CSC Shift Training and Operation + B904 Status

Slides:



Advertisements
Similar presentations
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Advertisements

A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Idaho Procedures M100 OPTICAL SCAN PRECINCT TABULATOR.
27-April-2009CSC Shifter Training Manual1 CSC Shifter Training EMU Page 1 Fred Borcherding Reach from CSCOperations Twiki page or directly:
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
OVERVIEW S9k Home Page Review. Home Page The presentation will dissect each section of the Home Page.
How to complete and submit a Final Report through
JOB AID myCompetency Assessment.
PART 2 TELPAS Online Reading Grades 2-12
Central DQM Shift Tutorial Online/Offline
TOMS TRAINING Test Operations Management System 2017 PAWS
KARES Demonstration.
Training Demo: DuPont Vendor Clients December 2016
A Complete guide to Summer 2016 Registration Once you’re logged into WyoRecords Click on Registration *Slides will forward after 6 seconds or by mouse.
Central Online DQM Shift Tutorial March 2017, CMS DQM group
LKr status R. Fantechi.
WSP quality assurance tool
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Training Demo: Mary Kay Vendor Clients
EMU Slice Test Run Plan a working document.
Hot Checkout System for LERF Resuscitation
Online Testing System Assessment Viewing Application (AVA)
Multi Rater Feedback Surveys FAQs for Participants
Multi Rater Feedback Surveys FAQs for Participants
Study Island Teacher Training
A Complete Guide to Summer 2016 Registration Once you’re logged into WyoRecords, click on Registration *Slides will forward after 6 seconds or by mouse.
Central DQM Shift Tutorial Online/Offline
FTS 2 (Failure Tracking System) System Test Process Flow
Online Testing System Assessment Viewing Application (AVA)
Online Testing System Assessment Viewing Application (AVA)
Online Testing System Assessment Viewing Application (AVA)
Online Testing System Assessment Viewing Application (AVA)
DTC Spring Kick-Off January 8th 2015.
Assessment Viewing Application (AVA)
Online Testing System Assessment Viewing Application (AVA)
How to Create and Start a Test Session
FAFSA-Apply Today! Presented by McDaniel College.
B904 Status Report by Fred B.
Online Testing System Assessment Viewing Application (AVA)
Online Testing System Assessment Viewing Application (AVA)
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
AGILENT TECHNOLOGIES RESTRICTED
UXC55 ME Muon Endcap On Detector Layout
Online Testing System Assessment Viewing Application (AVA)
What’s New in Time & Attendance
Online Testing System Assessment Viewing Application (AVA)
Interim & Diagnostic Teacher Item Previewer
Fred’s Input to Rice Workshop
PowerChart Overview Tab New Feature for Physicians
Online Testing System Assessment Viewing Application (AVA)
CSC Turn ON Status Report by Fred B.
Developing a Program.
Pierluigi Paolucci & Giovanni Polese
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
B904 Status Report by Fred B.
CSC Electronics Installation and Commissioning CSCE I&C
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Electronics Problem Report CSCE I&C
ME I&C -- PC Electronics
Assessment Viewing Application (AVA) for Interim Assessments
Presentation transcript:

CSC Shift Training and Operation + B904 Status 19-April-05 CSC Shift Training and Operation + B904 Status Fred Borcherding Fermi 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 Overview Training Changes to date Training is now being conducted at Pt5 Training is focused on LHC operations cDCS changes Run Registry changes Differences for Operation and Procedures cDCS Run Registry & DQM B904 Status Cosmic Ray Runs Taken Being used for hardware & firmware testing 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 New Main Shift Station Main station now has 4 monitors UL > EMU Page 1 UR > DCS LL > Run Registry LR > DQM / Run Evaluation 14 March 2010 CSC Training/Operation & B904 by Fred B.

Changes to Shifter Training 19-April-05 Changes to Shifter Training Moved training to Pt5 Classroom training in meeting room With laptop project slides and/or real-time views of shifter pages Point where training could be improved Assistance with language Often with training in English for non-native speakers question go unasked and misunderstanding is too common Set requirements on 1st time shifters and returning shifters More formal shifter certification? Now training is required Require minimum of training and hands on shift training for shift to count Sit as 2nd shifter for part of a shift to complete certification Who certifies? Now> Me, Richard Need someone to conduct training who is based at CERN 14 March 2010 CSC Training/Operation & B904 by Fred B.

Shift Changes – c(entral)DCS 19-April-05 Shift Changes – c(entral)DCS Moved CSC Shifter DCS to cDCS Moved DCS procedures out of CSCOperations and Into CSCOperationsDCS for cDCS Moving DCS procedures to pdf file Hypertext linked file – quick navigation In pdf format – fixed and changeable only by experts See version 1.0 Status so far cDCS has control since Thursday All alarms addressed at cDCS station cDCS shifter AND CSC shifter together address alarms and problems When is DCS Back to CSC? CEO and Experts fixing problems, calibrations and other special operations 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 Top Level of CSC DCS UI Key Login Panel CSC End View * CSC * PCrates Who to Contact CSC Shifter - shifter address problem CSC CEO – shifter contact CEO CSC Shifter Communication Status CSC Shifter Subsystem Panel Value Monitor CSC CEO HV, LV, FEDS CSC CEO Majority Logic 14 March 2010 CSC Training/Operation & B904 by Fred B. CSC CEO >>16 1972

Top Level Procedures for CSC DCS 19-April-05 Top Level Procedures for CSC DCS CEO Level Alarms Shifter Level Alarms Subsystem Panel Alarm <RED> indicates problem in all or one end of CSC Contact CEO 16 1972 Check if cDCS has infrastructure alarms Majority Logic Alarm <RED> indicates that a significant percentage of CSC devices are in alarm HV, LV, FEDS Alarm <RED> indicates that a major component of the HV, LV or FEDS is in alarm Do NOT turn these back on – ONLY expert should correct End View Multiple chambers or crates in Alarm <RED> – indicates there may be a major problem – check bottom of the display – Contact CEO 16 1972 Single chamber or crate in Alarm <RED> indicates chamber or crate has a single device in error – CSC Shifter follow detailed procedure Communication Status Alarm <RED> monitor, if it does not clear itself after 5 minutes contact CEO 16 1972 NOTE: Question marks ‘?’ will also appear on End View Value Monitor This is a diagnostic panel Shifter hourly cycle through displays and follow detailed procedures 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 Run Registry Run Registry Same tool as used by Central DQM shifters Version for CSC Divides CSC into several parts Authored by Valdas Local DQM display has added features Known problem list and comparison Filtering of severity of errors Reference run comparison Status - Shifters have been putting runs into RR Shifters have been grading runs in RR NEED expert(s) to review and sign off each run 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 CSC Run Registry Top panel of the CSC version of the Run Registry http://pccmsdqm04.cern.ch/runregistry/ - Workspace > CSC Each run is graded by CSC > Overall CSCTF > Track Finder DDUs > DDU operation Rings > by each station/ring 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 Categories CSC >> Overall grade for this run BAD > tbd CSC TF >> Grade and details for TF tbd DDUs >> Grade and details for DDU BAD > 2 or more CRITICAL (including known) Rings >> BAD > 2 or more CRITICAL or DEAD (including known) Insert details for each CRITICAL and list DEAD 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 New DQM Features NOTE – The light grey are filtered out errors The blue are the same as for the reference run The Hot Pink are KNOWN PROBLEMS The DQM display has new features Compare to run > REAPEATING_PROBLEMS > when current has same problem KNOWN_PROBLEM > compares to a list of known problems Filtering > FILTERS > only shows the severity of interest 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 Action NOTE – The example ME-2/1/02 is BLUE because it has the exact same problems as for the reference run. Since the display is filtered we see only the CRITICAL chambers These ‘CRITICAL’ CSC problems are not a ‘Known Problem’ Enter the problem’s messages into the RR 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 Action (cont.) These ‘CRITICAL’ CSC problems are the same as for the reference run Do not enter into the ELOG If these CRITICAL problems were new for this run it should be entered into the ELOG 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 B904 Future Set up for LVDB diagnosis / repair? Dedicated 2nd chamber? UPS for computers? Remove chiller from rack DSS interlock? Train more people to operate the DSS rack interface? CTS changes Can run CR HV connected to CAEN supply Duplicate HV source possible Computers and base crates connected to wall power Duplicate power available DSS system has been upgraded 14 March 2010 CSC Training/Operation & B904 by Fred B.

CSC Training/Operation & B904 by Fred B. 19-April-05 Summary Shift training is more formal New documentation has been put in place for cDCS and Run Registry Is there enough documentation for shifters? NO, need to push experts to provide operation manuals. What is the progress on validation by shifters? CSC RR is being used by shifters to grade CSC for runs Are the main goals of shifts being achieved? Yes, CSC is running well. The safety of the detector has been assured. 14 March 2010 CSC Training/Operation & B904 by Fred B.