Practical Assessment Project Template – DMADV

Slides:



Advertisements
Similar presentations
Project leader : Champion : Project Number / Phase : Revision / Date :
Advertisements

Lean Six Sigma Project Presentation Template
Project Storyboard Template
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Black Belt Level DMAIC Certification Checklist
DMADV Review Template. 2 © LSSA 2010 DMADV Roadmap 10 steps model D M A D V 1 – Project Selection / Project Management 2 – Determine Functional Requirements.
11 Explanation to Participants about this template and final presentation This template is meant as a Six Sigma / Re engineering Submission Template This.
Black Belt Project Storyboard Template
Practical Assessment Project Template
Define Tollgate Checklist
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Project Title GB or BB name: XYZ.
Project Storyboard (Page 1 of 2)
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Practical Assessment Project Template
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
Analyze Wrap Up and Action Items
Name: Project: March – April 2017
Practical Assessment Project Template – DMADV
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template

The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
Six Sigma.
LEAN SIX SIGMA PROJECT TEMPLATE
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
DRIVING IMPROVEMENTS Through Six MahindraSatyam
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Name: Project: March – April 2017
TechStambha PMP Certification Training
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Define Phase Wrap Up and Action Items
Name: Project: MSD IT – December 2017
Quality Certification
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
OPS/571 Operations Management
Presented By: <Names> <Team Name> <Date>
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
6 Six Sigma Basics GEOP 4316.
Explanation to Participants about this template and final presentation
Supplier Performance Development Process
GHSP Problem Solving Team Champion: Team Members: Team Mentor:
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Lean Six Sigma Project Name: Project: Date: Intros Expecations
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Analyze Phase Welcome to Analyze
Supplier Performance Development Process
Measure Phase Wrap Up and Action Items
Name: Project: MSD IT – December 2017
Practical Assessment Project Template – REV. 5.2
QMS, ISO and Six Sigma It’s all related…..
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Six Sigma DMAIC Process
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Practical Assessment Project Template – DMADV Project title: <title of the project> Organization: <name of your organization> Project leader: <your name> Belt level: <Black or Green Belt> Revision date: <e.g. 02-08-2017>

DMADV Introduction for this template Objectives of this presentation: Certification by LSSA Project summary for your organization Guidelines: Methodology and logic understandable, for a Lean Six Sigma trained external colleague Clear conclusions on each sheet Target for certification is max. 25 sheets (no limit for internal use) No back-up sheets Delete the (Italic) notes for the user, upon need Delete this slide before handing in.

DMADV Process improvement roadmap DMADV roadmap Define 1 Define and Scope project 2 Determine functional requirements 3 Plan and document project Measure 4 Translate into technical requirements 5 Establish objectives 6 Evaluate measurement system Analyze 7 Develop concept design 8 Identify potential influence factors 9 Develop Y=f(X) function Design 10 Determine optimum design 11 Prototyping / concept 12 Design validation plan Verify 13 Validate design 14 Close out project

DEFINE 1 – Define and scope project Problem Description: Objectives:

DEFINE 1 – Define and scope project Target: In Scope Out of Scope: Deliverables: Hard Benefits: Soft Benefits:

Define 2 – Functional Requirements Determine Functional Requirements

DEFINE 3 – Plan and document project Project Team Supplier: Champion: User: MBB: Project leader (Belt): Name: Role: Responsibility:

DEFINE 3 – Plan and document project SIPOC is mandatory for process improvement For design improvement: visualize product problem area SIPOC Process Map Supplier: Inputs: Process: Outputs: Customers: ‘Process’ Step 1 Step 2 Step 3 Step 4 Step 5

Self Assessment LSSA Assessor Feedback DEFINE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Define 1 Project addresses a clear business opportunity (GB: 20k€ p/year; BB: 50k€ p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been clearly defined. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Relevant KPIs have been selected / CTQ-flowdown has been constructed. 8 SIPOC has been made.   Missing Incorrect Correct N/A Define 1 Project addresses a clear business opportunity (GB: 20k€ p/year; BB: 50k€ p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been clearly defined. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Relevant KPIs have been selected / CTQ-flowdown has been constructed. 8 SIPOC has been made.

MEASURE 4 – Technical Requirements Translate into technical requirements

MEASURE 5 – Objectives Establish objectives

MEASURE 6 – Measurement Procedures Evaluate measurement system

Self Assessment LSSA Assessor Feedback MEASURE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Measure 1 Data has been collected / selected properly. 2 The collected data has been proven to be representative for the project. 3 Validity of the data has been verified in an appropriate way (Gage R&R if applicable). 4 Historical data has been used to visualize process stability and performance over time. 5 Variation in the process has been considered (common cause or special cause). 6 Short term versus long term performance has been considered. 7 Performance against requirements has been checked.   Missing Incorrect Correct N/A Measure 1 Data has been collected / selected properly. 2 The collected data has been proven to be representative for the project. 3 Validity of the data has been verified in an appropriate way (Gage R&R if applicable). 4 Historical data has been used to visualize process stability and performance over time. 5 Variation in the process has been considered (common cause or special cause). 6 Short term versus long term performance has been considered. 7 Performance against requirements has been checked.

ANALYZE 7 – Concept Design Develop Concept Design

ANALYZE 8 – Potential influence factors Identify potential influence factors

ANALYZE 9 – Develop Y=f(X) function

Self Assessment LSSA Assessor Feedback ANALYZE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential factors of influence have been determined. 3 Cause & Effect / FMEA have been used to identify factors with highest influence. 4 Hypothesis for root cause has been defined properly. 5 Input data has been collected and analyzed correctly. 6 Graphical and statistical techniques have been applied to investigate root causes. 7 Major root causes have been identified. 8 Conclusions have demonstrated strong evidence / statistically valid.   Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential factors of influence have been determined. 3 Cause & Effect / FMEA have been used to identify factors with highest influence. 4 Hypothesis for root cause has been defined properly. 5 Input data has been collected and analyzed correctly. 6 Graphical and statistical techniques have been applied to investigate root causes. 7 Major root causes have been identified. 8 Conclusions have demonstrated strong evidence / statistically valid.

Design 10 – Optimum Design Determine Optimum Design

Design 11 – Prototyping / Concept Create prototype / concept

Design 12 – Design Validation Plan Make a design validation plan

Self Assessment LSSA Assessor Feedback Design Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome. Risks have been mitigated. 4 Internal and external clients have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).   Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome. Risks have been mitigated. 4 Internal and external clients have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).

Verify 13 – ValidatE Design

Verify 14 – Close out project Conclusions …. Recommendations Lessons learned

Verify 14 – Close out project The realized benefits of this projects are: Champion: Date, Name & Signature - Controller: Date, Name & Signature - LSSA Assessor: Date, Name & Signature -

Self Assessment LSSA Assessor Feedback Verify Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' is available and sufficient. 2 Improvements have proven to be sustainable. 3 Measures have been put in place to monitor process performance. 4 Documentation has been updated (pFMEA, Control Plan, SOPs). 5 Training has been performed for the new process. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 9 Controller signed that project savings / benefits have been achieved.   Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' is available and sufficient. 2 Improvements have proven to be sustainable. 3 Measures have been put in place to monitor process performance. 4 Documentation has been updated (pFMEA, Control Plan, SOPs). 5 Training has been performed for the new process. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 9 Controller signed that project savings / benefits have been achieved.