Planning For The Future Idaho Powers 2006 Integrated Resource Plan.

Slides:



Advertisements
Similar presentations
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Advertisements

A New Dash for Gas? Future Energy Strategies 29 th May 2012 at Allen & Overy David Odling, Energy Policy Manager Oil & Gas UK.
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Dokumentname > Folie 1 > Vortrag > Autor Potentials for Renewables in Europe Wolfram Krewitt DLR Institute of Technical Thermodynamics Systems.
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
State Policy Initiatives Financing Wind Power: The Future of Energy May 7-9, 2008 Richard Cogen.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
Carbon Regulation and Resource Planning Jim Hill Western Resource Planning Forum June 21, 2010.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Planning for a Low-Carbon Future at San Diego Gas & Electric Rob Anderson Director of Resource Planning San Diego Gas & Electric Western Resource Planners.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
The Municipal Perspective Renewable Energy Workshop January 19, 2007 Kim Owens, P.E. JEA Clean Power Coordinator Prepared with input from Gainesville Regional.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision.
Jenny Wright Product Manager, Green Power Switch Tennessee Valley Authority.
| 1 Anshan 2015 – A world leading low carbon District Heating system
THE REPUBLIC OF DJIBOUTI A nation with a fast developing economy London May 2013 ELECTRICITE DE DJIBOUTI Votre énergie quotidienne.
TIM MASON RENEWABLE RESOURCE INTEGRATION IEP ASSOCIATION ANNUAL MEETING FALLEN LEAF LAKE 5 October 2011.
U.S. Geothermal Power Production and Development Report Dan Jennejohn Research Associate, GEA May, 2011.
Canada Committed to a Nuclear Future Presented to the 15 th Pacific Basin Nuclear Conference by Milton Caplan President, MZConsulting Inc October.
Iowa Stored Energy Park APPA Engineering and Operations April 16, 2007 Sam Shepard Electricity and Air Storage Enterprises CAPTURING THE POWER OF NATURE.
Pre Tender Meeting UNICEF Supply Division Copenhagen 10-11th December 2008 Siri Bjornstad Yellow Fever Vaccine Tender
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
Energy Efficiency Assumptions in the WIRAB Low Carbon Case Thomas Carr Western Interstate Energy Board July 30, 2008 Studies Work Group Meeting Portland,
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
“Energiewende” and cost mechanisms Charlotte Loreck Energy and Climate Division Öko-Institut e.V. Berlin for Heinrich Böll Foundation 5 December 2012.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Federal Energy Regulatory Commission Winter Energy Market Assessment 2005 – 2006 Item No.: A-3 October 20, 2005.
Market Data ASHRAE May, Keith Stippich. Global Energy Consumption Global Energy Consumption (+10.9% overall increase)
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
GPA Renewable Energy Resource for Guam Power Authority
Arizona Electric Power Cooperative, Inc.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Ontario Electricity Industry : Planning Ahead Amir Shalaby VP, Power System Planning Ontario Power Authority Presentation to Canadian Nuclear Society The.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Montana Ambassadors Helena, Montana February 25, 2011.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Avista Wind Integration Thoughts Clint Kalich, Avista Utilities (509) Wind Integration Forum Technical Workgroup.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
Plan Today. Power Tomorrow. The Utility Perspective PNUCC June 11, 2009.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Northwest Power and Conservation Council A Look At The Council’s Conservation Planning Methodology and Assumptions A Look At The Council’s Conservation.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Demand Response 2010 and Beyond April 28, 2011 Pete Pengilly.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
1 Portfolio Analysis Update Power Committee Discussion August 30, 2004.
Avista’s 2016 Natural Gas IRP
2017 Integrated Resource Plan
Demand Response in the 7th Power Plan
Update on Utility Integrated Resource Plans
Idaho Power 2017 Integrated Resource Plan
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
The Seller’s Webinar will begin promptly at 1:03
Presentation transcript:

Planning For The Future Idaho Powers 2006 Integrated Resource Plan

2006 IRP Timeline Idaho Power submits an Integrated Resource Plan to the Idaho and Oregon Commissions every two years 2006 IRP process began in September 2005 Submitted the 2006 IRP to the IPUC on September 29, 2006 Planning period extended from 10 to 20 years Align with the term of PURPA contracts Long lead times required for certain generation resources and transmission projects Begin 2008 IRP process in May 2007 (June 2008 submittal)

IRP Planning Process Forecast Future Needs Develop load, hydrologic and generation forecasts Determine average energy deficiencies (monthly) Determine capacity deficiencies (peak-hour) Determine Pacific Northwest transmission deficiencies (peak- hour)

Forecast Load Growth ( ) Summer peak load growth continues to drive peaking needs Firm summer peak load growth – 80 MW/year (2.1%) Firm winter peak load growth – 50 MW/year (1.6%) Average annual firm load growth – 40 aMW/year (1.9%)

Energy (Average Load) Surplus/Deficiency ( )

Peak-Hour Load (Capacity) Surplus/Deficiency ( )

Monthly Peak-Hour Northwest Transmission Deficiency ( )

IRP Planning Process Determine the Best Way to Meet Future Needs Estimate costs of supply-side resources and demand-side measures Construct numerous portfolios containing both supply-side resources and demand-side measures designed to meet average energy and capacity deficits Determine the total cost of each initial portfolio Select 4 finalist portfolios for further qualitative and quantitative risk analysis Select preferred portfolio

2006 Preferred Portfolio YearResourceMW 2008 Wind (2005 RFP) Geothermal (2006 RFP) Combined Heat & Power Wind Transmission (McNary to Boise) Wyoming Pulverized Coal Regional IGCC Coal Transmission (Lolo to IPC) Combined Heat & Power Geothermal Geothermal INL Nuclear (PPA) 250

Coal-Fired Resource Update Idaho Power and Avista Idaho Power and Avista have executed a MOU to study and analyze the potential for developing one or more coal-fired generation facilities Letters sent to project developers & mine owners on September 27th Initial Data submittals were due October 25th Currently analyzing and screening responses Expect to have initial screening completed 1 st Qtr 2007

Near-Term Commitments Assess level of CHP development and consider issuing RFP (IRP includes 50 MW in 2010) McNary–Boise Transmission Upgrade – Study process initiated, expect to make commitments before filing 2008 IRP (2012 in service date anticipated) Coal-based Resource – evaluation in progress, expect to make commitments to proceed with permitting and pre- construction activities before 2008 IRP is filed (2013 on-line date anticipated)

Closing Thoughts Incorporate flexibility in the IRP to: React to changing markets & regulatory conditions Incorporate PURPA resource development Acquire more or less of a specific resource depending on RFP results