PAC47 Charge Robert McKeown PAC47 July 29, 2019.

Slides:



Advertisements
Similar presentations
Department of Computer Science Faculty of Science Research Methods Supervision.
Advertisements

Copyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved SDR Forum Document Development Process.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Role of the Executive Secretary Gail Dapolito Advisory Committee Coordinator Div. Scientific Advisors and Consultants Center for Biologics Evaluation and.
Chesapeake Bay Program Goal Development, Governance, and Alignment Carin Bisland, GIT6 Vice Chair.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Jay Pearlman, IEEE Siri Jodha Singh Khalsa, IEEE Report to GEO Committees February 2008.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Questions for the Workshop. Questions as Identified on the Workshop Website 1.What is necessary to understand the elementary process of electro- production.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
SARC: Participation and Protocol / Concept Review Robert Maki, MD PhD Memorial Sloan-Kettering Cancer Center.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
CTN Study Submission & Review Process Update June 2 nd, 2015.
Jefferson Lab Status APEX Meeting April 22, 2014 R. D. McKeown Deputy Director For Science.
The PAC36 Presentation Curtis A. Meyer Carnegie Mellon University 12-May-2010.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Geant4 Publication Procedures Geant4 Collaboration Meeting 23 September 2013 Dennis Wright (SLAC)
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
PAC37 Charge 1 1.) Review new proposals, previously conditionally approved proposals, and letters of intent † † for experiments that will utilize the 12.
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 5-6, 2003 Dubna, Russia.
Jefferson Lab Science Program R. D. McKeown Jefferson Lab Users Meeting June 3, 2014.
PAS Neighbourhood Planning Workshop  background  neighbourhood planning is becoming well established – widespread engagement, court cases, ministerial.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Stage 3. Consultation and Review Standard Setting Training Course 2016.
Reappointment, Tenure and Promotion (RTP) Processes and Procedures
Polices, procedures & protocols
Jefferson Lab Overview
Updating the Regulation for the JINR Programme Advisory Committees
July Session Supplementary Material
NATA Foundation General Grants Program Process
Report to UGBOD Bob McKeown January 14, 2016.
SPECIAL COMMITTEE RECOMMENDATIONS STATUS CTS Fall Planning Meeting San Marcos September 6, 2013 Don Drumtra Good morning.
BASIC IRRS TRAINING Lecture 17
PAC38 Charge 1.) Review new proposals, previously conditionally approved proposals, and letters of intent† for experiments that will utilize the 12 GeV.
Preparing for Capstones Analytics Computer Information Science
Project Grant: Fall 2016 Competition
Jefferson Lab Status Bob McKeown May 6, 2016.
HCS 455 TUTORS Lessons in Excellence -- hcs455tutors.com.
OFFICE OF THE CITY CLERK SEPTEMBER 22, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING.
Advisory Council of Instruction
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Jefferson Lab Status Bob McKeown October 21, 2015.
View from Lab Management HPS Collaboration Meeting
FSGP Process Step 1: Review of Scientific Merit
RTA TIG Agenda Date: Authors: March 2019
Schedule Rolf Ent HPS Meeting, May 22, 2018.
July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda July 2018 Plenary] Date Submitted:
Jim Gaa, Chair, Part C Task Force IESBA Meeting New York July 8, 2014
Submission Title: TG 4n discussion items for September 2015 meeting
CCWG Accountability Recommendations
Air Resource Specialists, Inc. July 23, 2004
Green Infrastructure: Working method
General Discussion Conclusions:
Agenda and minutes TGn PSMP ad hoc
NATA Foundation General Grants Program Process
May 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for TG w May 2019 Interim Meeting]
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda September 2019 Interim]
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda September 2019 Interim]
Presentation transcript:

PAC47 Charge Robert McKeown PAC47 July 29, 2019

Approved experiments Topic Hall A Hall B Hall C Hall D Other Total The Hadron spectra as probes of QCD 2 1 3 6 The transverse structure of the hadrons 13 The longitudinal structure of the hadrons 7 12 The 3D structure of the hadrons 5 9 20 Hadrons and cold nuclear matter 8 21 Low-energy tests of the Standard Model and Fundamental Symmetries 24 23 79 Total Experiments Completed 7.0 8.0 4.9 1.2 21.1 Total Experiments Remaining 17.0 15.0 19.1 3.8 3.0 57.9

Approved Experiments – PAC Days Topic Hall A Hall B Hall C Hall D Other Total The Hadron spectra as probes of QCD 219 11 540 770 The transverse structure of the hadrons 150.5 85 110 25 370.5 The longitudinal structure of the hadrons 65 230 211 506 The 3D structure of the hadrons 409 872 197 1478 Hadrons and cold nuclear matter 220 275 205 14 714 Low-energy tests of the Standard Model and Fundamental Symmetries 547 180 79 60 866 Total Days 1392 1861 734 644 74 4704.5 Total Days - Without SoLID 917.5 28 4184.5 Total Approved Run Group Days (includes MIE) 1026 691 444 3626.5 Total Approved Run Group Days (without SoLID) 3106.5 Total Days Completed 176.5 191 118.0 138 623.5 Total Days Remaining 741 835 573 306 2483 A Decade of Experiments!

PAC47 5 new proposals 3 run group additions 7 letters of intent Charge: Review new proposals, previously conditionally approved proposals, and letters of intent for experiments that will utilize the 12 GeV upgrade of CEBAF and provide advice on their scientific merit, technical feasibility and resource requirements.   Identify proposals with high-quality physics that, represent high quality physics within the range of scientific importance represented by the previously approved 12 GeV proposals and recommend for approval. Also provide a recommendation on scientific rating and beam time allocation for proposals newly recommended for approval. Identify other proposals with physics that have the potential for falling into this category pending clarification of scientific and/or technical issues and recommend for conditional approval. Provide comments on technical and scientific issues that should be addressed by the proponents prior to review at a future PAC.

Conditional Approval Two types: C1 – Approval pending technical review, no need to return to PAC C2 – Approval pending further review by future PAC

Proposals with Parallel Running Parallel running procedure – Intent is to encourage new proposals of “run groups” – Summary only of additions to existing run group (PAC to comment)

Finalized after discussion with UGBOD in September 2016 Rationale Jeopardy Policy Finalized after discussion with UGBOD in September 2016 Rationale Use normal yearly PAC for ~4 years to address all presently approved proposals that have not been scheduled, plus new proposals in the next few years. Estimate ~5-10 proposals per meeting Will start in 2019 to reach steady state in 2024 - proposals that have been approved for 4 years or more but are not scheduled will be considered in Jeopardy.

Jeopardy considerations 1) Is there any new information that would affect the scientific importance or impact of the Experiment since it was originally proposed? 2) If the Experiment has already received a portion of its allocated beam time, the spokespersons should provide an analysis of existing data to demonstrate that the results are impactful, and that the additional time will provide substantial further impact. 3) Should the remaining beam time allocation and experiment grade be reconsidered?

Policy on Equipment Availability Categories for resource availability: – Stage I: resources need to be identified/obtained – Stage II: resources are essentially available This will be considered a Laboratory issue (not for PAC).

High Impact For newly approved Stage II proposals, PAC should consider if any of these should be included in the “High Impact” category to receive priority for scheduling in the early (first 3-5 years) running. (Since we are in the 2nd full year – do we continue this process?)

PAC Report Draft report text must be complete before closeout on Thursday. We will review all the draft text Thursday morning before the closeout. Susan Brown will assemble the draft text into a report for a final round of edits by email during 2 weeks following the PAC meeting.

Role of User Chair on PAC Monitor communications between PAC and spokespersons – identify issues. Monitor PAC meeting proceedings for conflicts of interest. Monitor PAC meeting proceedings to identify issues of fairness and ethical behavior. Participate in all scientific discussions to provide additional expertise (except where there is a conflict of interest)

Communication with PAC Communication with PAC members should be limited to: Submission of proposal before the deadline Presentation/discussion at PAC meeting, must be in- person (not remote connection) Responses from spokespersons and/or contact person to inquiries from PAC for further information or clarification Note: TAC and Theory reports are not public documents – please do not distribute beyond your collaboration.

New Proposals for PAC47 002, 003, 004, would be Stage II if approved 001, 005 would be Stage I if approved

Parallel Running Additions These run in parallel with previously approved or conditionally approved proposals. So they are considered already approved (or conditional) and are presented by collaborations – the PAC will provide a written comment for each of these in the report.

Letters of Intent 50 Letters of intent will be given the same “rights” to their scientific ideas as are currently afforded to deferred experiments: LOI has established a claim to a physics measurement that lasts for the next two successive PAC meetings.

Jeopardy