The Company has three vessels in operation by now Coal Self-sufficient Ratio Length of Rails under Construction KM Seaborne Coal Self- sufficient Ratio Non-power Business Progressed Smoothly Coal- Chemical Project Three among seven sections finalized proliferation in Duolun coal-to-PP project in 2009 As the first similar project being approved by the State, Keqi Coal based Natural Gas Project started construction Source: Corporate Information and Data

17 Emissions Reduction with Good Results Notice: The blue line represent the average emission rate of the five big power generation groups in China Since 2005, the Company has devoted more resources on environmental protection. The emission indicators of major pollutants had been improved year-on- year and are now far better than the national and industrial average standards. SO 2 Emission per KWh (g/KWh) NO X Emission per KWh (g/KWh) Ash Emission per KWh (g/KWh) Waste Water Emission per KWh (g/KWh) Source: Corporate Information and Data

2009 Results Summary 2009 Market Environment Review 2009 Corporate Business Progress 2010 Corporate and Market Outlook

19 Power Generation Business Heading up In 2010, the Company plans to add over 6000MW new operating capacity so as to improve the core power generation business. Expected Capacity Structure by the end of 2010 Expected Installed Capacity by the end of 2010 Source: Corporate Information and Data

20 More Breakthrough in Non-power Business Acquired the 70% stakes in the Inner Mongolia Baoli Coal Mine and gained 3 million tons of thermal coal production capacity Phase one of Shengli East Unit 2 Coal Mine plans to produce 10 million tons of coal Tashan Coal Mine plans to produce 20 million tons of coal Yuzhou Coal Mine plans to produce 7 million tons of coal Wujianfang and Kongduigou Coal Mines aimed to move forward in preliminary works In 2010 Duolun coal-to-PP project will finalize the proliferation of all sections, breaking through all the technical procedures and produce the end product Keqi Coal-based Natural Gas Project will finalize the target in construction Fuxin Coal-based Natural Gas Project was approved by the NDRC and started construction The Tanggang Railway plans to achieve 100 millions tons of cargo volumn in 2010 The projects under construction of Xiduo Railway Company progress smoothly The Baozhang Railway, Baxin Railway and Chijin Railway under construction will achieve more progress In 2010, the company will make important progress and breakthrough in coal mines, coal-chemicals, railway and other non-power businesses. Source: Corporate Information and Data

21 Challenges & Opportunities for Power Sector Power supply and demand roughly balanced The national power demand in 2010 is expected to grow 9% Newly commenced capacity is 85GW and 10GW of small coal- fired units will be closed and the growth in capacity is 8% Nation wide average utilization hours is about 4500, equal to or lower than that of 2009 Coal supply and demand balanced with higher coal prices Coal output was controlled due to local sector consolidation Demand for coal will rebound with Macro-economys recovery Railway and seaborne capabilities raised and transportation will be de-bottlenecked More urgent to reform the tariff pricing mechanism Tariff adjustments are far lagging behind coal price increases since 2006 It is more urgent to rationalize the on-grid tariff to reflect the fuel cost changes for the IPPs National Power Demand and Installed Capacity Growth in National Industrial Value Added in Comparison Source: China State Statistics Bureau, NDRC and China Electricity Council

Laying Foundation for New Strategy Management Quality Consistently Raised Whole Year Target Fulfilled Power Business in Safe Operation Duolun Coal- chemical Commenced Stage One Target Fulfilled 2010 is a crucial year for the Companys development. Faced with the challenges and opportunities, the Company will go on roll over the new strategy and manage to become a competitive conglomerate energy provider as early as possible. Source: Corporate Information

Thanks!