WBS: Lowest level OBS: Lowest level
Advertisements

Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
MGMT 483 Week 8 Scheduling.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Project Management: A Managerial Approach 4/e
Project Management: A Managerial Approach
Project Management A Managerial Approach
Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers are responsible for.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Roberta Russell & Bernard W. Taylor, III
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
ENGM91 ACTIVITY PLANNING Unit 2
Lean Project Management
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
Network Analysis Terminology
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
INDE 6332 ENGINEERING PROJECT MANAGEMENT SCHEDULING LECTURE 1 University of Houston Dept. of Industrial Engineering Houston, TX (713)
Project Management in Practice
University of Sunderland CIFM02 Unit 2 COMM02 Activity Planning Unit 2.
MEM 612 Project Management Chapter 5 Scheduling the Project.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
CHAPTER :5 SCHEDULING. Things to Learn – Precedence analysis – Gantt Charts – PERT / CPA.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management MGT 30725
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management: PERT/CPM
Project Scheduling KULIAH 10 Magister Sistem Informasi
Project Planning & Scheduling
Project Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PERT & GANTT CHARTS An Introduction.
The Project Schedule and Budget
deterministic Fixed and known in advance, representing a
Project Scheduling KULIAH 10 Magister Manajemen
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Time Planning and Control Activity on Node Network (AON)
Operations Research Lecture 5.
Project Planning & Scheduling
Project Management for Business
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Activity Planning.
Projects: Critical Paths
Software Development & Project Management
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management: A Managerial Approach
Time Planning and Control Activity on Node Network (AON)
Chapter 6 Activity Planning.
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
AOA A style of project network diagram in which arrows
Chapter 6 Activity Planning.
Presentation transcript:

Scheduling

Things to learn... Precedence analysis Gantt Charts PERT / CPA

Why activity planning?? Activity Planning will help to: Ensure that the appropriate resources will be available precisely when required Produce a detailed schedule showing which staff carry out each activity Produce a detailed plan against which actual achievement may be measured Produce a timed forecast

Precedence analysis Decides what activities must be carried out before particular activity can start. Must be done before an activity plan can be produced.

Gantt Charts Developed by Henry Gantt, around 1917. Gantt charts are easy to use and produce. They are very useful for use on less complex projects. Commonly used due to there simplicity. Gantt charts are easily understood and easy to read.

Gantt Charts

Gantt Charts Draw the following Gantt chart Tasks Precedence Time a - 5 days b - 4 days c a 6 days d b 2 days e b 5 days f c,d 8 days Get students to draw the Gantt chart.

Gantt Charts

Network planning models PERT The Program Evaluation and Review Technique Developed by: US Navy with BOOZ-Allen Hamilton and Lockheed Corporation for the Mainly use for R&D projects

Network planning models CPM Critical Path Method Also known as CPA Critical Path Analysis Developed by DuPont Inc in the Late fifties early sixties(1958) to facilitate Developed for use in construction projects

Network planning models A simple on arrow network model 1 2 3 4 5 Start End a b c d e f g h

Terminology Activity Event A specific task, uses resources takes time to complete Event The result of completing an activity Events use no resources

Terminology Network - The combination of all activities and events define the project and the activity precedence relationships Path - The series of connected activities (or intermediate events) between any two events in a network Critical - Activities, events, or paths which, if delayed, will delay the completion of the project. A project’s critical path is understood to mean that sequence of critical activities that connect the project’s start event to its finish event

The framework of PERT and CPM For proceeding with PERT/CPM following common six points have to be followed: Define the project with significant activities or tasks Develop relationship among the activities Draw network connecting all activities Assign time and/or cost estimates to each activity Compute the critical path

The Language of PERT/CPM concluded An activity can be in any of these conditions: It may have a successor(s) but no predecessor(s) - starts a network It may have a predecessor(s) but no successor(s) - ends a network It may have both predecessor(s) and successor(s) - in the middle of a network

Building the Network AON Network AOA Network

Drawing Networks Activity-on-Arrow (AOA) networks use arrows to represent activities while nodes stand for events Activity-on-Node (AON) networks use nodes to represent activities with arrows to show precedence relationships The choice between AOA and AON representation is largely a matter of personal preference. AON is Often preferred by project managers

Network syntax AOA Time moves from left to right Nodes are numbered sequentially A network may not contain loops Precedents are the immediate preceding activities Dummy activities can be used to indicate a particular precedence

Network syntax Time moves from left to right Nodes are numbered sequentially 1 2 3 a b

Network syntax A network may not contain loops 1 2 3 4 This is not allowed a b c d

Network syntax Precedents are the immediate preceding activities 1 2 3 Design Build 4 Commission

Network syntax Dummy activities can be used to indicate a particular precedence 1 2 3 Wrong 4 Right a b c

A Sample Set of Project Activities and Precedences

Precedence Networks Precedence network also known as Activity on Node Becoming more common as it is used by many project planning software packages Often preferred by project managers

Precedence Networks Syntax the same as for On Arrow networks Except there are no dummy activities Precedence networks must start with a start node and end with a end node

Stage 1 of a Sample AON Network

Stage 2 of a Sample AON Network

A Completed Sample AON Network

Stage 1 of a Sample AOA Network

Stage 2 of a Sample AOA Network

A Completed Sample AOA Network

A Completed Sample AOA Network Showing the Use of a Dummy Task

On Arrow Networks Draw the following as an on arrow network Tasks Precedence Time a - 5 days b - 4 days c a 6 days d b 2 days e b 5 days f c,d 8 days

On Arrow Networks How to start ….. 1 2 3 start a b

On Arrow Networks What not to do 1 2 3 start a b 4 5 6 c d e

On Arrow Networks A better way …… 1 2 3 start a b c d e

On Arrow Networks It is then less confusing that c & d go to the same event … but what about e & f ? 1 2 3 start a b 4 5 6 c d e f

On Arrow Networks The completed on arrow network …. 1 2 3 start a b 4 5 c d e f end

On Arrow Networks Another on arrow network to draw Tasks Precedence Time a - 6 weeks b - 4 weeks c a 3 weeks d b 4 weeks e b 3 weeks f - 10 weeks g e,f 3 weeks h c,d 2 weeks

On Arrow Networks The network with activity times added 1 3 4 6 2 5 B=4 D=4 F=10 E=3 G=3 H=2

Precedence Networks Draw the following as an Precedence network Tasks Precedence Time a - 5 days b - 4 days c a 6 days d b 2 days e b 5 days f c,d 8 days

Activity list for the Project Activity Description Immediate Predecessors A R&D product design - B Plan market research - C Routing (manufacturing engineering) A D Build prototype model A E Prepare marketing brochure A F Cost estimates (industrial engineering) C G Preliminary product testing D H Market survey B, E I Pricing and forecast report H J Final report F, G, I

2 5 7 1 4 8 3 6 Routing (C) Product Design (A) Market Research Plan (B) Prototype (D) Marketing Brochure (E) Cost Estimates (F) Testing (G) Survey (H) Pricing and Forecast (I) Final Report (J) COMPLETION Activity list for the Project Activity Description Immediate Predecessors A R&D product design - B Plan market research - C Routing (manufacturing engineering) A D Build prototype model A E Prepare marketing brochure A F Cost estimates (industrial engineering) C G Preliminary product testing D H Market survey B, E I Pricing and forecast report H J Final report F, G, I

Exercise 1 Tasks Precedence Time a - 6 weeks b - 4 weeks c - 3 weeks d a 4 weeks e b 3 weeks f b 2 weeks g c 3 weeks h d,e 2 weeks i f 1 week j g,i 2 weeks

Exercise 2 Tasks Precedence Time a - 3 weeks b - 5 weeks c a 7 weeks d b 5 weeks e c, d 6 weeks f b 4 weeks g b 8 weeks h c, d 4 weeks i e, f 3 weeks

Exercise 3 Tasks Precedence Time a - 2 weeks b - 4 weeks c - 3 weeks d a 3 weeks e a 5 weeks f c 6 weeks g c 4 weeks h d 4 weeks i d 8 week j b, e, f, i 2 weeks k - 4 weeks l g, k 3 weeks

Exercise 4 Tasks Precedence Time a - 3 weeks b a 5 weeks c a 3 weeks d c 1 weeks e b 3 weeks f b, d 4 weeks g c 2 weeks h g, f 3 weeks i e, h 1 weeks

Exercise 5 Tasks Precedence Time a - 3 weeks b - 5 weeks c a 14 weeks d a 5 weeks e b 4 weeks f b 7 weeks g d, e 8 weeks h g, f 5 weeks

Exercise 6 Another on precedence network to draw Tasks Precedence Time a - 6 weeks b - 4 weeks c a 3 weeks d b 4 weeks e b 3 weeks f - 10 weeks g e,f 3 weeks h c,d 2 weeks