1 PRESENTATION ON INTRA – STATE ABT BY GENERAL MANAGER (SLDC) DELHI.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Completing the Accounting Cycle Accounting Principles, Ninth Edition
Basic accounting I recap.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
1
Job Order Costing Chapter 4.
Flexible Budgets, Variances, and Management Control: II
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
STATEMENT OF CASH FLOWS
Cost Behavior, Operating Leverage, and Profitability Analysis
Measurements and Their Uncertainty 3.1
Prepared by: Workforce Enterprise Services For: The Illinois Department of Commerce and Economic Opportunity Bureau of Workforce Development ENTRY OF EMPLOYER.
CALENDAR.
Accounting and Financial Reporting
Applicable for Persons Registered under Article 10
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
The 5S numbers game..
Biostatistics Unit 5 Samples Needs to be completed. 12/24/13.
Break Time Remaining 10:00.
Analyzing Transactions
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Introduction to Cost Behavior and Cost-Volume Relationships
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Red Tag Date 13/12/11 5S.
Demand, Supply, and Markets 1 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for.
PP Test Review Sections 6-1 to 6-6
An Introduction to International Economics
Cost-Volume-Profit Relationships
Outline Minimum Spanning Tree Maximal Flow Algorithm LP formulation 1.
Oil & Gas Final Sample Analysis April 27, Background Information TXU ED provided a list of ESI IDs with SIC codes indicating Oil & Gas (8,583)
Inven - Cost - 1Inventory Basic Valuation Methods.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Sharing of ISTS Charges & Losses Regulation
: 3 00.
5 minutes.
AU 350 SAS 111 Audit Sampling C Delano Gray June 14, 2008.
Clock will move after 1 minute
PSSA Preparation.
Reporting and Interpreting Owners’ Equity
Select a time to count down from the clock above
Import Tracking and Landed Cost Processing An Enhancement For AS/400 DMAS from  Copyright I/O International, 2001, 2005, 2008, 2012 Skip Intro Version.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Scheduling of Collective Transactions Through Power Exchange
Presentation transcript:

1 PRESENTATION ON INTRA – STATE ABT BY GENERAL MANAGER (SLDC) DELHI

2 INTRA – STATE ABT IN DELHI AS A FIRST IN THE WHOLE COUNTRY INTRA-STATE ABT HAS BEEN IMPLEMENTED FOR DELHI w.e.f AS PER THE ORDER OF DELHI ELECTRICITY REGULATORY COMMISSION DATED

3 Intra-state ABT is a techno-economic tool for bringing rational tariff structure for supply of electricity from State generators to the distribution Licensees. It is a mechanism for enforcing discipline in the Grid. Why Intra – State ABT

4 a)Benefits to the Power System Brings about grid discipline by maintaining frequency in prescribed band (49.5 to 50.5 Hz). Ensures optimum utilization of available generation capacities. Enhances opportunities for Open access, and Trading of electricity. Scope for encouraging competition among generators. Benefits of Intra – State ABT

5 b)Benefits to the Generator Encourages maximization of Generation during peak hours with incentives and discourages the same during off-peak hours with penalties linked with frequency. Enables systematic scheduling in terms of long term, short term as well as day ahead, duly considering plant availability and maintenance. Ensures better life of equipments due to efficient management of Demand Vs Supply. Thereby the ‘Hidden Costs’ due to damage is avoided. The three-part Tariff under ABT provides for proper recovery of fixed and variable costs of Generator.

6 c)Benefits to the Distribution Licensees Economic efficiency dictates that the least cost power should be dispatched in preference to costly power (Merit Order Dispatch). ABT provides for the same. Licensees can plan their requirement, both for peak and off peak demands. Enables efficient Load Management through their own Area Load Dispatch Centers.

7 d)Benefits to the End Users Enables open access, captive generation and trading of electricity. Ensures quality and reliable power supply. Scope for reduction in cost of power due to licensees opting for merit order dispatch in their scheduling.

8 Constituents of Intra-State System after restructuring of DVB DELHI VIDYUT BOARD Holding Co. GencoTransco BRPL Government of National Capital Territory of Delhi All the assets and liabilities of DVB are acquired by GNCTD All the liabilities of DVB are transferred to Holding Company, entire Equity of Holding Company is issued to GNCTD BYPLNDPLNDMCMES Distribution Licensees

9 CONSTITUENTS OF INTRA-STATE ABT in DELHI 1.BSES RAJDHANI POWER CO. LTD. 2.BSES YAMUNA POWER CO. LTD. 3.NORTH DELHI POWER CO. LTD. 4.NEW DELHI MUNICIPAL COUNCIL. 5.MILITARY ENGINEERING SERVICES. 6.IP STATION. 7.RPH STATION. 8.GT STATION. 9.PRAGATI STATION. 10.BADARPUR THERMAL POWER STATION.

10 Power Allocation to Distribution Licensees POWER PURCHASE AGREEMENTS HAVE BEEN ASSIGNED TO THE DISTRIBUTION LICENSEES BY THE ORDER OF DERC DATED THE SALIENT FEATURES OF PPA ASSIGNMENT ARE AS UNDER :- NDMC & MES have been allocated 350 MW & 50 MW respectively from the BTPS generating station as basic allocation. Allocation from other Central Sector and State Sector has been assigned to BRPL, BYPL & NDPL in line with their consumption pattern for the period to % of BTPS (after allocation to NDMC and MES) +DADRI NCTPS thermal)+ IP+RPH+PPCL+GT has been considered as un-allocated share and is placed at the disposal of the Govt of NCT of Delhi. In case the allocation of the un-allocated power is not made by the government the same would be allocated to the distribution licensees except NDMC and MES in proportion to the basic allocation.

11 Power Allocation Table ON THE BASIS OF DERC ORDER DATED , THE SOURCE- WISE ALLOCATION OF POWER TO THE DISTRIBUTION LICENSEES HAS BEEN COMPUTED AS UNDER FOR SCHEDULING PURPOSES :- LICENSEES 'ALLOCATION IN %' SOURCENDMCMESNDPLBRPLBYPLTOTAL C. SECTOR BTPS IP RPH GT PRAGATI HIMACHAL DVC

12 Details of Unallocated Quota of Power available with Govt of Delhi S. No. DescriptionFormulaUn-allocated power in MW 1.15% of Balance power of BTPS after allocation of 350 MW to NDMC & 50 MW to MES ( )*15%46 MW 2.15 % of Dadri (Thermal) Capacity (756)*15%113 MW 3.15 % of (IP+RPH+GT+PPCL)( )*15%140 MW TOTAL299 MW

13 Steps Taken By SLDC Delhi For Implementation of Intra-State ABT The Scheduling & Dispatch procedures finalized with stake holders on All Distribution Licensees authorized SLDC to schedule available resources as per the requirement of Grid in line with the IEGC provisions section 6.5(5) which stipulates as under : “The SLDCs may also give standing instructions to the RLDC such that the RLDC itself may decide the drawal schedules for the States.” This ensures centralized scheduling for optimum utilization of available sources to Delhi as a whole. This procedure has been in existence since December 2002 i.e. the date of implementation of ABT in NR.

14 SCHEDULING GUIDELINES CONSTITUENTS 1. While requisitioning power requirement,minimum technical requirement to ensure the continuity of the generating stations and maximum availability should be taken care of by DISCOMs. The requisition from central sector gas stations should not be less than 70% of the respective availability capacity in normal conditions and 50% under emergency conditions. As far as Hydro and Nuclear stations are concerned, the entire availability would be utilized at all the times. However the storage capacity of Hydro stations is exploited by RLDC depending upon the requirement of the grid. 2. Requisition for BTPS should not be less than 80% due to size and age of the machines. 3. PPCL cannot go beyond 80% due to pollution stipulations. 4. Full requisition should be there for IP and RPH considering their age and core generation. 5.Due to size & pollution stipulation for IPGCL’s GT, it should not be less than 70%.

15 PROCESS FOR SCHEDULING BY 10:00 HRS—ISGS shall advise NRLDC the station wise MW and MWH capabilities. BY 10:00 HRS—BTPS,GENCO and PPCL shall declare the availability in 15 minutes time block in terms of MW and MWH. BY 11:00 HRS—Entitlement of the state shall be posted by NRLDC in their website for central sector. BY 11:00 HRS—SLDC shall post the GENCO,PPCL and BTPS availability in its website BY 13:00 HRS—NDPL,BRPL,BYPL,NDMC and MES shall intimate the SLDC, source-wise requirement of power for succeeding day in terms in MW and MWH in 15 minutes time block. BY 15:00 HRS—SLDC shall assess the requirement of power from all sources and intimate the same to NRLDC. BY 17:00 HRS—NRLDC shall convey the net drawal schedule for Delhi and posted in the website. BY 18:00 HRS—SLDC shall post the provisional Drawal Schedule and Generation Schedule of Generating stations within Delhi based on the provisional Drawal schedule of Delhi as a whole posted on the NRLDC website. BY 19:00 HRS—GENCOs/Licensees shall alter the schedule of generation /requirement and intimate the same to SLDC for forwarding the same to NRLDC for incorporation in final drawal schedule of Delhi. BY 22:00 HRS—SLDC shall inform the modification if any,for incorporating in the final drawal schedule to NRLDC. BY 23:00 HRS—NRLDC shall issue the final drawal schedule of Delhi state along with other states and posted in their website. BY 23:30 HRS—SLDC shall compute the drawal schedule of DISCOMs and generation schedule of generating stations within Delhi based upon the availability from central sector stations bilateral agreements entered into by various distribution licensees for the next day. Intra-day scheduling as per IEGC provisions is also permitted.

16 DRAWAL SCHEDULES IN INTRA-STATE ABT

17 GENERATION SCHEDULES IN INTRA-STATE ABT

18 ABT BILLING METHODOLOGY ABT is, basically, a three part tariff system consisting of the following components :- Fixed charges – on monthly basis subject to adjustment on yearly basis. Variable charges - on monthly basis. Unscheduled inter-change (UI) charges. – on weekly basis.

19 The Fixed Charges are to be paid to the Generating Source on the basis of allocation irrespective of the drawal provided the generating stations attain respective availability factor prescribed by the appropriate Regulatory Commissions. For Central sector Thermal and Gas Stations the availability factor is fixed at 80% whereas for Hydro Stations the availability factor (capacity index) is 90% except few stations i.e. Tanda & Talchar Thermal stations. The nuclear stations are not covered under the ABT. FIXED CHARGES The Variable Charges are to be paid to the Generating sources on the basis of scheduled allocation fixed by the Regional Load Despatch Centre keeping in mind the technical limits for regulation of generation. The limit is 70% of the maximum available capacity for thermal stations whereas that of Gas stations it is 60% in normal conditions and 50% in extreme emergency condition as fixed by RPC Forum. As far as Hydro and Nuclear stations are concerned, the entire availability would be utilized at all the times. However the storage capacity of Hydro stations is exploited by RLDC depending upon the requirement of the grid. VARIABLE CHARGES

20 The UI for a Generating Station shall be equal to its actual generation minus its scheduled generation. UI for States shall be equal to its total actual drawal minus its total scheduled drawal. UI shall be worked out for each 15 minutes time block. Charges for all UI transactions are based on average frequency of the time block. The UI Tariff structure as on is as under. UNSCHEDULED INTER-CHANGE (UI) CHARGES Average Frequency of time-block UI Rate (P/kWh) Hz and above 0.00 Below Hz and upto Hz 6.00 Below Hz and upto Hz Below Hz Between Hz and Hz Linear in 0.02 Hz 6 P/kWh for each step Below Hz Linear in 0.02 Hz 9P/kWh for each step

21 AS PER THE INTRA-STATE ABT ORDER OF DERC THE INTRA- STATE UI RATE WOULD BE THE RATE DECIDED BY CERC AS ON THE RATES OF UI FOR THE FREQUENCY BAND 49.0 Hz TO 50.5 Hz ARE AS UNDER

22 CERC vide Press Release dated has proposed the New UI Vector for enforcing strict Grid discipline as given below : PROPOSED NEW UI RATES Average Frequency of time-block UI Rate (P/kWh) Hz and above 0.00 Below Hz and upto Hz 6.00 Below Hz and upto Hz Below Hz Between Hz and Hz Linear in 0.02 Hz 6 P/kWh for each step Between Hz and 49.52HzLinear in 0.02 Hz 9P/kWh for each step Between Hz and HzLinear in 0.02 Hz 16P/kWh for each step COMMENTS ARE INVITED BY CERC BY 23rd APRIL 2007 ON THE ABOVE PROPOSAL FOR REVISION OF UI VECTOR.

23 IF THE PROPOSAL OF CERC IS IMPLEMENTED THE RATES FOR UI FOR THE FREQUENCY BAND BETWEEN 49.0 Hz & 50.5 Hz WOULD BE AS UNDER

24 “SLDC Shall act as the Nodal Agency for collection and Distribution of UI charges as far as intra-state ABT is concerned. As regards regional ABT, a settlement mechanism shall immediately be worked out together by the STU, SLDC and Discoms (who are represented in the RPC) in consultation with NRLDC”. SLDC has been mandated by the DERC order dated , Para No. 18(3) to maintain the Intra-State UI Account which states as under : Intra – State UI Pool Account

25 UI SETTLEMENT MECHANISM IN INTRA-STATE ABT At Inter – state level the Unscheduled interchanges of central sector and Inter regional sources are determined with reference to their schedule at the point of injection but those of SEBs with reference to their ex-periphery schedule. Datum for working out UI not being same for all entities, this results in UI MISMATCH which is equalised by averaging the two ON DAILY BASIS. The above adjustment is required to equalize payable UI amount to receivable UI amount so that UI pool account is maintained as a Zero balance account.

26 METHODOLOGY FOR ZERO BALANCING THE UI POOL ACCOUNT AT INTER-STATE LEVEL 1.UI AMOUNT IS DRAWN FOR ALL THE UI POOL MEMBERS ON ACTUAL BASIS. 2.FROM THE UI ACCOUNT AMOUNT RECEIVABLE MEMBERS AND AMOUNT PAYABLE MEMBERS TO THE POOL IS SEPERATELY DRAWN OUT. 3.AMOUNT PAYABLE AND RECEIVABLE WILL NOT MATCH BECAUSE FOR GENERATORS THE UI IS DRAWN OUT BASED ON INJECTION & SCHEDULE AT GENERATOR PERIPHERY WHEREAS FOR STATES THE SAME IS BASED ON DRAWAL & SCHEDULE AT STATE PERIPHERY. 4.AS PER THE CERC STIPULATION THE UI POOL ACCOUNT SHOULD BE A ZERO BALANCE ACCOUNT. 5.AT RPC LEVEL THE UI MISMATCH i.e. THE DIFFERENCE BETWEEN UI PAYABLE & RECEIVABLE IS EQUALIZED BY AVERAGING THE TWO ON DAILY BASIS. HOWEVER THE UI OVER HVDC AND OTHER INTER-REGIONAL LINKS IS RETAINED WITHOUT ANY ADJUSTMENT. 6.THE UI MIS-MATCH IS CALCULATED ON DAILY BASIS AND APPORTIONED TO ALL UI POOL MEMBERS IN THE RATIO 50:50 TO THE PAYING AND RECEIVING MEMBERS IN THE RATIO OF THE ORIGINAL UI AMOUNT DRAWN OUT. 7.A CASE STUDY BASED ON THE ABOVE METHODOLOGY FOR UI ACCOUNT ISSUED BY NRPC IS SHOWN IN THE NEXT SLIDE.

27 SAMPLE CASE FOR 19 TH MARCH 2007 ACTUAL UI AMOUNT FOR PAYEE AND RECEIVING CONSTITUENTS

28 METHODOLOGY FOR ZERO BALANCING THE UI POOL ACCOUNT AT INTER-STATE LEVEL MIS-MATCH BETWEEN THE PAYABLE AND RECEIVABLE AMOUNT FROM THE UI ACCOUNT IS ( )= LACS RUPEES. THIS DIFFERENCE IS DIVIDED EQUALLY BETWEEN THE TWO i.e.PAYING & RECEIVING ENTITIES IN THE RATIO 50:50 AMOUNTING TO LACS RUPEES EACH. SINCE NO INTER-REGIONAL LINK IS AMONGST THE RECEIVING UTILITES LACS IS DIVIDED AMONGST ALL THE RECEIVING UTILITIES IN PROPORTION TO THEIR UNADJUSTED UI AMOUNT. AMONGST THE PAYING UTLITIES EXCLUDING THE INTER- REGIONAL LINKS THE AMOUNT OF LACS IS CREDITED TO ALL IN PROPORTION TO THEIR UNADJUSTED UI AMOUNT. THE ADJUSTED ACCOUNTS ARE DISPLAYED IN THE NEXT SLIDE.

29 ADJUSTED UI ACCOUNT FOR PAYEE AND RECEIVING CONSTITUENTS

30 In Intra – State ABT also the UI account should be a Zero Balance Account which indicates UI payable/receivable to/from the Regional UI pool account should be equal to the UI receivable/payable in the Intra- State UI pool Account. The following mechanism is proposed : 1. STU/SLDC shall draw-out the Intra-state UI account in same principle as that of Inter-state UI account. 2. As mentioned in case of inter-state level the Unscheduled interchanges of Generating stations within Delhi are to be determined with reference to their schedule at the point of injection but for Distribution Licensees with reference to their ex-periphery ( at the licensees periphery) schedule. 3. The amount payable / receivable to the Regional pool account would then be equated on the basis of Intra-state ABT amount. METHODOLOGY FOR ZERO BALANCING THE UI POOL ACCOUNT AT INTRA-STATE LEVEL

31 SAMPLE CASE FOR INTRA-STATE ABT SETTLEMENT ACTUAL UI AMOUNT FOR PAYEE AND RECEIVING CONSTITUENTS

32 METHODOLOGY FOR ZERO BALANCING THE UI POOL ACCOUNT AT INTER-STATE LEVEL MIS-MATCH BETWEEN THE PAYABLE AND RECEIVABLE AMOUNT FROM THE UI ACCOUNT IS ( )= LACS RUPEES. THIS DIFFERENCE IS DIVIDED EQUALLY BETWEEN THE TWO i.e.PAYING & RECEIVING ENTITIES IN THE RATIO 50:50 AMOUNTING TO LACS RUPEES EACH. AMONGST THE RECEIVING UTILITES LACS IS DIVIDED AMONGST ALL THE RECEIVING UTILITIES IN PROPORTION TO THEIR UNADJUSTED UI AMOUNT. AMONGST THE PAYING UTLITIES EXCLUDING THE INTER- STATE ACCOUNT THE AMOUNT OF LACS IS CREDITED TO ALL IN PROPORTION TO THEIR UNADJUSTED UI AMOUNT. THE ADJUSTED ACCOUNTS ARE DISPLAYED IN THE NEXT SLIDE.

33 ADJUSTED UI ACCOUNT FOR PAYEE AND RECEIVING CONSTITUENTS

34 ACCOUNTING METHODOLOGY FOR MONTHLY ENERGY ACCOUNTS 1FOR GENERATING STATIONS WITHIN DELHI SLDC SHALL COMPUTE A)STATIONWISE AVAILABILITY BASED ON THE DECLARED CAPACITY BY GENERATING STATIONS ON REAL TIME BASIS AS PER THE PROVISIONS OF IEGC. (IEGC STIPULATES TO DISCOURAGE FRIVOLOUS REVISIONS, RLDC (IN DELHI’S CASE, SLDC) MAY, AT ITS SOLE DISCRETION, REFUSE TO ACCEPT SCHEDULE / CAPABILITY CHANGES OF LESS THAN TWO (2) PERCENT OF THE PREVIOUS SCHEDULE / CAPABILITY). THESE WOULD BE COMPILED ON MONTHLY AND CUMMULATIVE FINANCIAL YEAR BASIS IN PERCENTAGE.

35 B) THE SOURCEWISE ALLOCATION WOULD ALSO BE DRAWN OUT BY SLDC BASED ON DERC ORDER ON TIME TO TIME ON MONTHLY AND CUMMULATIVE FINANCIAL YEAR BASIS IN PERCENTAGE. C) SCHEDULED ENERGY FOR THE MONTH DRAWN OUT FROM DAILY IMPLEMENTED SCHEDULES PREPARED ON 15 MINUTES TIME BLOCKS. D) INCENTIVE ENERGY ON MONTHLY BASIS AND CUMMULATIVE FINANCIAL YEAR BASIS PAYABLE BY THE DISTRIBUTION LICENSEES SHALL BE COMPUTED FOR THE ENERGY SCHEDULED FROM THE STATIONS BEYOND THE TARGET PLF FIXED FOR INCENTIVE PURPOSE FIXED BY THE APPROPRIATE COMMISSION.

36 2FOR CENTRAL SECTOR AFTER ISSUANCE OF NRPC ACCOUNTS IN RESPECT OF ISGS AND OTHER SHARED GENERATING STATIONS, SLDC SHALL COMPUTE FOLLOWING : A) SOURCE WISE ALLOCATION OF THE SOURCES ON MONTHLY AND CUMULATIVE FINANCIAL YEAR BASIS IN PERCENTAGE AS SHOWN BELOW B) SOURCEWISE SCHEDULED ENERGY TO EACH DISTRIBUTION LICENSEES BASED ON THE DAILY IMPLEMENTED SCHEDULES. C) SOURCEWISE INCENTIVE ENERGY FOR THERMAL AND GAS STATIONS ON MONTHLY BASIS AND CUMMULATIVE FINANCIAL YEAR BASIS. CENTRAL SECTOR GENERATING STATIONS AND GENERATING STATIONS WITHIN DELHI SHALL RAISE BILLS ON MONTHLY BASIS BASED ON THESE ACCOUNTS ISSUED BY SLDC. LICENSEES 'ALLOCATION IN %' SOURCENDMCMESNDPLBRPLBYPLTOTAL C. SECTOR BTPS IP RPH GT PRAGATI HIMACHAL DVC

37 3 CENTRAL SECTOR TRANSMISSION CHARGES FOR TRANSMISSION CHARGES BILL, NRPC ISSUES THE WEIGHTED AVERAGE PERCENTAGE SHARE OF CENTRAL SECTOR GENERATING CAPACITY BASED ON WHICH TRANSMISSION CHARGES ARE PAYABLE TO PGCIL. THESE CHARGES WOULD FURTHER BE BIFURCATED AS PER SLDC COMPUTATION OF CENTRAL SECTOR ALLOCATION TO DISTRIBUTION LICENSEES IN DELHI. AT PRESENT, NO CENTRAL SECTOR TRANSMISSION CHARGES ARE APPLICABLE TO NDMC AND MES AS BOTH ARE NOT ALLOCATED ANY POWER FROM CENTRAL SECTOR STATIONS AS PER THE DERC ORDER.

38 THE TRANSMISSION CHARGES APPORTIONMENT OF DISTRIBUTION LICENSEES WOULD BE AS UNDER :

39 4 STATE SECTOR TRANSMISSION CHARGES FOR STATE SECTOR TRANSMISSION CHARGES, BILLS SHALL BE ISSUED BY STU BASED ON THE ALLOCATION OF STATE SECTOR GENERATING CAPACITY TO THE DISTRIBUTION LICENSEES BASED ON THE CHARGES FIXED BY DERC.

40 SCHEDULING EXPERIENCE In scheduling & dispatch of power there no major hurdle except the fact that there is a mismatch between requirement – availability of NDMC and MES due to entire requirement has been booked to single source i.e. BTPS. When all machines of BTPS are on bars these utilities are left with surplus power whereas if machines are down there is a shortage and over-drawal by both the utilities.

41 CASE STUDY FOR NDMC The following table indicates that the scheduling done by SLDC in case of NDMC and MES is most economic as mandated by the law (EA 2003 Section 32.2.(e)) which indicates “The State Load Despatch Centre shall be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.”

42 CASE STUDYFOR MES Due to single source allocation to MES the vital utility is facing shortages due to outage of units at BTPS which is evident from the scheduling profile for as indicated hereunder : This scenario has also happened in case of NDMC when Unit No. 5 & 1 at BTPS were out due to the similar constraints.

43 Disposal of Surplus Power and Availing additional requirement to meet the peak demand. SLDCs role as per IEGC clause 4 of Annexure 1 is only as a facilitator “not a trader/broker” for identifying buyer/seller for arranging scheduled inter-change within the region or across the regional boundary. For arriving at the Drawal Schedule of Distribution Licensees they are required to indicate the quantum of power from their share to be booked for sale. They are not able to match their individual schedule with the total requirement. The example is as shown in the next slide.

44 Disposal of Surplus Power SLDC faced difficulties in scheduling purposes for power transfer of Delhi to UPPCL and Delhi to TPTCL during off-peak hours. In both the deals BRPL was the co-ordinator and has to give the agreed aggregate requirement of the buyers i.e. to the tune of 400 – 550 MW in case of UPPCL and upto 200 MW in case of TPC. Finally SLDC has to apply the own logic to draw out the drawal schedules of the states as was done in case of UPPCL deal effective from UtilitiesQuantum indicated at Delhi Periphery by BRPL in MW Quantum finalized by SLDC at Delhi Periphery in MW Percentage Share as finalized by SLDC BRPL BYPL NDPL NDMC MES TOTAL497 (against the requirement of 400 MW) The same percentage share has been applied to TPC deal also.

45 Availing the additional Power to meet the peak Demand On behalf of Discoms DTL has committed 750 MW off-take from MP during July to October’07 the corridor booking is required to be done by 19th April’07 for July transaction and 19th May’07 for August transaction, etc. SLDC requested all Distribution Licensees to book the corridor as per the individual requirement. It was also advised in case no agreement for individual agreement is arrived the ratio of CPSU allocation made to Distribution Licensees be applied for booking the corridor. The individual quantum as per CPSU allocation are as under : Utilities% Share of CPSUsQuantum to be booked as per CPSU allocation in MW BRPL BYPL NDPL Total Note : NDMC & MES demand is likely to be met from the allocation of BTPS i.e % and 7.09 % capacity allocation from BTPS respectively. These co-ordination activities should be done by DPPG instead of SLDC.