DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.

Slides:



Advertisements
Similar presentations
STEPs Scenarios for the Transport System and Energy Supply and their Potential Effects Framework Programme 6, Call 1A Thematic Priority 1.6.2, Area 3.1.2,
Advertisements

EU CORIN Supporting Cross-border Cooperation BiH – Croatia/Serbia/Montenegro Europeaid/122730/C/SER/BA ________________________ Topical Training for JMC.
1 Information and Publicity in programming period.
ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
Cultural Heritage in REGional NETworks REGNET. 4. July 2002REV02 Luxembourg – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
19/02/ Cyclades Kick Off Meeting What a European Co-ordinator expects from his partners and what a European Consortium expects from his Co-ordinator.
The Implementation Structure DG AGRI, October 2005
Project reporting in FP6 Guidance notes for Integrated Projects, Networks of Excellence, Specific Targeted Research Projects, Coordination Actions.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E The general objectives of NEFIS are maximising the value of existing data and databases by: coordinating.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
Institut für Meteorologie und Klimatologie Dipl.-Met. Tahera ALI October 2003 FINAL REPORT.
TENCompetence Management Issues: WP1 Eric Kluijfhout.
Alice Carpentier University of Innsbruck STI Innsbruck
W Helmreich – Presentation to Sub-contractors; Brussels, 13/10/2005 WP 2: Monitoring, Analysis and Information Preparation Sub-contractor Meeting – 13.
FPS HEALTH, FOOD CHAIN SAFETY AND ENVIRONMENT 1 Joint Action on Health Workforce Planning and Forecasting Zuzana Matlonova Brussels – April 11th, 2013.
USG INFORMATION SECURITY PROGRAM AUDIT: ACHIEVING SUCCESSFUL AUDIT OUTCOMES Cara King Senior IT Auditor, OIAC.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
This project is funded with support from the European Commission " Legal disclaimer: the contents of this material is the sole responsibility of implementing.
D ET N ORSKE V ERITAS DNV - 01/06/ Project Progress between review meeting #2 and #3 Peik Jenssen Copenhagen 25 May 2000.
UPP - Understanding Privatization Policy Management and organizational issues Luca Farinola 24/02/2006.
Co-funded by the European Community eContentplus programme WP1 – Project Management Reporting and financial issues Milva Carbonaro GISIG.
Supported by Project Administration Second Project Meeting London, 10/11 March 2009 Liv Becker / Veit Bürger, Öko-Institut e.V.
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
MedIEQ: Quality Labelling of Medical Web Content using Multilingual Information Extraction WP1 Administrative issues Vangelis Karkaletsis 2 nd meeting,
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Information on the ANNUAL REPORT OCTOBER 18 th, 2006.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Month 6 Meeting Dedeman Hotel, Ankara, Turkey Thursday July 7 th 2005 R ESIST V IR Co-ordination of Research on Genetic Resistance to Plant Pathogenic.
Collaboration and Outreach Workgroup West Palm Beach November 2006.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
CARPE DIEM 3 rd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
WP 9: 1 st Planning meeting summary Clarification between WP members of common objectives: Workshop planning and logistics with time- line Planning for.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Administrative matters Katherine Loens. The periodic activity report: Section 1 – Project objectives and major achievements during the reporting period:
CRISP 1 st Workshop June 20, 2001 Communication and Dissemination Status of work Sylviane Nibel, CSTB (F)
District Simplified Grants. Utilize a portion of the district’s DDF –20% of new DDF –1 grant per district per Rotary year Itemized and budgeted humanitarian.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
BHL-Europe Biodiversity Heritage Library for Europe – ECP-2008-DILI – Kick-off meeting – Berlin – May 2009www.biodiversitylibrary.org Biodiversity.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Brussels, January 16th, Overview and status of the project.
- Management of Projects for Phase 2 -. Description of project management processes - Chapter on monitoring Criteria for TRC Chair Description of review.
Project Management PTM721S
Third PMC meeting University of Priština, Kosovska Mitrovica
4th. Plenary Meeting, Edinburgh, May 2010
EC project periodic and continuous reporting
Institute of Informatics & Telecommunications
Annual Report Instructions
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
19th meeting of the WG GES 22/03/2018
MINISTRY OF ECONOMY AND FINANCE
ESSnet on Linked Open Statistics
WP 1 Management and Coordination
Activity on Eutrophication
Africa Centers of Excellence (ACE II) Project Financial & Disbursement Management NAIROBI, May 13 14,2019.
Presentation transcript:

DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management

DNV No. 2 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u Scope u Schedule u Project Management Manual u Periodic Reports u Technology Implementation Plan u THEMES Web Site Prototype u list u Member/WP Matrix

DNV No. 3 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u Scope of WP VII - Network Managment database and network web site Administrative support to WP leaders Project planning Progress monitoring and reporting Arrangement of meetings Cost control and reporting Dissemination activities Summary of overall findings and need for further research u WP VII is executed by the principal contractors

DNV No. 4 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS Schedule

DNV No. 5 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS Schedule u Coordination committee, workshops & network meetings WP coorination meeting in August 2000 Distribution of tasks to members –Memebers are expected to contribute with their experience Network meeting/Workshop october 2000: –Plenary/Parallell sessions –Present/Discuss/Plan further work Summary report (Delivareble No 1) in November 2000

DNV No. 6 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS Schedule

DNV No. 7 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u Project Management Manual Scope/Contents –Dissemination plans –Exploitation plans –Implementation plan –Quality assurance procedures –Consortium Agreement Will be available at the web-site The secretariat is responsible for writing and maintaining this plan

DNV No. 8 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u Periodic Reports Biannual Management Report –reports informing on the management and the progress of the project for the previous period, but which are not linked to a payment (submitted without a cost statement –Input from members to the contractor they are linked to: –A report on their contribution to THEMES. –Input from WP co-ordinators: –Technical Progress –Comparison of planned vs. achieved work (including deviations and corrective actions) –Planned activities for next period (deviations) –The secretariat is responsible for writing and submitting this report to the Commission

DNV No. 9 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u Periodic Reports continued Annual Progress Report –reports informing on the management and the progress of the project for the previous period, but which are linked to a payment (submitted with a cost statement) –Input from WP co-ordinators: –same as for biannual management reports –state of the art review and expected results and expansions –list of deliverables –Update of Part 2 of TIP –The secretariat is responsible for writing and submitting this report to the Commission

DNV No. 10 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u Periodic Reports continued Cost statements –reports the amount of the expenditure for each cost category of all eligible costs incurred during the corresponding period –Input from WP co-ordinators: –overview of all eligible costs for all members associated with the WP –The secretariat is responsible for writing and submitting this report to the Commission along with the annual progress report.

DNV No. 11 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u Technology Implementation Plan Intention is to show how we are going to use the results from THEMES - predefined data sheets Schedule: –M1 - 1st version - start filling out forms –M19 - Draft version at mid term –M36 - Final version submitted to the Commission

DNV No. 12 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u THEMES Web Site Prototype There will be an open (to the public) and restricted part (for members) The restricted part shall be used for –distribution of reports/results –distribution of minutes and related information/presentations –discussion forum Major revisions annually based on results from WP II Final version will be a prototype of web-site for information on safety assessment applied to shipping The secretariat is responsible for setting up and maintaining this web site

DNV No. 13 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS WP VII - Network Management u list Objective: Distribute infomation about THEMES to interested parties. Stage 1: All members of the co-ordination committee sends in name, address, type of contact, and address of potentially interested parties to the secretariat. Stage 2: Based on feedback and experience with this list, the members will be encouraged to submit such information to secretariat Responsibilities –The secretariat creates and maintains the list, and makes it available through the web site –All members of the co-ordination committee submit lists of interested parties

DNV No. 14 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS Member/WP Matrix u Will be distributed immediately after this meeting. u Members are asked to review their WP involvment