deep screening of Turn out with the help of T-28 Machine.

Slides:



Advertisements
Similar presentations
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Advertisements

Planned Lighting Services Concepts & Practices. Lighting: An Important Asset Reduces operating costs Adds to safety and security Maximizes energy utilization.
Cap Sewing with HCS-1201 Voyager
BOX PUSHING TECHNOLOGY
Chapter 4: Trees Part II - AVL Tree
Intermediate SFFMA Objectives: – Hrs received.
AUDIO-VISUAL AIDS.
Patient’s SignaturePrint NameDate Patient’s SignaturePrint NameDate In my opinion, a safe level of practice has been achieved in this section: Qualified.
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Next Home EcoCompact troubleshooting guide Start the slide show then click Next.
Research Project Presentation Steve Howarth Presentation Outline  Project Title  Project Hypothesis  Project Background  Project Objectives  Research.
1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine.
LESSONS LEARNT ON THE BASIS OF ACCIDENT INQUIRY REPORTS OF COMMISSIONER OF RAILWAY SAFETY (ENGINEERING CASES)
Chapter 8 STARTING, STEERING, STOPPING
SKV welds - limitations Fatigue life only 50 % of Rail Skill of welder very important Quality control difficult Heating Tapping fusion The Age of weld.
Sleepers A Presentation on Department of Civil Engineering,
Kombis 8003 Index block Overview Principle Function
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Health and Safety Training Standards in Design and Technology
Sleepers and fastenings (N.R. Kale ).
Road Traffic Accident Procedures (6) Service Delivery 2.
Election Commission of India
Chapter 4 Process Design.
All About the Ellipticals Safety Guidelines. What is an elliptical?  A stationary exercise machine used to simulate stair climbing, walking or running.
Maintenance of LWR/CWR
Dedicated Freight Corridor By CHAHATEY RAM CBE/ER.
PPT PROCEDURES TO USE A TRACTOR PPT
Step 4 – Evaluation of Safety Group Elements. Achieving an Element Implement 5 Steps to Managing Health & Safety: 1. Written standard 2. Communication.
London Underground Kingsbury to Wembley Park Embankment Stabilisation Brent Civic Centre 22 July 2015 Mark Hart – Communities Relations Manager Andrew.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Methods of mounting of jobs and cutting tools in machine tools The job or blank and the cutting tools essentially need to be properly mounted in the machine.
Lesson 9 Reversing. Ships may move: ahead astern sideways (athwarthships)
RAILER SMS Track Inspection Version
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
STATE ELECTION COMMISSION, KERALA General Election 2015 STATE ELECTION COMMISSION, KERALA General Election 2015.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
MECHANISED BALLAST CLEANING DYNAMIC TRACK STABILISATION & UNIMAT
PRESENTED BY SUBMITTED TO ANUJ KUMAR SRIVASTAVA Mr. DEEPAK SHARMA ME-1 3 rd YEAR COORDINATOR AND FACCULTY ROLL NO IMSEC MILLING.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Irrigation Efficiency or IE Water applied is never 100% beneficially used. There is always some loss Evaporation from soil and leaf surface Evaporation.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
REVISED PROFORMA FOR MEASUREMENT OF POINT & CROSSING
Procedure for Using SCAG Mower (Revision 1 – 11th November 2010) Toolbox Talk.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
A new method for high productive pre measuring of ballast tracks Andreas Sinning and Patrick Walke [S-2265]
CE2303 Railway Engineering
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
INSTALLATION MANUAL FATL Machine Installing: ACTIVITY CHECK POINT 1. Minimum two persons required for opening the Machine. 2. Cut the straps & tape. 3.
Reactive to Proactive Approach to Track Maintenance on Indian Railways
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Permanent Way.
UNIT-II TURNING MACHINES
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Who is Responsible for Overhead Crane and Hoist Operations
SAFE WORK INSTRUCTIONS
Surface Grinding Operations
CONSTRUCTING STRAIGHT LONGITUDINAL JOINTS
SAFE WORK INSTRUCTIONS
Investigation of Road Project
Maintenance of Track carrying HAL - Deep Screening
Lock out / Tag out Regulations (Standards - 29 CFR)
Warhorse Vacuum Services
SAFE WORK INSTRUCTIONS
The Safe Use of All Terrain Vehicles (ATVs)
SAFE WORK INSTRUCTIONS
RPAS SYSTEM Copyright © MILE 2011 MILE / XUV500 / RPAS / VER 01 / JUL 2011.
Team Driving First Driver login to POV Completely.
SAFE WORK INSTRUCTIONS
UNIT I – RAILWAY PLANNING. PERMANENT WAY A System of rails fitted on sleepers which rest on ballast and everything supported by a sub- grade is known.
Alabama Driver Manual Chapter 3
Presentation transcript:

deep screening of Turn out with the help of T-28 Machine. Pankaj Gupta Sr.DEN/C/UMB

PRE REQUISITES a) Joint inspection of site by P.way, S&T and operating supervisors & preparation of joint note indicating traffic repercussions. b) Collection of adequate ballast for recoupment Ballast Filled Bags

Pre requisites contd.. c) Examination of site for shifting of existing turnout. d) Marking of stations at 4 m (say) Interval. Lateral distance

Pre requisites contd.. e) Measuring & recording of off sets at each marked station from the adjoining track/fixed structure for repositioning of T/Out at its original alignment. f) Replacement of broken /defective sleepers if any along with recoupment of missing fittings. h) Checking of TNC to TNC distance in case of cross over with respect to theoretical.

1. Imposition of S.R. of 20 KMPH. Pre Block Activities 1. Imposition of S.R. of 20 KMPH. 2. Cutting of rails ahead & rear of turnout for isolation. 3. Removal of Joggled fish plates if existing. 4. Replacing of J-Clips with ERC at removed Joggled Plate/ Glued Joint locations for enhancing Toe load.

Pre Block Activities contd…. 5. Removal of crib ballast. 6. Removal of clean shoulder ballast near by the site for re use.

Pre Block Activities contd…. 7.Ensuring relocation of cables/wire runs/ rod runs /S&T gears for free working of JCB Machines.

Requirement of man power & machines JCB Machines = 2 Tractor Trolley = 1 Man Power = 25 Black Smith Team = 1

Block Activities Positioning of T-28 machine on Turnout

Block Activities contd.... 2. Disconnection of S&T gears and clamping of switch to avoid damage/twisting. 3. Opening of F/Plates on approaches of T/Outs.

4. Shifting of T/Out by T-28 machine at pre decided location. Block Activities contd.... 4. Shifting of T/Out by T-28 machine at pre decided location.

5. Removal of muck/caked ballast with JCBs & leveling of formation. Block Activities contd.... 5. Removal of muck/caked ballast with JCBs & leveling of formation.

6. Putting of clean ballast up to desired level & leveling. Block Activities contd.... 6. Putting of clean ballast up to desired level & leveling.

Block Activities contd.... 7. Shifting back the turnout to its original position and connecting with approaches.

Block Activities contd.... 8. Aligning of T/Out with T-28 machine with reference to pre marked stations. 9. Removal of T-28 machine from the turnout . 10.Re-connection of S&T gears. 11.Putting of Ballast & manual packing.

Post Block Activities 1.Recoupment of crib & shoulder ballast .

Post Block Activities contd… 2. Required rounds of packing /tamping to remove the S.R. 3. Correction of Cess level & cross-slopes for drainage. 4. Profiling & dressing of ballast .

traffic block required S.No. Activities Time in Minutes Cumulative Time 1 Placing of T-28 machine, dis-connection of S&T and P.way gears. 25 2 Shifting of Turn out to pre decided location 35 60 3 Removal of muck & leveling 95 4 Putting of clean ballast & leveling 120 5 Shifting back of turnout & re – connecting with approaches. 50 170 6 Alignment of Turn out & removal of T-28 machine. 30 200 7 Re-connection of S&T gears, putting ballast and packing 40 240

Advantages Correction of TNC to TNC distance can be done if required. Deep screening as well as complete renewal can be done simultaneously. Deep screening of cross-over can also be done as can’t be done with BCM. Uniform formation of bed at desired level can be achieved.

Constraints Adequate space in nearby required for collection of ballast, removal of muck & shifting of T/Out. In case multiple lines block of adjoining lines is also required. Longer block i.e 4 Hours is required at one spell.

deep screening of Turn out with the help of road cranes Two Road cranes can also be utilized in lieu of T-28 Machine for Deep screening of T/Out . Advantages :- 1. Deep screening of T/Out will not be dependent on availability of T-28 Machine. 2. Work can be done on T/Outs having bunch of S&T rod runs and other gears where the traveling / working of T-28 Machine is not feasible .

Disadvantages :- Adequate space is required for propping of road cranes and placing of shifted T/out by this procedure . T/out could not be lifted/shifted with road cranes without providing suitable arrangement for proper holding the T/out at four points.

RECOMMENDATIONS Different divisions using different block duration for T-28 block, needs standardisation at HQ level to avoid bargaining with operating department.